A bus company must own enough buses for the busiest hour of the day, even if half of them stand idle at noon. An electricity supplier is in the same position: its lines and transformers must be large enough for the heaviest half-hour of each customer. Maximum demand is the highest average power that a site takes in any one metering interval of the month, and many bills charge for it separately from the energy.
See it
A cold store has a demand charge on its bill. What sets the size of that charge for the month?
Each bar is the average power of one half-hour. After lunch the conveyors, the fans and the blast freezer all restart, and each is at its heaviest in its first half-hour. Move the restart of one machine and the highest bar changes, while the energy of the day stays the same. The charge uses the example tariff of the lesson: 800 currency units for each kVA.
The idea
A bill for a factory or a large building usually has two main lines. The energy charge is a price for each kWh, and every hour of the month adds to it. The demand charge is a price for each kW or kVA of maximum demand.
The meter does not look for the highest instant. It divides time into demand intervals, often 30 minutes, calculates the average power of each, and keeps the highest. A 30 day month has 1,440 intervals, and one of them decides this line.
Where demand is charged in kVA, it is the kW divided by the power factor, so a low power factor makes the same peak cost more.
A peak is rarely one large machine. It is several machines that run together, each near full load, for most of one interval: at a shift start, or after a break or a power cut.
One worked number
A site pays 800 currency units for each kVA of maximum demand. Its highest half-hour is 150 kVA, when everything restarts together after lunch. If one machine restarts half an hour later, the highest falls to 136.8 kVA. How much lower is the demand charge each month?
Show the worked solution, 3 steps
- The charge now
150 kVA × 800 = 120,000 currency units a month.
- The fall in maximum demand
150 − 136.8 = 13.2 kVA.
- The saving
13.2 kVA × 800 = 10,560 currency units a month, for the same kWh. Check it in the figure: press the button for a restart at 14:30 and read the charge, 109,440.
The mistake to avoid
A second trap: one bad half-hour sets the charge for the whole month. A site that keeps its peak low on 29 days pays for the restart on day 30.
Check yourself
The highest half-hour of a month is 90 kW, at a power factor of 0.90. The tariff charges 800 currency units for each kVA of maximum demand. What is the demand charge?
A manager wants to lower the demand charge and proposes a soft starter, a device that reduces the starting current of the largest motor. The start lasts about 10 seconds. What effect will it have on the demand charge?
In the figure, the freezer restart is moved from 14:00 to 14:30. Which lines of the bill change?
Where you meet it
- A cold store after a power cutEvery compressor and fan restarts together and works hard in the same interval.
- A factory at the start of a shiftMachines switched on in turn over an hour give a lower peak than machines switched on together.
- Water pumpingPumps that fill tanks can often run at different times.
- The monthly billThe line in kVA or kW, with its own price, is the maximum demand.
- Energy (kWh) is how much you used. Maximum demand (kW or kVA) is the highest rate at which you used it.
- The meter keeps the highest average of any one interval, often 30 minutes, in the month.
- Loads that run together set the peak. A start of a few seconds does not.
- Starting machines in turn lowers the demand charge and uses the same energy.
Discussion
No comments yet. Questions, results from your own build, a better way to explain it: all welcome.
My notes on this page
Kept on this device only. Nothing is sent anywhere.
Tip: select words in the lesson, or tap a figure or an equation, to put a note right there.
Notes on earlier wording
The lesson has changed and these words are no longer in it. Your notes are kept, with the words you chose.