A site pays for 42,000 kWh every month and nobody can say where it goes. An audit report arrives with a list of motors, each nameplate multiplied by its hours, and the list adds up to more energy than the meter recorded. From that moment the manager cannot trust any saving the report promises, because a saving cannot be larger than the load it comes from. This lesson shows how to divide a bill among the loads that caused it, how to label each figure as measured, logged or estimated, and how to say how wrong the total may be. It then shows how to choose what to log, and for how long, before a project starts. #EnergyAudit #DataLogging #EndUseBreakdown

Learning Objectives

By the end of this lesson, you will be able to:

  1. Describe the three levels of energy audit and what each one can support
  2. Build an end-use breakdown that is reconciled with the utility bill, with the unexplained remainder stated
  3. Estimate the energy of a motor from its nameplate, load factor and run hours, and explain why nameplate power times hours overstates it
  4. Combine the uncertainties of several estimates by root sum of squares and name the weakest one
  5. Choose between a spot measurement and logging, and set the logging interval and duration for a given load

Real-World System Problem: A bill of 42,000 kWh and six suspects



A small factory with a store building, a compressed air system and its own borehole receives one electricity bill a month: 42,000 kWh. There is one utility meter and no other meter on the site. Suppliers have offered a drive for a pump, new lighting for the store and a new air compressor, each with a saving stated as a percentage of “the load”.

The budget for measurement is limited: loggers are hired by the week, and an electrician’s time costs money. The loggers should go where the energy is large and the knowledge is poor. To find those places the manager needs a first table of where the 42,000 kWh goes, with an honest mark against every figure.

The utility meter is the one trusted number. Everything downstream must add up to it, or the difference must be named.

MeterMain boardutilitysupply42,000 kWhAirThreeBore-Light-OfficeBase?comp-motors holeingandloadnotressorpumpsocketsfound
One meter, six groups of load, one remainder

Fundamental Theory: An energy balance with honest labels



What an audit is

An energy audit answers three questions: how much energy the site uses, where it goes, and what could be changed. Its main product is the energy balance. The list of opportunities follows from that.

Audits are commonly described at three levels of depth. ASHRAE describes audit levels of this kind, and ISO 50002 is an international standard for energy audits. If a contract names one of those documents, its current edition decides.

LevelWhat is doneWhat it can support
Walk-throughBills are read, the site is walked, nameplates and obvious waste are notedA list of places to look, and low-cost repairs
General audit with measurementsAn end-use breakdown is built, the main loads are measured or logged, savings and costs are estimatedA choice of projects to study
Investment-grade auditThe chosen projects are logged over a full cycle, a baseline is prepared, costs are quoted, uncertainty is statedA decision to invest, and the plan to verify the saving

The levels differ in how much is measured and how much is estimated.

The energy balance

Energy that enters through the meter is used by some load, so the end uses must add up to the metered energy:

is the energy assigned to load in the period, and is the remainder that the audit has not explained. The remainder is a result of the audit and must be printed. An audit with no remainder has usually adjusted its estimates until the sum agreed, which hides the error.

A remainder of a few percent is normal: small unlisted loads, cable and transformer losses, and the errors of every estimate. A negative remainder, where the loads exceed the bill, means at least one estimate is too high, usually from nameplate power.

Check the bill before you trust it as the total. Its reading dates rarely match a calendar month (a bill of 33 days holds 10 percent more energy than one of 30), and a reading marked as estimated, often with an “E”, is the utility’s guess, not the meter. Read the utility meter yourself on the first and last day of the audit period, and build the balance on those dates.

Significant users

On most sites a few loads use most of the energy. Rank the loads by energy, largest first. Those at the top are the significant users, and they receive the measuring effort.

Rank by energy, not by power. A 37 kW machine that runs one hour a day uses less than a 3 kW fan that never stops.

From a nameplate to energy

The nameplate of a motor states its rated output: the mechanical power at the shaft at full load. Three corrections stand between that figure and the energy on the bill.

Energy of a motor from its nameplate

is the rated shaft power in kW, is the motor efficiency, is the load factor (the real shaft power divided by the rated shaft power) and is the running time in hours.

Dividing by the efficiency raises the figure a little. The load factor lowers it a great deal: designers choose the next larger standard motor, and the driven machine seldom works at its design point, so load factors between 0.5 and 0.8 are common. The running time is the third correction: many loads cycle, so a plant that works 16 hours does not run each motor for 16 hours. It is like multiplying a car’s top speed by the hours it is driven: the car is seldom at its top speed.

Spot measurement

A spot measurement is one reading, taken at one moment. For a balanced three-phase load (the same current in each phase) the active power is

is the line voltage in volts, is the line current in amperes and is the power factor. is in watts.

A clamp meter that reads only current is not enough. The power factor of a motor falls with its load, so a lightly loaded motor draws a current that looks large and a power that is small. Use a power meter that reads voltage, current and power factor together, on all three phases: on unbalanced loads, and on loads with drives whose current is not a clean sine wave, the formula is only approximate, and the meter’s own kW reading is the figure to use.

A spot measurement suits a steady load: lighting, a fan at fixed speed, a pump against a fixed head. Multiply the reading by the run hours. For such a load the weak figure is the hours, not the power.

Logging

A logger stores a reading at a fixed interval. Logging is needed when the power changes with time, as it does on almost every production load.

kW24ABC80timeA reads 24 kW,B reads 8 kW,C reads 24 kWthe true average is between them
Three spot readings of a load that cycles

No single reading is the average. Only the whole record gives the energy.

Two settings must be chosen. The interval must be short against the changes you need to see: to find energy, a meter that stores kWh every 15 minutes is enough, because it misses nothing between readings; to see how a machine cycles, or to relate power to flow, use one minute or less. The duration follows one rule.

How long to log

Log for at least one full cycle of whatever drives the load.

  • A machine that cycles through a batch or a shift: at least one day.
  • A load that follows the working pattern of the site: at least one week, so that the weekend is included.
  • A load that follows the weather: a season, or the whole range of weather the claim will cover.

A compressor draws 24.2 kW while it runs. It runs 16 hours on each of five working days, 12 hours on Saturday and 6 hours on Sunday. The weekly mean is hours a day, which gives kWh in a 30 day month. A logger fitted for Monday only would report 16 hours a day and 11,616 kWh, which is 14 percent too high. One fitted for Sunday only would report 4,356 kWh.

The uncertainty an estimate carries

Every figure in a breakdown has an uncertainty, and the reader needs to see it. Write each as a standard uncertainty , in kWh or as a percentage. A logged week on a calibrated meter may deserve 3 percent. A nameplate estimate with a guessed load factor may deserve 25 percent or more.

When the estimates are independent of each other, their uncertainties combine by root sum of squares:

Each must be in kWh before it is squared. The expanded uncertainty covers about 95 percent of cases.

Because the terms are squared, the largest dominates: one poor estimate of a large load can supply most of the uncertainty of the whole table, and that is where the next logger belongs.

Application 1: Where 42,000 kWh a month goes



Step 1: Energy of each load

Click to reveal the six calculations
  1. Air compressor. The hours are .

    This comes from a logged week. ✅

  2. Three process motors. The input at full load is kW. With the load factor it is kW. The hours are .

    Nothing in this estimate was measured. ✅

  3. Borehole pump. The hours are .

    One spot reading, with hours from a counter. ✅

  4. Lighting. The store has W, which is 8.64 kW.

    The power is counted. The hours are estimated. ✅

  5. Office and sockets. The hours are .

    An estimate with no measurement. ✅

  6. Base load. A month of 30 days has 720 hours.

    One night reading. The cold room’s compressor cycles, so one reading may catch it running or stopped; a night of logging is the safer figure. ✅

Step 2: Reconcile with the bill and rank

Click to reveal the breakdown table
  1. Sum the six loads.

    The audit has explained 39,278 kWh. ✅

  2. Remainder.

    The remainder is positive and it is printed in the table. ✅

  3. Shares and rank. Divide each energy by 42,000 and sort.

    RankLoadkWhShareHow the figure was obtainedu
    1Three process motors11,11626.5 %Nameplate estimate, load factor assumed25 %
    2Air compressor10,16424.2 %Logged for 7 days3 %
    3Base load6,04814.4 %Measured once, at night10 %
    4Lighting5,18412.3 %Fittings counted, hours estimated15 %
    5Borehole pump5,07612.1 %Spot power, hours from a counter8 %
    6Office and sockets1,6904.0 %Estimate30 %
    Unexplained remainder2,7226.5 %Bill minus the six loads
    Utility bill42,000100 %Utility meter

    The first two loads are half of the bill. ✅

Step 3: Uncertainty of the total and the weakest estimate

Click to reveal the uncertainty
  1. Convert each percentage to kWh. Multiply each energy by its percentage. In the order of the table the results are 2,779, 305, 605, 778, 406 and 507 kWh. Percentages cannot be combined directly. Values in kWh can. ✅

  2. Combine by root sum of squares.

    This is 7.7 percent of the explained 39,278 kWh. The expanded uncertainty is kWh. ✅

  3. Weakest estimate. The three process motors supply percent of the variance, so theirs is the weakest estimate. The office estimate has a larger percentage (30 percent) but it is a small load and matters little. ✅

  4. Is the ranking decided? The three process motors are first at 11,116 kWh, but one standard uncertainty spans 8,337 to 13,895 kWh, and the compressor at 10,164 kWh is inside that span. The audit cannot yet say which of the two is the largest user. ✅

  5. Is the remainder a missing load? The remainder of 2,722 kWh is smaller than the standard uncertainty of 3,035 kWh. The table gives no evidence of a large missing load, and no proof that none exists. ✅

Step 4: Check the table a second way

Click to reveal the checks
  1. The nameplate method as an upper limit. Full-load input times hours for the three motors gives kWh. With that figure the six loads would sum to 45,264 kWh, more than the bill. This is the negative remainder that exposes a nameplate audit. ✅

  2. Effect of logging the weakest load. If the three process motors were logged for a week and known to 5 percent, their term would fall from 2,779 to 556 kWh and the total to 1,340 kWh, which is 3.4 percent. One logger on one load halves the uncertainty of the whole table. ✅

  3. Check with the script. The Python script below builds the table from the same data and prints the same 39,278 kWh, the remainder of 2,722 kWh, and the uncertainties of 3,035 and 1,340 kWh. ✅

Application 2: What to log before projects A and C



Both loads are small: the booster pump uses kWh a month (1.4 percent of the bill) and the cold room kWh (1.9 percent). The booster pump was not one of the six groups, so its 586 kWh are part of the remainder of 2,722 kWh; the cold room is inside the base load. A remainder holds small known loads as well as errors. Each project needs its own instruments.

PumpMotorPowerloggerplace forsupplythe newdriveshaftPFsuction●●tobuildingP = pressure sensorF = flow meterthe power logger is upstream of the drive
Project A: where the instruments go

Step 1: Project A, the booster pump

Click to reveal the logging plan for project A
  1. List what decides the pump’s energy. The power depends on the flow and on the pressure the pump must give, and the energy also depends on the hours. A saving in kW means nothing if the flow or the pressure also changed. ✅

  2. Choose the instrument, place, interval and duration for each.

    QuantityWhereIntervalDurationReason
    Electrical power (kW, three-phase power logger)On the supply to the pump, upstream of the place where the drive will be fitted1 minute14 daysThe losses of the drive must be inside the measurement afterwards
    Flow (flow meter)On the discharge pipe, on a straight length1 minute14 daysDemand changes within minutes. Power must be paired with flow at the same moment
    Discharge pressure (pressure sensor)After the pump, before the first branch1 minute14 daysShows that the building receives the same service before and after
    Running state and hoursFrom the power record, and from an hour counter read each month1 minute, then monthly14 days, then continuing3,000 hours a year is an estimate. Two weeks cannot confirm a yearly figure

    The same points are used again after the drive is fitted. ✅

  3. Why 14 days and 1 minute. The demand for water follows the working week, so the full cycle is 7 days, and two cycles show whether the first week was typical. The power of a pump is not proportional to its flow, so an average over 15 minutes of mixed high and low flow does not belong to the average flow. One-minute pairs keep the relation, in rows for each quantity. ✅

Step 2: Project C, the cold room

Click to reveal the logging plan for project C
  1. List what decides the cold room’s energy. Heat enters through the walls, driven by the outdoor temperature, and through the door while it is open. The room set point and the warm product loaded also matter. ✅

  2. Choose the instrument, place, interval and duration for each.

    QuantityWhereIntervalDurationReason
    Electrical energy (kWh meter)On the supply to the cold room: compressor, fans and defrost heater together15 minutes, summed to each dayAt least 28 days, longer if the weather has not variedThe compressor cycles in minutes and defrost repeats daily. A daily total removes both cycles
    Door-open time (door switch)On the door frameEvery opening and closing, summed to minutes a daySame daysThe curtain acts on this heat
    Outdoor air temperatureIn shade, near the condenser air inlet15 minutes, averaged to each daySame daysDrives the wall heat and the condenser’s work
    Room air temperatureReturn air, away from the door5 minutesSame daysShows the set point was held
    Product loadedDelivery notesEach daySame daysWarm product is a heat load that neither measure changes

    Energy and its two drivers are recorded on the same days. ✅

  3. Why at least 28 days, and why that may not be enough. Four weeks give 28 daily points to fit a baseline with three coefficients (a constant, door-open minutes and outdoor temperature), 25 more than the minimum. But the full cycle of the weather is a season, and a baseline is valid only inside the range of conditions it has seen. If the 28 days were all mild, it says nothing about a hot month. Record the range of outdoor temperature and of door-open minutes that the baseline covers. ✅

Step 3: Can the meter see the saving?

Click to reveal the check
  1. Expected saving in power.

    This is 38 percent of the power before. ✅

  2. Uncertainty of each reading. At 2 percent of reading, kW and kW. ✅

  3. Uncertainty of the difference. A saving is a difference of two readings, so the two combine by root sum of squares.

    This is 6.3 percent of the saving. The saving is 16 times its standard uncertainty, so this meter can see it clearly, and the script confirms both values. ✅

Verify It in Python



The script builds the breakdown of Application 1, reconciles it with the bill and combines the uncertainties. It repeats the other checks of both applications and saves a bar chart with one standard uncertainty on each bar.

end_use_breakdown.py
"""End-use breakdown of a site's monthly energy, with the uncertainty of the total."""
import numpy as np
import matplotlib.pyplot as plt
BILL = 42000.0 # kWh in the month, from the utility meter
DAYS, WORK_DAYS = 30, 26
# name, kW while running, hours in the month, standard uncertainty, how obtained
loads = [
("Air compressor", 24.2, 14.0 * DAYS, 0.03, "logged 7 days"),
("Three process motors", 37.0 / 0.90 * 0.65, 16.0 * WORK_DAYS, 0.25, "nameplate estimate"),
("Borehole pump", 9.4, 18.0 * DAYS, 0.08, "spot kW, hour meter"),
("Lighting", None, None, 0.15, "count, hours estimated"),
("Office and sockets", 6.5, 10.0 * WORK_DAYS, 0.30, "estimate"),
("Base load", 8.4, 24.0 * DAYS, 0.10, "night reading"),
]
LIGHTING_KWH = 8.64 * 350.0 + 6.0 * 12.0 * DAYS # store fittings + yard and production
names, kwh, rel = [], [], []
for name, kw, hours, u, how in loads:
energy = LIGHTING_KWH if kw is None else kw * hours
names.append(name)
kwh.append(energy)
rel.append(u)
kwh, rel = np.array(kwh), np.array(rel)
u_abs = kwh * rel
print("End-use breakdown, kWh in a 30 day month")
order = np.argsort(-kwh)
for k in order:
print(f" {names[k]:<21}{kwh[k]:>8,.0f} kWh {100 * kwh[k] / BILL:>5.1f} % "
f"u = {100 * rel[k]:>2.0f} % = {u_abs[k]:>5,.0f} kWh ({loads[k][4]})")
total = kwh.sum()
gap = BILL - total
u_total = np.sqrt(np.sum(u_abs ** 2))
print(f" explained {total:,.0f} kWh, bill {BILL:,.0f} kWh, "
f"remainder {gap:,.0f} kWh ({100 * gap / BILL:.1f} %)")
print(f" standard uncertainty of the total {u_total:,.0f} kWh "
f"({100 * u_total / total:.1f} %), expanded {2 * u_total:,.0f} kWh")
print(f" share of the variance from the three motors "
f"{100 * u_abs[1] ** 2 / np.sum(u_abs ** 2):.0f} %")
u_better = np.sqrt(np.sum(u_abs ** 2) - u_abs[1] ** 2 + (0.05 * kwh[1]) ** 2)
print(f" with the three motors logged to 5 %: {u_better:,.0f} kWh "
f"({100 * u_better / total:.1f} %)")
full = 37.0 / 0.90
print("Nameplate against estimate, three process motors")
print(f" rated output x hours {37.0 * 16 * WORK_DAYS:,.0f} kWh, "
f"full-load input x hours {full * 16 * WORK_DAYS:,.0f} kWh, "
f"with load factor 0.65 {kwh[1]:,.0f} kWh")
# One week of the compressor: 24.2 kW while running, hours differ by day
run_hours = np.array([16, 16, 16, 16, 16, 12, 6], dtype=float) # Mon to Sun
print("Compressor, month estimated from one day or from the week")
for label, h in (("Monday only", run_hours[0]), ("Sunday only", run_hours[6]),
("whole week", run_hours.mean())):
print(f" {label:<12}{h:>5.1f} h/day -> {24.2 * h * DAYS:>7,.0f} kWh")
# Project A: uncertainty of a saving found from two power readings
before, after, meter = 2.345, 1.462, 0.02
u_saving = np.hypot(meter * before, meter * after)
print(f"Project A: saving {before - after:.3f} kW, standard uncertainty "
f"{u_saving:.3f} kW ({100 * u_saving / (before - after):.1f} %)")
print(f" rows in 14 days at 1 minute: {14 * 24 * 60}, "
f"in 28 days at 15 minutes: {28 * 96}")
# ---------- Plot ----------
fig, ax = plt.subplots(figsize=(8, 4.5))
labels = [names[k] for k in order] + ["Remainder"]
values = list(kwh[order]) + [gap]
errors = list(u_abs[order]) + [u_total]
ax.barh(labels[::-1], values[::-1], xerr=errors[::-1], capsize=4)
ax.set_xlabel("kWh in the month (bar: estimate, line: one standard uncertainty)")
ax.set_title("Where 42,000 kWh a month goes")
fig.tight_layout()
fig.savefig("end_use_breakdown.png", dpi=120)
print("Saved end_use_breakdown.png")

Expected output

End-use breakdown, kWh in a 30 day month
Three process motors 11,116 kWh 26.5 % u = 25 % = 2,779 kWh (nameplate estimate)
Air compressor 10,164 kWh 24.2 % u = 3 % = 305 kWh (logged 7 days)
Base load 6,048 kWh 14.4 % u = 10 % = 605 kWh (night reading)
Lighting 5,184 kWh 12.3 % u = 15 % = 778 kWh (count, hours estimated)
Borehole pump 5,076 kWh 12.1 % u = 8 % = 406 kWh (spot kW, hour meter)
Office and sockets 1,690 kWh 4.0 % u = 30 % = 507 kWh (estimate)
explained 39,278 kWh, bill 42,000 kWh, remainder 2,722 kWh (6.5 %)
standard uncertainty of the total 3,035 kWh (7.7 %), expanded 6,069 kWh
share of the variance from the three motors 84 %
with the three motors logged to 5 %: 1,340 kWh (3.4 %)
Nameplate against estimate, three process motors
rated output x hours 15,392 kWh, full-load input x hours 17,102 kWh, with load factor 0.65 11,116 kWh
Compressor, month estimated from one day or from the week
Monday only 16.0 h/day -> 11,616 kWh
Sunday only 6.0 h/day -> 4,356 kWh
whole week 14.0 h/day -> 10,164 kWh
Project A: saving 0.883 kW, standard uncertainty 0.055 kW (6.3 %)
rows in 14 days at 1 minute: 20160, in 28 days at 15 minutes: 2688
Saved end_use_breakdown.png

In the chart the uncertainty line on the three process motors is longer than the whole bar of the office load.

Common Mistakes



  • Multiplying nameplate power by switch-on hours. The result is an upper limit. Use the load factor and the real running time.
  • Adjusting the estimates until they add up to the bill. The error is then hidden inside the largest loads. Print the remainder.
  • Taking one spot reading of a load that cycles, or logging for one convenient day. Log through at least one full cycle of whatever drives the load.
  • Measuring current alone. Without the power factor, the power of a lightly loaded motor is overstated.

Summary



  • An audit is an energy balance: the end uses plus a stated remainder equal the metered energy. The three levels differ in how much is measured.
  • The energy of a motor is its rated power divided by efficiency, times the load factor, times the real running hours. Nameplate power times hours overstates almost every motor.
  • A spot measurement suits a steady load. A changing load is logged for at least one full cycle of what drives it: a day, a week or a season.
  • In the example, six loads explain 39,278 of 42,000 kWh, the remainder is 2,722 kWh, and the standard uncertainty of the total is 3,035 kWh. The three process motors supply 84 percent of that uncertainty.
  • Before a project, log the energy with the quantities that drive it, at the place where the saving will be claimed. The condition before the work cannot be measured afterwards.

Exercises



1. A motor has a rated output of 11 kW and an efficiency of 0.90. It runs 300 hours in a month at an estimated load factor of 0.60. Find its energy for the month, and the figure that “rated output times hours” would give.

Answer

kWh. Rated output times hours gives kWh, which is 50 percent too high.

2. A power meter on a three-phase pump reads 400 V line voltage, 18 A and a power factor of 0.82. Find the active power.

Answer

W, which is 10.2 kW.

3. Two loads are estimated as 8,000 kWh with a standard uncertainty of 5 percent and 3,000 kWh with a standard uncertainty of 20 percent. Find the standard uncertainty of their sum, in kWh and in percent. Which load should be measured better first?

Answer

kWh and kWh. kWh, which is 6.6 percent of 11,000 kWh. The smaller load has the larger uncertainty in kWh, so it should be measured better first.

4. A machine runs 20 hours on each of five working days, 10 hours on Saturday and not at all on Sunday. An auditor logs it for one Monday and uses that day for the month. By how much is the estimate too high?

Answer

The weekly mean is hours a day. The Monday figure is 20 hours a day, and , so the estimate is 27 percent too high. A full week is the shortest record that describes this machine.

5. In Application 1 the utility meter has a standard uncertainty of 1 percent. Find the standard uncertainty of the remainder. Is the remainder of 2,722 kWh evidence of a missing load?

Answer

The meter’s uncertainty is kWh. The remainder is the bill minus the explained total, so kWh. The remainder is standard uncertainties from zero. That is not evidence of a missing load, and not proof that none exists.

References



  • B. L. Capehart, W. C. Turner and W. J. Kennedy, Guide to Energy Management, 8th edition, Fairmont Press, 2016.
  • A. Thumann and D. P. Mehta, Handbook of Energy Engineering, 7th edition, Fairmont Press, 2013.
  • ISO 50002, Energy audits, International Organization for Standardization. Named here as a standard for energy audits. Its current edition decides its content.


© 2021-2026 SiliconWit®. All rights reserved.
utility supply Meter 42,000 kWh in the month Main board Air compressor Three motors Borehole pump Lighting Offices and sockets Base load ? not found Six groups of load are known; the remainder is whatever the meter recorded that the six do not explain.
One meter, six groups of load, one remainder
0 8 24 kW time A B C true average 17.2 kW A reads 24 kW, B reads 8 kW, C reads 24 kW. The true average lies between them: only the whole record gives the energy.
Three spot readings of a load that cycles
supply Power logger place for the new drive Motor shaft Pump suction P F to the building P = pressure sensor, F = flow meter. The power logger is upstream of the drive, so it reads the same point before and after.
Project A: where the instruments go
Predict first

An auditor multiplies the rated output of three motors, 37 kW in total, by the 416 hours they are switched on in a month. Compared with a careful estimate of their energy, this figure is most likely:

rated × hours÷ efficiency× load factor 0.65 15,39217,10211,116 kWh in one month, the same three motors
MonTueWedThuFriSatSun mean of the week: 14.0 h 16 h a day 6 h
See it: does the audit add up to the bill?

Explained by the six loads
Remainder, bill minus loads
Standard uncertainty of the total

The bar holds the six loads of Application 1 in a 30 day month. The three motors are estimated from the nameplate (37 kW, efficiency 0.90, 416 hours) with the load factor you choose. The compressor is 24.2 kW times the hours a day from the log, times 30 days. The other four loads are as in the lesson. The whisker is ± U, twice the root sum of squares of each load's uncertainty in kWh.

Check yourself

Three questions. Each wrong choice is a mistake people really make, so read the note after you answer.

1. A fan motor has a rated output of 15 kW and an efficiency of 0.90. It runs 300 hours in a month at an estimated load factor of 0.5. What energy should the audit table show for it?

2. Two loads are in an audit. A furnace uses 20,000 kWh a month, logged, with a standard uncertainty of 4 percent. A group of pumps uses 4,000 kWh, estimated, with 25 percent. You have one logger. Where does it go?

3. A machine runs 22 hours on each of five working days, 8 hours on Saturday and not at all on Sunday. An auditor logs it on one Wednesday and uses that day for the month. How far off is the monthly figure?

Watch it build: the energy balance
Meter: 42,000 kWh MotorsAirBaseLightPumpLoads add to 39,278 kWhRemainder 2,722 kWh, 6.5 % MotorsAirBaseLightPumpNameplate motors: 45,264 kWhRemainder −3,264: an error MotorsAirBaseLightPump Motors and air: 21,280 kWh51 % of the bill. Measure here. 37 kW, 1 h a day: 1,110 kWh3 kW fan, all day: 2,160 kWh
  1. The meter recorded 42,000 kWh. The six loads add to 39,278; the remainder, 2,722 kWh (6.5 %), is printed.
  2. Nameplate power at full load gives the motors 17,102 kWh: the sum passes the bill by 3,264.
  3. Ranked by energy, two loads hold 21,280 kWh, half the bill. They get the loggers.
  4. Rank by energy, not power: a 3 kW fan that never stops beats 37 kW for one hour.
Found this useful?