Skip to content
You Start with one site
Amounts in Start with one site
Who it is for · Solar financiers and lessors

You are paid for the power the plant delivers. When it delivers less, owner, installer and grid each blame another, and the argument costs more than the shortfall.

For funds, lessors and banks whose money is in solar plants on other people’s roofs.

The record

The numbers you answer for, on one page

What you answer for
  • Energy delivered against energy expected
  • Hours the plant was available
  • Hours down, and whether the cause was the grid or the plant
  • The value of the month’s invoice
What the record gives you
  • One record in one form for every plant, whatever the make of inverter
  • Every stop, with its time and its cause
  • A shortfall divided into grid, plant and weather
  • The month set against the month before
SiliconWit
Monthly record
Example
SiteRooftop solar plant, 100 kWp
Period1 to 31 October 2026
Lost this month
KSh3,400USD26
170 kWh, two events
Loss avoided
KSh23,400USD180
fault repaired in 2 days, not 20
Output against expected
98.6%
11,920 of 12,090 kWh
Energy produced each day, kWhExpected 390 kWh
1 Oct: 390 kWh2 Oct: 390 kWh3 Oct: 390 kWh4 Oct: 390 kWh5 Oct: 390 kWh6 Oct: 390 kWh7 Oct: 390 kWh8 Oct: 390 kWh9 Oct: 390 kWh10 Oct: 390 kWh11 Oct: 390 kWh12 Oct: 350 kWh13 Oct: 325 kWh14 Oct: 365 kWh15 Oct: 390 kWh16 Oct: 390 kWh17 Oct: 390 kWh18 Oct: 390 kWh19 Oct: 390 kWh20 Oct: 390 kWh21 Oct: 350 kWh22 Oct: 390 kWh23 Oct: 390 kWh24 Oct: 390 kWh25 Oct: 390 kWh26 Oct: 390 kWh27 Oct: 390 kWh28 Oct: 390 kWh29 Oct: 390 kWh30 Oct: 390 kWh31 Oct: 390 kWh 12 to 14 Oct: one string out21 Oct: grid outage 1 Oct 15 31 Oct

1What happened

WhenEventResponse
12 Oct, 10:40String 4 stopped producing. Output fell by one sixth.Site manager notified at 10:41.
14 Oct, 11:15Fuse replaced. Output returned to normal.Closed by the site manager.
Figures are an example, at KSh 20USD 0.15 per kWh. Page 1 of 1
What the record is not

The record supports your invoice and your contract. It does not replace the contract meter, and it is not a legal opinion on who pays for a shortfall.

Kenya had about 300 MW of solar generating power for its own owner by June 2025 (EPRA energy statistics report).