Payback and net present value

One idea Beginner 5 min read
Found this useful?

Lend a neighbour 100 USD and you ask two things. When does the money come back? And is the loan worth more to me than keeping the money? A project that saves energy is the same loan. Simple payback is the time the savings need to return the cost, and net present value (NPV) is what all the savings are worth today, after the cost is paid.

Same payback?Both cost 6,000 USD and both save 2,000 USD a year.3.0 years each
Same life?One is worn out after 4 years. The other works for 15.Payback does not see this
Same value?Count every saving in today's money and subtract the cost.This is net present value

See it

Predict first

Two projects each cost 6,000 USD and each has an estimated saving of 2,000 USD a year. The equipment of the first lasts 4 years. The equipment of the second lasts 15 years. Which has the shorter simple payback?

See it: each year's saving, in today's money

Simple payback
Payback in today's money
Net present value

The project costs 6,000 USD and has an estimated saving of 2,000 USD a year. Each outline is one year's saving. The filled part is what it is worth today: the later the year and the higher the discount rate, the smaller it is. Striped bars return the cost. Solid bars after them are the surplus.

The idea

Simple payback asks one question: how soon does the cost return? It treats a saving in year 10 like a saving today, and it stops counting at the moment the cost is returned.

simple payback = C0 ÷ S

C0 the cost paid at the start, S the saving in one year. The answer is in years

Money that arrives later is worth less, because money in hand today can earn interest or repay a loan. The discount rate i is that yearly rate. A saving S received in year n has a present value of S ÷ (1 + i)n. Net present value adds the present values of all the years of the life, N, and subtracts the cost.

NPV = −C0 + S ÷ (1 + i)1 + S ÷ (1 + i)2 + … + S ÷ (1 + i)N

i as a fraction: 12% is 0.12. A positive NPV means the project returns its cost, pays for the money, and leaves a surplus

The saving is an estimate, and both numbers are only as good as it is.

One worked number

The question

A project costs 6,000 USD and has an estimated saving of 2,000 USD a year. The equipment lasts 4 years. The discount rate is 12%. Find the simple payback and the net present value.

Show the worked solution, 3 steps
  1. Find the simple payback

    6,000 ÷ 2,000 = 3.0 years.

  2. Bring each year's saving to today

    Divide by 1.12 once for each year: 2,000 ÷ 1.12 = 1,786 USD, then 1,594 USD, 1,424 USD and 1,271 USD. The sum is 6,075 USD.

  3. Subtract the cost

    NPV = 6,075 − 6,000 = 75 USD. Four years of saving barely pay for the project. In the figure, press the button for 15 years: the NPV becomes 7,622 USD and the simple payback does not move.

The mistake to avoid

A short payback does not make a project good. Payback says how soon the cost returns. It says nothing about what the project earns after that, so it gives the same score to equipment that lasts 4 years and equipment that lasts 15. Use it as a first screen for small, low risk work, and write the life beside it. For a larger decision, find the net present value.

A second trap: a continuing cost, such as extra maintenance, must be subtracted from the saving before either number is found.

Check yourself

Question 1

A new motor costs 12,000 USD. Its estimated saving is 4,800 USD a year, and it needs 800 USD a year of extra maintenance. What is the simple payback?

Question 2

Project X pays back in 2.5 years and lasts 5 years. Project Y pays back in 4 years and lasts 20 years. A manager chooses X because its payback is shorter. What has the manager not looked at?

Question 3

The discount rate is 10%. What is a saving of 1,000 USD, received in 2 years, worth today?

Where you meet it

  • A variable speed drive on a pumpThe supplier states a payback, and the life of the drive and its maintenance decide whether the project is worth the money.
  • A solar plant on a factory roofThe cost is paid in year 0 and the savings arrive over 20 years or more, so the discount rate decides the answer.
Key points
  • Simple payback = cost ÷ saving of one year. It ignores the life and the date of each saving.
  • A saving in year n is worth S ÷ (1 + i)n today.
  • Net present value is the sum of those present values minus the cost. Positive means worth doing at that discount rate.
  • The saving is an estimate, and both numbers depend on it.