Power Factor and Its Correction

Lesson 4 of 10 26 min read
Found this useful?

A site pays for 42,000 kWh, and then pays almost a quarter more because its average power factor was 0.78. It did not use more energy than a neighbour with the same machines. It drew more current for the same work, and the supplier charged for that twice: once in the kVA of maximum demand and once as a penalty. A capacitor bank can remove most of that cost, but a bank of the wrong size or kind brings new problems, and some sellers promise savings that it cannot give. This lesson shows where a low power factor comes from, how to size the correction, and how to count the money honestly. #PowerFactor #CapacitorBank #DemandCharge

Learning Objectives

By the end of this lesson, you will be able to:

  1. Explain why lightly loaded motors give a site a low power factor
  2. Size a capacitor bank to move a load from one power factor to another
  3. Calculate the new kVA, the fall in line current and the transformer capacity that the correction releases
  4. Work out the change in a bill that has an energy charge, a demand charge and a power factor surcharge
  5. Recognise the limits of correction: what it does not save, over-correction, and resonance with harmonics

Real-World System Problem: A site that pays for current it does not need



Site E is a cold store on a 200 kVA transformer at 415 V, three-phase, 50 Hz. Its loads are induction motors, lighting and sockets. In a month it uses 42,000 kWh. Its meter records a maximum demand of 150 kVA and an average power factor of 0.78 lagging.

At that power factor the real power at the peak is only 117 kW. The rest of the 150 kVA is reactive power for the magnetic fields of the motors, which travels from the supplier’s network through the transformer and the main cable to the motors and back, in every cycle. The site pays a demand charge on all 150 kVA, and its supplier adds a surcharge because the average power factor is below 0.90.

A capacitor bank at the main board can supply most of that reactive power locally. The motors still receive it, but it no longer comes through the meter and the transformer. The questions are how many kvar to fit, in what form, and what the bill will be afterwards.

LightingsocketsMotorskW + kvarCapacitorbankTransformer D200 kVA11 kVcarries the kW andonlythekvarthatthebankdoesnotgive415 V main boardkvar
Site E with a capacitor bank at the main board

Fundamental Theory: Supplying reactive power where it is used



This lesson uses the quantities of the power triangle: real power in kW, reactive power in kvar, apparent power in kVA, with and power factor . The angle is the angle by which the current lags the voltage.

Where a low power factor comes from

An induction motor needs a rotating magnetic field before it can deliver any torque. The current that makes the field is called the magnetising current. It lags the voltage by almost , so it is almost pure reactive power, and it depends on the voltage, not on the load at the shaft.

When the load on the shaft falls, the real power falls with it, but the magnetising kvar stays almost the same. The triangle becomes short and tall, and the power factor falls.

Load on a typical 4-pole motorTypical power factor
Full loadabout 0.84
Half loadabout 0.70
Quarter loadabout 0.50
No load0.2 or lower

These are typical values, not data for one machine. The maker’s data sheet gives the real curve. The conclusion is general: a site full of oversized or lightly loaded motors has a low power factor. Lightly loaded transformers, welding sets and old lighting ballasts with iron cores add to the same effect.

What a capacitor does

A capacitor takes a current that leads the voltage by , opposite to the reactive current of an inductive load, which lags by . In the quarter cycle in which the motor field takes energy the capacitor gives it, and in the next quarter cycle the motor field returns it.

With a capacitor beside the motor, the energy is exchanged between the two of them. The supply sends only the real power and the part of the reactive power that the capacitor does not cover. For the motor nothing changes: its voltage, current, field and torque are the same.

In the notation of this course a lagging load has positive and a capacitor has negative . A capacitor of rating therefore reduces the reactive power seen by the supply from to , and leaves unchanged.

S beforeQcfromthe(kVA)capacitorQ afterS after(kvar)(kVA)P (kW), not changed
The power triangle before and after correction

Sizing the capacitor

Before correction the load has power factor , so . The target is , so the supply should see . The capacitor must provide the difference.

Capacitor rating for a target power factor

is the real power in kW and is in kvar. The real power is the same before and after.

The line current falls in the same ratio as the kVA:

Why the target is not 1.00

Each step towards unity power factor costs more kvar and releases less kVA. For site E at its peak of 117 kW, the script at the end of this lesson gives these values.

Power factorCapacitor (kvar)Demand (kVA)kVA released
0.78 (now)0150.00
0.9037.2130.020.0
0.9555.4123.226.8
1.0093.9117.033.0

The first 37.2 kvar release 20.0 kVA. The last 38.5 kvar, from 0.95 to 1.00, release only 6.2 kVA. A target of 1.00 also leaves no margin against a leading power factor. Most sites therefore aim for 0.95 to 0.98, above the level at which the supplier’s penalty begins.

Where to place the capacitors

A capacitor relieves only the equipment between itself and the supply. Everything between the capacitor and the motor still carries the full motor current.

At themotorGroupbankCentralbankSupplyMain boardSub-boardMotor●relieves: transformerandthemainand theand supplyfeedermotor feeder
Three places for the capacitors
  • A central bank at the main board corrects the whole site. It reduces the kVA at the meter and unloads the transformer, but not the cables inside the site. This is the usual choice when the aim is the bill.
  • A group bank at a sub-board also relieves the feeder from the main board. It suits one heavy workshop at the end of a long cable.
  • A capacitor at one motor is switched with the motor, so it is never connected when the motor is off, and it relieves the motor feeder as well. It suits a large motor that runs for many hours. It is not suitable for every starter, and a capacitor must never be connected between a variable speed drive and its motor. Its size is limited: when the motor is switched off it keeps turning for a while, and a capacitor larger than the motor’s own magnetising kvar at no load can keep its field alive, so that the motor acts as a generator and its voltage rises well above the supply. Makers therefore limit a capacitor at the motor to about 90 percent of the no-load magnetising kvar, with the no-load current, and give a table of the largest size for each motor.

Switched steps

The reactive power of a site changes through the day as motors start and stop. A fixed capacitor that is correct at the peak is too large at night. For this reason a central bank is built from several steps, each with its own contactor and fuses, and a controller that measures the reactive power at the incomer and connects only the steps that are needed. Steps of 12.5 kvar and 25 kvar are common sizes at this voltage.

The delay matters. A capacitor that has just been disconnected still holds charge, and the controller must wait until it has discharged before it connects that step again. The delay also prevents switching on every short change of load, which would wear the contactors.

What correction saves, and what it does not

Correction reduces the current between the capacitors and the supply. From that one fact come all its benefits:

  • a lower maximum demand in kVA, where the tariff charges for kVA,
  • no power factor surcharge, where the tariff has one,
  • spare capacity in the transformer and the main cable, which can delay the cost of larger equipment,
  • slightly lower heating losses and voltage drop in the cables and transformer upstream of the capacitors.

It does not do these things:

  • It does not reduce the kWh that the loads themselves use. A motor does the same work with the same real power, and its own current, efficiency and temperature are unchanged.
  • It saves nothing on a tariff that charges only for kWh, apart from the small reduction in cable losses. Most homes are billed this way, so a device sold to a household as a power factor “energy saver” cannot give the saving it promises.
  • It does not correct the distortion caused by drives and other electronic loads.

Over-correction

When more capacitance is connected than the load needs, the net reactive power becomes negative and the power factor becomes leading.

A leading load still draws current for its excess kvar, so the kVA and the cable loading rise again. Take site E on a quiet night with 30 kW of load at 0.78 and suppose a fixed bank of 62.5 kvar stays connected. The load needs 24.1 kvar. The supply now sees 38.4 kvar leading, a power factor of 0.615 leading, and 67.8 A in the main cable. Without any bank the current would be 53.5 A.

A capacitor also raises the voltage at its terminals, because its leading current flows through the inductance of the transformer. For a bank of at a board where the short-circuit level is , the rise is approximately

where is the transformer rating and is its impedance per unit. The second relation counts the transformer only and ignores the network behind it. For the 200 kVA, 4.5 percent transformer, , and 62.5 kvar raise the voltage by about 1.4 percent, or 5.8 V. This rise is small, but it adds to a supply voltage that is often already high at night.

Over-correction is more serious on a standby generator, which can absorb only a limited amount of leading kvar before its voltage regulator loses control. Many sites disconnect the bank when the generator runs. The limit comes from the generator maker.

Resonance with harmonics

A capacitor bank and the inductance of the transformer form a circuit with a natural frequency, and that frequency can lie close to one of the harmonic frequencies that drives and other electronic loads inject. A common estimate of the resonant order is . For site E with all 62.5 kvar connected this gives about 8.4, and with 37.5 kvar connected it gives about 10.9, which is very close to the 11th harmonic that a six-pulse drive produces. At resonance a small harmonic current from the drive is amplified into a large current that circulates between the bank and the transformer. The usual results are overheated capacitors, blown fuses and distorted voltage. The estimate is rough, because it ignores the supplier’s network and the other loads. When a site has a significant share of drives or other electronic loads, have the harmonics measured before a bank is chosen, and expect the supplier of the bank to propose a detuned bank, in which a series reactor on each step moves the resonance below the fifth harmonic.

Application 1: A capacitor bank for site E



Step 1: Real and reactive power at the maximum demand

Click to reveal the starting triangle
  1. Real power.

    This value does not change when capacitors are added. ✅

  2. Reactive power. and .

    The supply provides 93.87 kvar at the peak. ✅

  3. Line current.

    Each line of the main cable carries 208.7 A. ✅

Step 2: The capacitor rating

Click to reveal the kvar required
  1. Target angle. and . ✅

  2. Reactive power that may remain.

    At 0.95 the supply still provides 38.46 kvar. ✅

  3. Capacitor rating.

    The bank must give 55.41 kvar at the peak. ✅

Step 3: New kVA, current and transformer loading

Click to reveal what the correction releases
  1. New apparent power.

    The maximum demand falls from 150 kVA to 123.2 kVA. ✅

  2. New line current.

    The current falls by 37.3 A (from the unrounded values), which is 17.9 percent. ✅

  3. Released transformer capacity.

    The transformer loading falls from 75.0 percent to 61.6 percent, and its spare capacity rises from 50.0 kVA to 76.8 kVA. ✅

  4. Check by the triangle. The reactive power after correction is , so

    This second route gives the same kVA as item 1. ✅

Step 4: A standard bank made of steps

Click to reveal the choice of bank
  1. Number of steps. , so four steps are not enough. Five steps give . ✅

  2. Four steps at the peak. , and the power factor is 0.936. The target is not reached. ✅

  3. Five steps at the peak. , and the power factor is 0.966. The target is reached and the load is still lagging. ✅

  4. Choice. An automatic bank of 62.5 kvar in five steps of 12.5 kvar. ✅

Step 5: The same bank at an ordinary moment

Click to reveal why the bank needs steps
  1. Load at this moment. Add kW and kvar separately.

    So , the power factor is 0.854 and the line current is 117.7 A. ✅

  2. kvar needed for 0.95.

    The peak needed 55.41 kvar. ✅

  3. Steps connected. One step leaves 31.55 kvar and a power factor of 0.916. Two steps leave 19.05 kvar and give 0.967, with 74.67 kVA and 103.9 A. The controller connects two steps. ✅

  4. All five steps at this moment. The net reactive power would be , which is leading. A fixed bank sized for the peak would over-correct for most of the day. ✅

  5. Check with the script. The Python script prints 55.41 kvar, 123.16 kVA and 171.3 A for the peak, a power factor of 0.966 with five steps, and 0.967 with two steps at the ordinary moment. ✅

Application 2: The money, with an example tariff



Step 1: The bill before correction

Click to reveal the first bill
  1. Energy charge.

    This line depends only on the kWh. ✅

  2. Demand charge.

    This line depends on the highest kVA of the month. ✅

  3. Bill before the surcharge. currency units. ✅

  4. Surcharge rate. The power factor is below the limit, which is 12 steps of 0.01. The rate is percent. ✅

  5. Surcharge and total.

    The site pays 773,760 currency units for the month. ✅

Step 2: The bill after correction

Click to reveal the second bill
  1. Energy charge. The kWh are the same, so the charge is still 504,000 currency units. ✅

  2. Demand charge.

    The demand charge falls by 21,440 currency units. ✅

  3. Surcharge. The average power factor of 0.95 is above 0.90, so the surcharge is zero. ✅

  4. Total.

    The site pays 602,560 currency units for the month. ✅

Step 3: The saving and where it comes from

Click to reveal the saving
  1. Monthly saving.

    This is 22.1 percent of the first bill. ✅

  2. Split. The surcharge gives 149,760 of the saving and the demand charge gives 21,440. The energy charge gives nothing. ✅

  3. Stopping at 0.90. A smaller bank that only reaches the limit of 0.90 needs 37.2 kvar and gives a demand of 130.0 kVA. The bill is then currency units and the saving is 165,760. Going on to 0.95 adds only 5,440 currency units a month, but it keeps a margin above the limit. ✅

  4. Check with the script. The script builds both bills from the tariff rule and prints totals of 773,760 and 602,560 currency units and a saving of 171,200. ✅

Verify It in Python



The script sizes the bank at the maximum demand, lists the power factor for each number of steps at the peak and at the ordinary moment, tests a light load with the whole bank connected, and builds both bills from the tariff rule. The plot shows the two power triangles and the two bills.

capacitor_bank_and_bill.py
"""Power factor correction of site E: the capacitor bank, the current, and the bill."""
import numpy as np
import matplotlib.pyplot as plt
V_L = 415.0 # line voltage, V
ROOT3 = np.sqrt(3.0)
S_TX, Z_TX = 200.0, 0.045 # transformer D: kVA and impedance (per unit)
CU_LOSS = 2.8 # transformer D full-load copper loss, kW
S1, PF1, PF2 = 150.0, 0.78, 0.95 # month's maximum demand, kVA, before / target
ENERGY = 42000.0 # kWh in the month
RATE_KWH, RATE_KVA = 12.00, 800.0 # tariff G, currency units
PF_LIMIT, SURCHARGE_STEP = 0.90, 0.02 # 2 % of the bill for each 0.01 below 0.90
STEP = 12.5 # kvar in one switched step
def amps(s_kva):
return s_kva * 1000.0 / (ROOT3 * V_L)
def bill(demand_kva, pf_avg):
"""Return energy charge, demand charge, surcharge and total."""
energy = ENERGY * RATE_KWH
demand = demand_kva * RATE_KVA
points = max(0, int(round((PF_LIMIT - pf_avg) * 100.0)))
surcharge = SURCHARGE_STEP * points * (energy + demand)
return energy, demand, surcharge, energy + demand + surcharge
# ---------- Part 1: size the bank ----------
P = S1 * PF1
t1, t2 = np.tan(np.arccos(PF1)), np.tan(np.arccos(PF2))
Q1 = P * t1
QC = P * (t1 - t2)
S2 = P / PF2
print("Sizing at the month's maximum demand")
print(f" P = {P:.1f} kW, tan(phi1) = {t1:.4f}, tan(phi2) = {t2:.4f}")
print(f" Q before = {Q1:.2f} kvar, Q after = {P * t2:.2f} kvar")
print(f" capacitor needed Qc = {QC:.2f} kvar")
print(f" S: {S1:.1f} -> {S2:.2f} kVA (released {S1 - S2:.2f} kVA)")
print(f" line current: {amps(S1):.1f} -> {amps(S2):.1f} A "
f"(fall {amps(S1) - amps(S2):.1f} A, {100.0 * (1.0 - S2 / S1):.1f} %)")
print(f" transformer D loading: {100.0 * S1 / S_TX:.1f} -> {100.0 * S2 / S_TX:.1f} %, "
f"spare {S_TX - S1:.1f} -> {S_TX - S2:.1f} kVA")
cu1, cu2 = CU_LOSS * (S1 / S_TX) ** 2, CU_LOSS * (S2 / S_TX) ** 2
print(f" transformer copper loss at the peak: {cu1:.2f} -> {cu2:.2f} kW")
print(f" Qc for the limit of {PF_LIMIT:.2f} only: "
f"{P * (t1 - np.tan(np.arccos(PF_LIMIT))):.2f} kvar, S = {P / PF_LIMIT:.1f} kVA")
# ---------- Part 2: a bank made of steps ----------
print(f"Bank made of {STEP} kvar steps, at the peak")
steps = np.arange(0, 7)
s_steps = np.hypot(P, Q1 - steps * STEP)
for n in steps:
q_net = Q1 - n * STEP
print(f" {n} steps = {n * STEP:5.1f} kvar: Q {q_net:6.2f} kvar, "
f"S {s_steps[n]:6.2f} kVA, pf {P / s_steps[n]:.3f}")
n_need = int(np.ceil(QC / STEP))
BANK = n_need * STEP
print(f" smallest bank that reaches {PF2:.2f}: {n_need} steps = {BANK:.1f} kvar")
# ---------- Part 3: one ordinary moment (three loads running) ----------
loads = [(24.2, 0.84), (18.0, 0.95), (30.0, 0.80)] # kW input, power factor
p_m = sum(p for p, _ in loads)
q_m = sum(p * np.tan(np.arccos(pf)) for p, pf in loads)
print("One moment: motor A, lighting and sockets, three smaller motors")
print(f" P = {p_m:.1f} kW, Q = {q_m:.2f} kvar, S = {np.hypot(p_m, q_m):.2f} kVA, "
f"pf {p_m / np.hypot(p_m, q_m):.3f}, {amps(np.hypot(p_m, q_m)):.1f} A")
print(f" kvar needed for {PF2:.2f}: {q_m - p_m * t2:.2f}")
for n in range(0, 4):
q_net = q_m - n * STEP
s_net = np.hypot(p_m, q_net)
print(f" {n} steps: Q {q_net:6.2f} kvar, S {s_net:5.2f} kVA, "
f"pf {p_m / s_net:.3f}, {amps(s_net):.1f} A")
# ---------- Part 4: light load with the whole bank left on ----------
P_LIGHT = 30.0
q_light = P_LIGHT * t1 - BANK
s_light = np.hypot(P_LIGHT, q_light)
s_fault = S_TX / Z_TX
print("Light load of 30 kW at 0.78 with the whole bank connected")
print(f" net Q = {q_light:.2f} kvar (negative means leading), "
f"S = {s_light:.2f} kVA, pf = {P_LIGHT / s_light:.3f} leading")
print(f" current {amps(s_light):.1f} A against {amps(P_LIGHT / PF1):.1f} A "
f"with no bank")
print(f" short-circuit level at the board about {s_fault:.0f} kVA")
print(f" voltage rise from {BANK:.1f} kvar: about {100.0 * BANK / s_fault:.2f} % "
f"= {V_L * BANK / s_fault:.1f} V")
print(" resonance order with n steps connected:")
print(" " + ", ".join(f"{n}: {np.sqrt(s_fault / (n * STEP)):.1f}"
for n in range(1, n_need + 1)))
# ---------- Part 5: the bill ----------
S2_BILL = round(S2, 1)
before = bill(S1, PF1)
after = bill(S2_BILL, PF2)
print("Monthly bill with tariff G (currency units)")
for label, b in (("before", before), ("after", after)):
print(f" {label:>6}: energy {b[0]:,.0f} demand {b[1]:,.0f} "
f"surcharge {b[2]:,.0f} total {b[3]:,.0f}")
print(f" saving: demand {before[1] - after[1]:,.0f} + surcharge "
f"{before[2] - after[2]:,.0f} = {before[3] - after[3]:,.0f} per month "
f"({100.0 * (1.0 - after[3] / before[3]):.1f} % of the bill)")
at_limit = bill(round(P / PF_LIMIT, 1), PF_LIMIT)
print(f" at {PF_LIMIT:.2f} only: total {at_limit[3]:,.0f}, "
f"saving {before[3] - at_limit[3]:,.0f}")
real_peak = bill(round(float(s_steps[n_need]), 1), PF2)
print(f" with all {n_need} steps in at the peak ({s_steps[n_need]:.1f} kVA): "
f"total {real_peak[3]:,.0f}")
print(f" energy charge is the same in every case: {before[0]:,.0f}")
# ---------- Plot ----------
fig, ax = plt.subplots(1, 2, figsize=(10, 4.5))
ax[0].plot([0, P], [0, 0], "k-")
ax[0].plot([P, P], [0, Q1], "k-")
ax[0].plot([0, P], [0, Q1], label=f"before: {S1:.0f} kVA, pf {PF1:.2f}")
ax[0].plot([0, P], [0, P * t2], label=f"after: {S2:.1f} kVA, pf {PF2:.2f}")
ax[0].annotate("", xy=(P, P * t2), xytext=(P, Q1),
arrowprops=dict(arrowstyle="->", color="tab:red"))
ax[0].text(P - 34.0, (Q1 + P * t2) / 2.0, f"Qc = {QC:.1f} kvar")
ax[0].set_xlabel("P (kW)")
ax[0].set_ylabel("Q (kvar)")
ax[0].set_title("Power triangle at the maximum demand")
ax[0].set_aspect("equal")
ax[0].legend(loc="upper left")
names = ("energy", "demand", "surcharge")
bottom = np.zeros(2)
for k, name in enumerate(names):
vals = np.array([before[k], after[k]]) / 1000.0
ax[1].bar(["before", "after"], vals, bottom=bottom, label=name)
bottom += vals
ax[1].set_ylabel("thousand currency units per month")
ax[1].set_title("The bill with tariff G")
ax[1].legend()
fig.tight_layout()
fig.savefig("capacitor_bank_and_bill.png", dpi=120)
print("Saved capacitor_bank_and_bill.png")

Expected output

Sizing at the month's maximum demand
P = 117.0 kW, tan(phi1) = 0.8023, tan(phi2) = 0.3287
Q before = 93.87 kvar, Q after = 38.46 kvar
capacitor needed Qc = 55.41 kvar
S: 150.0 -> 123.16 kVA (released 26.84 kVA)
line current: 208.7 -> 171.3 A (fall 37.3 A, 17.9 %)
transformer D loading: 75.0 -> 61.6 %, spare 50.0 -> 76.8 kVA
transformer copper loss at the peak: 1.57 -> 1.06 kW
Qc for the limit of 0.90 only: 37.20 kvar, S = 130.0 kVA
Bank made of 12.5 kvar steps, at the peak
0 steps = 0.0 kvar: Q 93.87 kvar, S 150.00 kVA, pf 0.780
1 steps = 12.5 kvar: Q 81.37 kvar, S 142.51 kVA, pf 0.821
2 steps = 25.0 kvar: Q 68.87 kvar, S 135.76 kVA, pf 0.862
3 steps = 37.5 kvar: Q 56.37 kvar, S 129.87 kVA, pf 0.901
4 steps = 50.0 kvar: Q 43.87 kvar, S 124.95 kVA, pf 0.936
5 steps = 62.5 kvar: Q 31.37 kvar, S 121.13 kVA, pf 0.966
6 steps = 75.0 kvar: Q 18.87 kvar, S 118.51 kVA, pf 0.987
smallest bank that reaches 0.95: 5 steps = 62.5 kvar
One moment: motor A, lighting and sockets, three smaller motors
P = 72.2 kW, Q = 44.05 kvar, S = 84.58 kVA, pf 0.854, 117.7 A
kvar needed for 0.95: 20.32
0 steps: Q 44.05 kvar, S 84.58 kVA, pf 0.854, 117.7 A
1 steps: Q 31.55 kvar, S 78.79 kVA, pf 0.916, 109.6 A
2 steps: Q 19.05 kvar, S 74.67 kVA, pf 0.967, 103.9 A
3 steps: Q 6.55 kvar, S 72.50 kVA, pf 0.996, 100.9 A
Light load of 30 kW at 0.78 with the whole bank connected
net Q = -38.43 kvar (negative means leading), S = 48.75 kVA, pf = 0.615 leading
current 67.8 A against 53.5 A with no bank
short-circuit level at the board about 4444 kVA
voltage rise from 62.5 kvar: about 1.41 % = 5.8 V
resonance order with n steps connected:
1: 18.9, 2: 13.3, 3: 10.9, 4: 9.4, 5: 8.4
Monthly bill with tariff G (currency units)
before: energy 504,000 demand 120,000 surcharge 149,760 total 773,760
after: energy 504,000 demand 98,560 surcharge 0 total 602,560
saving: demand 21,440 + surcharge 149,760 = 171,200 per month (22.1 % of the bill)
at 0.90 only: total 608,000, saving 165,760
with all 5 steps in at the peak (121.1 kVA): total 600,880
energy charge is the same in every case: 504,000
Saved capacitor_bank_and_bill.png

The resonance line lists the estimated resonant order for one to five steps connected. It shows why the problem can appear at one step and not at another.

Common Mistakes



  • Starting the sizing formula from kVA. The formula uses the real power in kW, so convert first with .
  • Expecting the kWh to fall. Correction changes the demand charge and the surcharge. The energy used by the loads is the same.
  • Fitting one fixed capacitor sized for the peak. At light load it over-corrects, the power factor becomes leading and the voltage rises. Use switched steps, or a capacitor that is switched with its motor.
  • Adding a plain capacitor bank to a site with many drives without a harmonic measurement. The bank may resonate with the transformer at a harmonic frequency.

Summary



  • A low power factor on an industrial site comes mainly from induction motors that run lightly loaded: their magnetising kvar stays almost constant while their kW falls.
  • A capacitor supplies reactive power locally. The rating for a target is , with unchanged.
  • For site E at its maximum demand of 150 kVA and 0.78, a correction to 0.95 needs 55.41 kvar. The demand falls to 123.2 kVA, the line current falls from 208.7 A to 171.3 A, and 26.8 kVA of the 200 kVA transformer is released. A standard automatic bank of five 12.5 kvar steps does this.
  • On the example tariff the monthly bill falls from 773,760 to 602,560 currency units. The saving is in the demand charge and the surcharge. The energy charge does not change.
  • Too much capacitance at light load gives a leading power factor and a voltage rise, which switched steps prevent. A bank on a site with drives can resonate with the transformer, so the harmonics are measured first.

Exercises



1. A site has a maximum demand of 90 kVA at a power factor of 0.82 lagging on a 415 V supply. Find the capacitor rating for a target of 0.92, the new kVA, and the line current before and after.

Answer

. . . The current falls from to .

2. The site of Exercise 1 uses 20,000 kWh in the month and is billed on the example tariff of this lesson, with an average power factor of 0.82 before correction and 0.92 after. Find the bill before and after, and the monthly saving.

Answer

Before: energy , demand , sum 312,000. The power factor is 8 steps below 0.90, so the surcharge is 16 percent, or 49,920. The total is 361,920 currency units. After: currency units, with no surcharge. The saving is 57,760 currency units a month.

3. A capacitor is fitted at compressor motor A (415 V, 40.0 A at full load, power factor 0.84) to raise the power factor of its feeder to 0.95. The feeder is 85 m long with a typical resistance of 1.15 mΩ per metre in each conductor. Find the capacitor rating, the new feeder current, and the fall in feeder heating loss. If the motor runs at full load for 14 hours a day and 30 days a month, how many kWh does this save in a month?

Answer

and . The current becomes . The resistance of each conductor is . The loss falls from 469 W to 367 W, a saving of 102 W. Over hours this is 43 kWh, worth about 516 currency units at 12.00 per kWh. The energy saving from correction is real and small.

4. At night a site runs 20 kW at a power factor of 0.75 lagging. A fixed capacitor of 37.5 kvar stays connected. Find the net reactive power, the power factor and the line current at 415 V, and compare the current with the value without the capacitor. The short-circuit level at the board is 4444 kVA. Estimate the voltage rise from the capacitor.

Answer

The load needs . The net value is , which is leading. , the power factor is 0.710 leading and the current is 39.2 A. Without the capacitor it would be and 37.1 A, so the capacitor has made the current higher. The voltage rise is about percent.

References



  • J. D. Glover, T. J. Overbye and M. S. Sarma, Power System Analysis and Design, 6th edition, Cengage Learning, 2017.
  • S. J. Chapman, Electric Machinery Fundamentals, 5th edition, McGraw-Hill, 2012.
  • A. Hughes and B. Drury, Electric Motors and Drives: Fundamentals, Types and Applications, 5th edition, Newnes, 2019.
  • R. C. Dugan, M. F. McGranaghan, S. Santoso and H. W. Beaty, Electrical Power Systems Quality, 3rd edition, McGraw-Hill, 2012.


© 2021-2026 SiliconWit®. All rights reserved.
Predict first

A site with a power factor of 0.78 fits a capacitor bank at its main board and reaches 0.95. The machines do the same work as before. What happens to the kWh that the motors use in a month?

See it: the capacitor pulls the triangle down
The month's bill, currency units
No bank
With this bank
Energy charge, 42,000 kWh504,000
Demand charge
Power factor surcharge
Total
Saving against no bank

Power factor
Apparent power
Line current at 415 V
kvar from the supply
kVA released
Load on the 200 kVA transformer

The triangle is drawn to scale for site E at its maximum demand. The base is the real power, 117 kW, and no capacitor changes it. The slider adds steps of 12.5 kvar. Each step shortens the upright side, and the sloping side (the kVA that the supply, the transformer and the main cable carry) becomes shorter with it. Past 93.9 kvar the upright side points down: the power factor is leading and the kVA rise again. Ten steps load the supply as much as five steps do. Which case the numbers show: with no bank the bill is the lesson's 773,760. The button for exactly 0.95 gives the lesson's 123.2 kVA, 171.3 A, 26.8 kVA released and its bill of 602,560. The lesson's real bank of five steps gives 121.1 kVA and 600,880, as its closing note states. The bill here takes the month's average power factor as the power factor at the peak, rounded to 0.01, and it applies the surcharge rule to a leading power factor in the same way. Suppliers differ on both points. The energy charge is the same in every position.

11 kV Transformer D, 200 kVA carries the kW and only the kvar that the bank does not give 415 V main board M 3~ kvar Motors kW + kvar Lighting sockets Capacitor bank
The capacitor bank supplies kvar at the main board
Qc = 55.4 kvar from the capacitor Q after 38.5 kvar Q before 93.9 kvar S before 150 kVA, pf 0.78 S after 123.2 kVA, pf 0.95 P = 117 kW, not changed
A capacitor shortens the kvar side; P stays the same
Supply Main board Sub-board Motor Central bank Group bank At the motor relieves: the transformer and the supply and the main feeder and the motor feeder Each place relieves everything between itself and the supply.
Three places for the capacitors

Check yourself

Three questions. Each wrong choice is a mistake people really make, so read the note after you answer.

1. A workshop takes 80 kW at a power factor of 0.70 lagging. What capacitor rating brings it to 0.95?

2. At night the site takes 30 kW at 0.78 lagging. A fixed bank of 62.5 kvar, sized for the peak, stays connected. How does the current in the main cable compare with the current with no bank?

3. The site is at 0.95 with 55.4 kvar. The owner asks for a power factor of exactly 1.00. What does the extra capacitance buy at the peak of 117 kW?

beforeafter supplysupply motormotor kWkvarkW onlykvar stays local
Watch it build: too much capacitor at night
30 kW night: 30 kW at 0.78 needs 24.1 kvar lagging 38.5 kVA, 53.5 A bank 62.5 kvar left on net 38.4 kvar leading pf 0.615 leading, 67.8 A 53.5 A without any bank ΔV ≈ 62.5 ÷ 4,444 kVA ≈ 1.4%, +5.8 V
  1. A quiet night: 30 kW at 0.78 needs 24.1 kvar. The main cable carries 53.5 A.
  2. A fixed 62.5 kvar bank stays on: 38.4 kvar leading, pf 0.615, and the current rises to 67.8 A.
  3. The leading current also raises the voltage: 62.5 ÷ 4,444 kVA = 1.4%, about 5.8 V on 415 V.
Found this useful?