Capacitor rating for a target power factor
Power Factor and Its Correction
On this page
A site pays for 42,000 kWh, and then pays almost a quarter more because its average power factor was 0.78. It did not use more energy than a neighbour with the same machines. It drew more current for the same work, and the supplier charged for that twice: once in the kVA of maximum demand and once as a penalty. A capacitor bank can remove most of that cost, but a bank of the wrong size or kind brings new problems, and some sellers promise savings that it cannot give. This lesson shows where a low power factor comes from, how to size the correction, and how to count the money honestly. #PowerFactor #CapacitorBank #DemandCharge
Learning Objectives
By the end of this lesson, you will be able to:
- Explain why lightly loaded motors give a site a low power factor
- Size a capacitor bank to move a load from one power factor to another
- Calculate the new kVA, the fall in line current and the transformer capacity that the correction releases
- Work out the change in a bill that has an energy charge, a demand charge and a power factor surcharge
- Recognise the limits of correction: what it does not save, over-correction, and resonance with harmonics
Real-World System Problem: A site that pays for current it does not need
Site E is a cold store on a 200 kVA transformer at 415 V, three-phase, 50 Hz. Its loads are induction motors, lighting and sockets. In a month it uses 42,000 kWh. Its meter records a maximum demand of 150 kVA and an average power factor of 0.78 lagging.
At that power factor the real power at the peak is only 117 kW. The rest of the 150 kVA is reactive power for the magnetic fields of the motors, which travels from the supplier’s network through the transformer and the main cable to the motors and back, in every cycle. The site pays a demand charge on all 150 kVA, and its supplier adds a surcharge because the average power factor is below 0.90.
A capacitor bank at the main board can supply most of that reactive power locally. The motors still receive it, but it no longer comes through the meter and the transformer. The questions are how many kvar to fit, in what form, and what the bill will be afterwards.
Fundamental Theory: Supplying reactive power where it is used
This lesson uses the quantities of the power triangle: real power
Where a low power factor comes from
An induction motor needs a rotating magnetic field before it can deliver any torque. The current that makes the field is called the magnetising current. It lags the voltage by almost
When the load on the shaft falls, the real power falls with it, but the magnetising kvar stays almost the same. The triangle becomes short and tall, and the power factor falls.
| Load on a typical 4-pole motor | Typical power factor |
|---|---|
| Full load | about 0.84 |
| Half load | about 0.70 |
| Quarter load | about 0.50 |
| No load | 0.2 or lower |
These are typical values, not data for one machine. The maker’s data sheet gives the real curve. The conclusion is general: a site full of oversized or lightly loaded motors has a low power factor. Lightly loaded transformers, welding sets and old lighting ballasts with iron cores add to the same effect.
What a capacitor does
A capacitor takes a current that leads the voltage by
With a capacitor beside the motor, the energy is exchanged between the two of them. The supply sends only the real power and the part of the reactive power that the capacitor does not cover. For the motor nothing changes: its voltage, current, field and torque are the same.
In the notation of this course a lagging load has positive
Sizing the capacitor
Before correction the load has power factor
The line current falls in the same ratio as the kVA:
Why the target is not 1.00
Each step towards unity power factor costs more kvar and releases less kVA. For site E at its peak of 117 kW, the script at the end of this lesson gives these values.
| Power factor | Capacitor (kvar) | Demand (kVA) | kVA released |
|---|---|---|---|
| 0.78 (now) | 0 | 150.0 | 0 |
| 0.90 | 37.2 | 130.0 | 20.0 |
| 0.95 | 55.4 | 123.2 | 26.8 |
| 1.00 | 93.9 | 117.0 | 33.0 |
The first 37.2 kvar release 20.0 kVA. The last 38.5 kvar, from 0.95 to 1.00, release only 6.2 kVA. A target of 1.00 also leaves no margin against a leading power factor. Most sites therefore aim for 0.95 to 0.98, above the level at which the supplier’s penalty begins.
Where to place the capacitors
A capacitor relieves only the equipment between itself and the supply. Everything between the capacitor and the motor still carries the full motor current.
- A central bank at the main board corrects the whole site. It reduces the kVA at the meter and unloads the transformer, but not the cables inside the site. This is the usual choice when the aim is the bill.
- A group bank at a sub-board also relieves the feeder from the main board. It suits one heavy workshop at the end of a long cable.
- A capacitor at one motor is switched with the motor, so it is never connected when the motor is off, and it relieves the motor feeder as well. It suits a large motor that runs for many hours. It is not suitable for every starter, and a capacitor must never be connected between a variable speed drive and its motor. Its size is limited: when the motor is switched off it keeps turning for a while, and a capacitor larger than the motor’s own magnetising kvar at no load can keep its field alive, so that the motor acts as a generator and its voltage rises well above the supply. Makers therefore limit a capacitor at the motor to about 90 percent of the no-load magnetising kvar,
with the no-load current, and give a table of the largest size for each motor.
Switched steps
The reactive power of a site changes through the day as motors start and stop. A fixed capacitor that is correct at the peak is too large at night. For this reason a central bank is built from several steps, each with its own contactor and fuses, and a controller that measures the reactive power at the incomer and connects only the steps that are needed. Steps of 12.5 kvar and 25 kvar are common sizes at this voltage.
The delay matters. A capacitor that has just been disconnected still holds charge, and the controller must wait until it has discharged before it connects that step again. The delay also prevents switching on every short change of load, which would wear the contactors.
What correction saves, and what it does not
Correction reduces the current between the capacitors and the supply. From that one fact come all its benefits:
- a lower maximum demand in kVA, where the tariff charges for kVA,
- no power factor surcharge, where the tariff has one,
- spare capacity in the transformer and the main cable, which can delay the cost of larger equipment,
- slightly lower heating losses and voltage drop in the cables and transformer upstream of the capacitors.
It does not do these things:
- It does not reduce the kWh that the loads themselves use. A motor does the same work with the same real power, and its own current, efficiency and temperature are unchanged.
- It saves nothing on a tariff that charges only for kWh, apart from the small reduction in cable losses. Most homes are billed this way, so a device sold to a household as a power factor “energy saver” cannot give the saving it promises.
- It does not correct the distortion caused by drives and other electronic loads.
Over-correction
When more capacitance is connected than the load needs, the net reactive power becomes negative and the power factor becomes leading.
A leading load still draws current for its excess kvar, so the kVA and the cable loading rise again. Take site E on a quiet night with 30 kW of load at 0.78 and suppose a fixed bank of 62.5 kvar stays connected. The load needs 24.1 kvar. The supply now sees 38.4 kvar leading, a power factor of 0.615 leading, and 67.8 A in the main cable. Without any bank the current would be 53.5 A.
A capacitor also raises the voltage at its terminals, because its leading current flows through the inductance of the transformer. For a bank of
where
Over-correction is more serious on a standby generator, which can absorb only a limited amount of leading kvar before its voltage regulator loses control. Many sites disconnect the bank when the generator runs. The limit comes from the generator maker.
Resonance with harmonics
A capacitor bank and the inductance of the transformer form a circuit with a natural frequency, and that frequency can lie close to one of the harmonic frequencies that drives and other electronic loads inject. A common estimate of the resonant order is
Application 1: A capacitor bank for site E
Step 1: Real and reactive power at the maximum demand
Click to reveal the starting triangle
-
Real power.
This value does not change when capacitors are added. ✅
-
Reactive power.
and . The supply provides 93.87 kvar at the peak. ✅
-
Line current.
Each line of the main cable carries 208.7 A. ✅
Step 2: The capacitor rating
Click to reveal the kvar required
-
Target angle.
and . ✅ -
Reactive power that may remain.
At 0.95 the supply still provides 38.46 kvar. ✅
-
Capacitor rating.
The bank must give 55.41 kvar at the peak. ✅
Step 3: New kVA, current and transformer loading
Click to reveal what the correction releases
-
New apparent power.
The maximum demand falls from 150 kVA to 123.2 kVA. ✅
-
New line current.
The current falls by 37.3 A (from the unrounded values), which is 17.9 percent. ✅
-
Released transformer capacity.
The transformer loading falls from 75.0 percent to 61.6 percent, and its spare capacity rises from 50.0 kVA to 76.8 kVA. ✅
-
Check by the triangle. The reactive power after correction is
, so This second route gives the same kVA as item 1. ✅
Step 4: A standard bank made of steps
Click to reveal the choice of bank
-
Number of steps.
, so four steps are not enough. Five steps give . ✅ -
Four steps at the peak.
, and the power factor is 0.936. The target is not reached. ✅ -
Five steps at the peak.
, and the power factor is 0.966. The target is reached and the load is still lagging. ✅ -
Choice. An automatic bank of 62.5 kvar in five steps of 12.5 kvar. ✅
Step 5: The same bank at an ordinary moment
Click to reveal why the bank needs steps
-
Load at this moment. Add kW and kvar separately.
So
, the power factor is 0.854 and the line current is 117.7 A. ✅ -
kvar needed for 0.95.
The peak needed 55.41 kvar. ✅
-
Steps connected. One step leaves 31.55 kvar and a power factor of 0.916. Two steps leave 19.05 kvar and give 0.967, with 74.67 kVA and 103.9 A. The controller connects two steps. ✅
-
All five steps at this moment. The net reactive power would be
, which is leading. A fixed bank sized for the peak would over-correct for most of the day. ✅ -
Check with the script. The Python script prints 55.41 kvar, 123.16 kVA and 171.3 A for the peak, a power factor of 0.966 with five steps, and 0.967 with two steps at the ordinary moment. ✅
Application 2: The money, with an example tariff
Step 1: The bill before correction
Click to reveal the first bill
-
Energy charge.
This line depends only on the kWh. ✅
-
Demand charge.
This line depends on the highest kVA of the month. ✅
-
Bill before the surcharge.
currency units. ✅ -
Surcharge rate. The power factor is
below the limit, which is 12 steps of 0.01. The rate is percent. ✅ -
Surcharge and total.
The site pays 773,760 currency units for the month. ✅
Step 2: The bill after correction
Click to reveal the second bill
-
Energy charge. The kWh are the same, so the charge is still 504,000 currency units. ✅
-
Demand charge.
The demand charge falls by 21,440 currency units. ✅
-
Surcharge. The average power factor of 0.95 is above 0.90, so the surcharge is zero. ✅
-
Total.
The site pays 602,560 currency units for the month. ✅
Step 3: The saving and where it comes from
Click to reveal the saving
-
Monthly saving.
This is 22.1 percent of the first bill. ✅
-
Split. The surcharge gives 149,760 of the saving and the demand charge gives 21,440. The energy charge gives nothing. ✅
-
Stopping at 0.90. A smaller bank that only reaches the limit of 0.90 needs 37.2 kvar and gives a demand of 130.0 kVA. The bill is then
currency units and the saving is 165,760. Going on to 0.95 adds only 5,440 currency units a month, but it keeps a margin above the limit. ✅ -
Check with the script. The script builds both bills from the tariff rule and prints totals of 773,760 and 602,560 currency units and a saving of 171,200. ✅
Verify It in Python
The script sizes the bank at the maximum demand, lists the power factor for each number of steps at the peak and at the ordinary moment, tests a light load with the whole bank connected, and builds both bills from the tariff rule. The plot shows the two power triangles and the two bills.
"""Power factor correction of site E: the capacitor bank, the current, and the bill."""import numpy as npimport matplotlib.pyplot as plt
V_L = 415.0 # line voltage, VROOT3 = np.sqrt(3.0)S_TX, Z_TX = 200.0, 0.045 # transformer D: kVA and impedance (per unit)CU_LOSS = 2.8 # transformer D full-load copper loss, kW
S1, PF1, PF2 = 150.0, 0.78, 0.95 # month's maximum demand, kVA, before / targetENERGY = 42000.0 # kWh in the monthRATE_KWH, RATE_KVA = 12.00, 800.0 # tariff G, currency unitsPF_LIMIT, SURCHARGE_STEP = 0.90, 0.02 # 2 % of the bill for each 0.01 below 0.90STEP = 12.5 # kvar in one switched step
def amps(s_kva): return s_kva * 1000.0 / (ROOT3 * V_L)
def bill(demand_kva, pf_avg): """Return energy charge, demand charge, surcharge and total.""" energy = ENERGY * RATE_KWH demand = demand_kva * RATE_KVA points = max(0, int(round((PF_LIMIT - pf_avg) * 100.0))) surcharge = SURCHARGE_STEP * points * (energy + demand) return energy, demand, surcharge, energy + demand + surcharge
# ---------- Part 1: size the bank ----------P = S1 * PF1t1, t2 = np.tan(np.arccos(PF1)), np.tan(np.arccos(PF2))Q1 = P * t1QC = P * (t1 - t2)S2 = P / PF2print("Sizing at the month's maximum demand")print(f" P = {P:.1f} kW, tan(phi1) = {t1:.4f}, tan(phi2) = {t2:.4f}")print(f" Q before = {Q1:.2f} kvar, Q after = {P * t2:.2f} kvar")print(f" capacitor needed Qc = {QC:.2f} kvar")print(f" S: {S1:.1f} -> {S2:.2f} kVA (released {S1 - S2:.2f} kVA)")print(f" line current: {amps(S1):.1f} -> {amps(S2):.1f} A " f"(fall {amps(S1) - amps(S2):.1f} A, {100.0 * (1.0 - S2 / S1):.1f} %)")print(f" transformer D loading: {100.0 * S1 / S_TX:.1f} -> {100.0 * S2 / S_TX:.1f} %, " f"spare {S_TX - S1:.1f} -> {S_TX - S2:.1f} kVA")cu1, cu2 = CU_LOSS * (S1 / S_TX) ** 2, CU_LOSS * (S2 / S_TX) ** 2print(f" transformer copper loss at the peak: {cu1:.2f} -> {cu2:.2f} kW")print(f" Qc for the limit of {PF_LIMIT:.2f} only: " f"{P * (t1 - np.tan(np.arccos(PF_LIMIT))):.2f} kvar, S = {P / PF_LIMIT:.1f} kVA")
# ---------- Part 2: a bank made of steps ----------print(f"Bank made of {STEP} kvar steps, at the peak")steps = np.arange(0, 7)s_steps = np.hypot(P, Q1 - steps * STEP)for n in steps: q_net = Q1 - n * STEP print(f" {n} steps = {n * STEP:5.1f} kvar: Q {q_net:6.2f} kvar, " f"S {s_steps[n]:6.2f} kVA, pf {P / s_steps[n]:.3f}")n_need = int(np.ceil(QC / STEP))BANK = n_need * STEPprint(f" smallest bank that reaches {PF2:.2f}: {n_need} steps = {BANK:.1f} kvar")
# ---------- Part 3: one ordinary moment (three loads running) ----------loads = [(24.2, 0.84), (18.0, 0.95), (30.0, 0.80)] # kW input, power factorp_m = sum(p for p, _ in loads)q_m = sum(p * np.tan(np.arccos(pf)) for p, pf in loads)print("One moment: motor A, lighting and sockets, three smaller motors")print(f" P = {p_m:.1f} kW, Q = {q_m:.2f} kvar, S = {np.hypot(p_m, q_m):.2f} kVA, " f"pf {p_m / np.hypot(p_m, q_m):.3f}, {amps(np.hypot(p_m, q_m)):.1f} A")print(f" kvar needed for {PF2:.2f}: {q_m - p_m * t2:.2f}")for n in range(0, 4): q_net = q_m - n * STEP s_net = np.hypot(p_m, q_net) print(f" {n} steps: Q {q_net:6.2f} kvar, S {s_net:5.2f} kVA, " f"pf {p_m / s_net:.3f}, {amps(s_net):.1f} A")
# ---------- Part 4: light load with the whole bank left on ----------P_LIGHT = 30.0q_light = P_LIGHT * t1 - BANKs_light = np.hypot(P_LIGHT, q_light)s_fault = S_TX / Z_TXprint("Light load of 30 kW at 0.78 with the whole bank connected")print(f" net Q = {q_light:.2f} kvar (negative means leading), " f"S = {s_light:.2f} kVA, pf = {P_LIGHT / s_light:.3f} leading")print(f" current {amps(s_light):.1f} A against {amps(P_LIGHT / PF1):.1f} A " f"with no bank")print(f" short-circuit level at the board about {s_fault:.0f} kVA")print(f" voltage rise from {BANK:.1f} kvar: about {100.0 * BANK / s_fault:.2f} % " f"= {V_L * BANK / s_fault:.1f} V")print(" resonance order with n steps connected:")print(" " + ", ".join(f"{n}: {np.sqrt(s_fault / (n * STEP)):.1f}" for n in range(1, n_need + 1)))
# ---------- Part 5: the bill ----------S2_BILL = round(S2, 1)before = bill(S1, PF1)after = bill(S2_BILL, PF2)print("Monthly bill with tariff G (currency units)")for label, b in (("before", before), ("after", after)): print(f" {label:>6}: energy {b[0]:,.0f} demand {b[1]:,.0f} " f"surcharge {b[2]:,.0f} total {b[3]:,.0f}")print(f" saving: demand {before[1] - after[1]:,.0f} + surcharge " f"{before[2] - after[2]:,.0f} = {before[3] - after[3]:,.0f} per month " f"({100.0 * (1.0 - after[3] / before[3]):.1f} % of the bill)")at_limit = bill(round(P / PF_LIMIT, 1), PF_LIMIT)print(f" at {PF_LIMIT:.2f} only: total {at_limit[3]:,.0f}, " f"saving {before[3] - at_limit[3]:,.0f}")real_peak = bill(round(float(s_steps[n_need]), 1), PF2)print(f" with all {n_need} steps in at the peak ({s_steps[n_need]:.1f} kVA): " f"total {real_peak[3]:,.0f}")print(f" energy charge is the same in every case: {before[0]:,.0f}")
# ---------- Plot ----------fig, ax = plt.subplots(1, 2, figsize=(10, 4.5))ax[0].plot([0, P], [0, 0], "k-")ax[0].plot([P, P], [0, Q1], "k-")ax[0].plot([0, P], [0, Q1], label=f"before: {S1:.0f} kVA, pf {PF1:.2f}")ax[0].plot([0, P], [0, P * t2], label=f"after: {S2:.1f} kVA, pf {PF2:.2f}")ax[0].annotate("", xy=(P, P * t2), xytext=(P, Q1), arrowprops=dict(arrowstyle="->", color="tab:red"))ax[0].text(P - 34.0, (Q1 + P * t2) / 2.0, f"Qc = {QC:.1f} kvar")ax[0].set_xlabel("P (kW)")ax[0].set_ylabel("Q (kvar)")ax[0].set_title("Power triangle at the maximum demand")ax[0].set_aspect("equal")ax[0].legend(loc="upper left")names = ("energy", "demand", "surcharge")bottom = np.zeros(2)for k, name in enumerate(names): vals = np.array([before[k], after[k]]) / 1000.0 ax[1].bar(["before", "after"], vals, bottom=bottom, label=name) bottom += valsax[1].set_ylabel("thousand currency units per month")ax[1].set_title("The bill with tariff G")ax[1].legend()fig.tight_layout()fig.savefig("capacitor_bank_and_bill.png", dpi=120)print("Saved capacitor_bank_and_bill.png")Expected output
Sizing at the month's maximum demand P = 117.0 kW, tan(phi1) = 0.8023, tan(phi2) = 0.3287 Q before = 93.87 kvar, Q after = 38.46 kvar capacitor needed Qc = 55.41 kvar S: 150.0 -> 123.16 kVA (released 26.84 kVA) line current: 208.7 -> 171.3 A (fall 37.3 A, 17.9 %) transformer D loading: 75.0 -> 61.6 %, spare 50.0 -> 76.8 kVA transformer copper loss at the peak: 1.57 -> 1.06 kW Qc for the limit of 0.90 only: 37.20 kvar, S = 130.0 kVABank made of 12.5 kvar steps, at the peak 0 steps = 0.0 kvar: Q 93.87 kvar, S 150.00 kVA, pf 0.780 1 steps = 12.5 kvar: Q 81.37 kvar, S 142.51 kVA, pf 0.821 2 steps = 25.0 kvar: Q 68.87 kvar, S 135.76 kVA, pf 0.862 3 steps = 37.5 kvar: Q 56.37 kvar, S 129.87 kVA, pf 0.901 4 steps = 50.0 kvar: Q 43.87 kvar, S 124.95 kVA, pf 0.936 5 steps = 62.5 kvar: Q 31.37 kvar, S 121.13 kVA, pf 0.966 6 steps = 75.0 kvar: Q 18.87 kvar, S 118.51 kVA, pf 0.987 smallest bank that reaches 0.95: 5 steps = 62.5 kvarOne moment: motor A, lighting and sockets, three smaller motors P = 72.2 kW, Q = 44.05 kvar, S = 84.58 kVA, pf 0.854, 117.7 A kvar needed for 0.95: 20.32 0 steps: Q 44.05 kvar, S 84.58 kVA, pf 0.854, 117.7 A 1 steps: Q 31.55 kvar, S 78.79 kVA, pf 0.916, 109.6 A 2 steps: Q 19.05 kvar, S 74.67 kVA, pf 0.967, 103.9 A 3 steps: Q 6.55 kvar, S 72.50 kVA, pf 0.996, 100.9 ALight load of 30 kW at 0.78 with the whole bank connected net Q = -38.43 kvar (negative means leading), S = 48.75 kVA, pf = 0.615 leading current 67.8 A against 53.5 A with no bank short-circuit level at the board about 4444 kVA voltage rise from 62.5 kvar: about 1.41 % = 5.8 V resonance order with n steps connected: 1: 18.9, 2: 13.3, 3: 10.9, 4: 9.4, 5: 8.4Monthly bill with tariff G (currency units) before: energy 504,000 demand 120,000 surcharge 149,760 total 773,760 after: energy 504,000 demand 98,560 surcharge 0 total 602,560 saving: demand 21,440 + surcharge 149,760 = 171,200 per month (22.1 % of the bill) at 0.90 only: total 608,000, saving 165,760 with all 5 steps in at the peak (121.1 kVA): total 600,880 energy charge is the same in every case: 504,000Saved capacitor_bank_and_bill.pngThe resonance line lists the estimated resonant order for one to five steps connected. It shows why the problem can appear at one step and not at another.
Common Mistakes
- Starting the sizing formula from kVA. The formula uses the real power in kW, so convert first with
. - Expecting the kWh to fall. Correction changes the demand charge and the surcharge. The energy used by the loads is the same.
- Fitting one fixed capacitor sized for the peak. At light load it over-corrects, the power factor becomes leading and the voltage rises. Use switched steps, or a capacitor that is switched with its motor.
- Adding a plain capacitor bank to a site with many drives without a harmonic measurement. The bank may resonate with the transformer at a harmonic frequency.
Summary
- A low power factor on an industrial site comes mainly from induction motors that run lightly loaded: their magnetising kvar stays almost constant while their kW falls.
- A capacitor supplies reactive power locally. The rating for a target is
, with unchanged. - For site E at its maximum demand of 150 kVA and 0.78, a correction to 0.95 needs 55.41 kvar. The demand falls to 123.2 kVA, the line current falls from 208.7 A to 171.3 A, and 26.8 kVA of the 200 kVA transformer is released. A standard automatic bank of five 12.5 kvar steps does this.
- On the example tariff the monthly bill falls from 773,760 to 602,560 currency units. The saving is in the demand charge and the surcharge. The energy charge does not change.
- Too much capacitance at light load gives a leading power factor and a voltage rise, which switched steps prevent. A bank on a site with drives can resonate with the transformer, so the harmonics are measured first.
Exercises
1. A site has a maximum demand of 90 kVA at a power factor of 0.82 lagging on a 415 V supply. Find the capacitor rating for a target of 0.92, the new kVA, and the line current before and after.
Answer
2. The site of Exercise 1 uses 20,000 kWh in the month and is billed on the example tariff of this lesson, with an average power factor of 0.82 before correction and 0.92 after. Find the bill before and after, and the monthly saving.
Answer
Before: energy
3. A capacitor is fitted at compressor motor A (415 V, 40.0 A at full load, power factor 0.84) to raise the power factor of its feeder to 0.95. The feeder is 85 m long with a typical resistance of 1.15 mΩ per metre in each conductor. Find the capacitor rating, the new feeder current, and the fall in feeder heating loss. If the motor runs at full load for 14 hours a day and 30 days a month, how many kWh does this save in a month?
Answer
4. At night a site runs 20 kW at a power factor of 0.75 lagging. A fixed capacitor of 37.5 kvar stays connected. Find the net reactive power, the power factor and the line current at 415 V, and compare the current with the value without the capacitor. The short-circuit level at the board is 4444 kVA. Estimate the voltage rise from the capacitor.
Answer
The load needs
References
- J. D. Glover, T. J. Overbye and M. S. Sarma, Power System Analysis and Design, 6th edition, Cengage Learning, 2017.
- S. J. Chapman, Electric Machinery Fundamentals, 5th edition, McGraw-Hill, 2012.
- A. Hughes and B. Drury, Electric Motors and Drives: Fundamentals, Types and Applications, 5th edition, Newnes, 2019.
- R. C. Dugan, M. F. McGranaghan, S. Santoso and H. W. Beaty, Electrical Power Systems Quality, 3rd edition, McGraw-Hill, 2012.
A site with a power factor of 0.78 fits a capacitor bank at its main board and reaches 0.95. The machines do the same work as before. What happens to the kWh that the motors use in a month?
The triangle is drawn to scale for site E at its maximum demand. The base is the real power, 117 kW, and no capacitor changes it. The slider adds steps of 12.5 kvar. Each step shortens the upright side, and the sloping side (the kVA that the supply, the transformer and the main cable carry) becomes shorter with it. Past 93.9 kvar the upright side points down: the power factor is leading and the kVA rise again. Ten steps load the supply as much as five steps do. Which case the numbers show: with no bank the bill is the lesson's 773,760. The button for exactly 0.95 gives the lesson's 123.2 kVA, 171.3 A, 26.8 kVA released and its bill of 602,560. The lesson's real bank of five steps gives 121.1 kVA and 600,880, as its closing note states. The bill here takes the month's average power factor as the power factor at the peak, rounded to 0.01, and it applies the surcharge rule to a leading power factor in the same way. Suppliers differ on both points. The energy charge is the same in every position.
Check yourself
Three questions. Each wrong choice is a mistake people really make, so read the note after you answer.
1. A workshop takes 80 kW at a power factor of 0.70 lagging. What capacitor rating brings it to 0.95?
2. At night the site takes 30 kW at 0.78 lagging. A fixed bank of 62.5 kvar, sized for the peak, stays connected. How does the current in the main cable compare with the current with no bank?
3. The site is at 0.95 with 55.4 kvar. The owner asks for a power factor of exactly 1.00. What does the extra capacitance buy at the peak of 117 kW?
- A quiet night: 30 kW at 0.78 needs 24.1 kvar. The main cable carries 53.5 A.
- A fixed 62.5 kvar bank stays on: 38.4 kvar leading, pf 0.615, and the current rises to 67.8 A.
- The leading current also raises the voltage: 62.5 ÷ 4,444 kVA = 1.4%, about 5.8 V on 415 V.
Discussion
No comments yet. Questions, results from your own build, a better way to explain it: all welcome.
My notes on this page
Kept on this device only. Nothing is sent anywhere.
Tip: select words in the lesson, or tap a figure or an equation, to put a note right there.
Notes on earlier wording
The lesson has changed and these words are no longer in it. Your notes are kept, with the words you chose.