Control, Measurement & Energy · Course

How Sure Is the Saving?

Lesson 8 of 10 23 min read
Found this useful?

A contractor reports a saving of 11.46 percent and asks to be paid on it. The owner’s accountant asks one question: could the real figure be 9 percent, or 14? Nobody in the room can answer, so the meeting becomes an argument about trust in place of a discussion of numbers. A saving is the difference between a measured quantity and an estimate of what would have happened, and every estimate has a range. This lesson shows where the range comes from, how to calculate it for a baseline model and for a measured power with agreed hours, and how to say when a saving is too uncertain to report. #SavingsUncertainty #MeasurementAndVerification #EnergySavings

Learning Objectives

By the end of this lesson, you will be able to:

  1. Name the four sources of uncertainty in a reported saving and say which apply to a given project
  2. Combine independent uncertainties by root sum of squares, for a sum and for a product
  3. Calculate the uncertainty of avoided energy from the RMSE of a baseline model, in the simple form and with the uncertainty of the coefficients
  4. State a saving with its expanded uncertainty and relative precision, and test it against a reporting criterion
  5. Decide which measurement to improve first from each term’s share of the variance

Real-World System Problem: One number in a savings report



The site of this course has a baseline model fitted to one year of daily energy readings. A measure was installed on day 500. Over days 500 to 729 the adjusted baseline is 120,871 kWh, the utility meter recorded 107,014 kWh, and the avoided energy is 13,857 kWh, which is 11.46 percent.

Only one of those three numbers was read from an instrument. The adjusted baseline is the output of a model that was wrong by about 27 kWh on a typical day of its own baseline year, so the avoided energy carries the model’s error.

This data set was generated for the course, so the true saving is known: 12 percent. On a real site nobody knows the true value. The report can give a range, and an honest statement of how it was calculated.

10.6 10.811.4612.1 12.4percentsimplefullertrue 12.0
The estimate, two ranges and the true value

Fundamental Theory: From sources of error to a range



Four sources of uncertainty

Every quantity in a savings calculation is one of four kinds, and each kind brings its own uncertainty.

SourceWhat it isExample
MeasurementThe instrument does not read the true valueA power meter accurate to 2 percent of reading
ModelThe baseline model does not reproduce each dayRMSE of 27.30 kWh a day
SamplingSome items were measured and the rest assumed equal12 fittings measured of 120
EstimatesA value was agreed and never measuredOperating hours agreed as 4,200 a year
EstimatesSamplingModelMeasurementSavingwith itsrangeCombine byroot sum ofsquares
What enters the saving

An uncertainty of this kind is a statement about random error. It does not cover a mistake, such as a wrong meter multiplier or a change on the site that nobody reported. Those are found by checking, not by statistics.

Standard uncertainty and how to combine it

The standard uncertainty of a quantity is the standard deviation of its possible error. Independent errors do not all fall in the same direction, so they combine by root sum of squares, like the sides of a right triangle, and not by simple addition.

Combining independent uncertainties

For a sum or a difference, or , combine the absolute uncertainties:

For a product or a quotient, or , combine the relative uncertainties:

Because the terms are squared, the largest one decides the result.

The expanded uncertainty is . For errors with a normal distribution the range of the value contains the truth in about 95 percent of cases. The relative precision is the expanded uncertainty as a share of the saving:

The simple form for a baseline model

The root mean square error (RMSE) of the baseline model is its typical error on one day. Over the days of the reporting period the daily errors are added. If they are independent, highs and lows partly cancel, and the error of the sum grows with the square root of the number of days.

Simple uncertainty of avoided energy

is the standard uncertainty of the adjusted baseline summed over days, and so of the avoided energy when the meter’s own error is small against it.

The saving grows in proportion to and its uncertainty in proportion to , so the relative precision improves as .

The simple form assumes two things that are not fully true. It treats the model’s coefficients as exact, and it treats the daily errors as independent.

The fuller form: the coefficients are estimates too

The coefficients were fitted to a limited set of noisy days, so they have errors of their own. An intercept 2 kWh too low is 2 kWh too low on every day of the reporting period, and this error does not cancel when days are added.

Ordinary regression theory gives the variance of a sum of predictions. Let be the matrix of the baseline period, with one row for each day: a 1, the cooling degree days and the weekday term. Let be the same matrix for the reporting period, and a column of ones.

Uncertainty of the sum with coefficient uncertainty

The under the root is the simple form: the scatter of the days themselves. The term is the part that comes from the uncertainty of the coefficients. The product is only the column sums of the reporting period: the number of days, the total of the degree days and the number of weekdays.

For the simplest model, a constant mean fitted to baseline days, . A short reporting period measured against a long baseline has a small . A reporting period as long as the baseline period has , and the uncertainty is times the simple form. Because grows with the square of , this part grows as fast as the saving: a longer reporting period cannot reduce it, only a longer or less scattered baseline can.

Autocorrelation, and what a contract should use

On a real site a high day is often followed by another high day. The errors then cancel less, and both forms above are too narrow. A common correction replaces the number of days by a smaller, effective number of independent days. With the lag-1 autocorrelation of the residuals (the correlation between each day’s residual and the next day’s), the uncertainty grows by about the factor . The generated data of this course have independent errors; their baseline residuals give by chance, so the factor is 1.09. Daily data from real buildings often have of 0.3 or more (a factor of 1.36), and hourly data much more.

ASHRAE Guideline 14 states the uncertainty of a saving from a baseline model as the fractional savings uncertainty (FSU): the uncertainty as a share of the saving. Its widely used approximate form, from Reddy and Claridge, is

Here is the CV(RMSE) of the baseline model, is the number of baseline points, the number of reporting points, the saving as a fraction of the adjusted baseline, the Student’s t value for the chosen confidence (about 1 for 68 percent, about 2 for 95 percent), and 1.26 an empirical factor derived for monthly models. For the whole-facility approach the guideline asks for an FSU below 50 percent at 68 percent confidence.

For this site (, , CV(RMSE) 4.74 percent, , so ) the FSU is 3.8 percent at 68 percent confidence, a standard uncertainty of 521 kWh, and 7.4 percent at 95 percent: far inside the limit, and close to the fuller form of Application 1 (7.9 percent). A contract in which money follows the number should use the current guideline’s formula, applied as it says. The forms in this lesson explain where the terms come from.

When can a saving be reported?

A commonly used criterion is that the saving should be at least about twice its standard uncertainty to be reported with confidence: saving , the same as a relative precision of 100 percent or better at about 95 percent. This is a floor, not a target: a saving that only just passes is known to be above zero and little more.

Application 1: Uncertainty of the avoided energy of the site



Step 1: The simple form

Click to reveal the simple range
  1. Standard uncertainty.

    ✅

  2. Expanded uncertainty. kWh. ✅

  3. The saving with its range.

    ✅

  4. Relative precision.

    ✅

  5. As a percentage saving. Divide the ends of the range by the adjusted baseline: percent and percent. The saving is 11.46 percent with a range of about 10.8 to 12.1. ✅

Step 2: The fuller form

Click to reveal the range with coefficient uncertainty
  1. Standard uncertainty.

    The coefficient part alone is kWh. It is nearly as large as the 414 kWh of the daily scatter. ✅

  2. Expanded uncertainty and range. kWh (from unrounded values). The range is 12,768 to 14,946 kWh, or 10.6 to 12.4 percent. ✅

  3. Relative precision. percent. ✅

  4. Check the size of q by hand. For a model that is only a mean, , which gives kWh. The real model gives 544 kWh. It is a little larger because the reporting period is cooler than the average of the baseline year, and a model is less certain away from the centre of its data. ✅

  5. Against the true value. The estimate is 722 kWh below the true 14,579 kWh. That is 1.7 times the simple standard uncertainty and 1.3 times the fuller one. The true value lies inside both ranges, close to the edge of the simple one. ✅

Step 3: Check both forms by simulation

Click to reveal the simulation
  1. The method. The generator is run with 2,000 different seeds. Each run is a new site with the same physics and new weather and new random scatter. For each run the baseline is fitted to the first 365 days and the avoided energy is calculated for days 500 to 729, exactly as before. The true saving of each run is 12 percent of the energy the generator gives before the measure, without the random part. ✅

  2. The spread of the result. The mean estimate is 14,524 kWh against a mean true saving of 14,543 kWh, so the method has almost no bias. The standard deviation of the estimated saving is 538 kWh, and of the error (estimate minus true) 534 kWh. ✅

  3. Compare with the two forms. Over the 2,000 runs the simple form gives a mean of 424 kWh and the fuller form 560 kWh. The real spread of 534 kWh is far from the first and close to the second. ✅

  4. Coverage. The range of the estimate contains the true saving in 88.8 percent of runs with the simple form and in 96.7 percent with the fuller form. A range that claims about 95 percent should reach it. The simple form does not. ✅

  5. A stricter definition of the truth. If the random part of each day is counted as energy the site would really have used, the error has a standard deviation of 572 kWh, and the coverage is 86.2 percent (simple) and 95.3 percent (fuller). The fuller form holds under both definitions. ✅

  6. The check you can make on a real site. No real site can be run 2,000 times, but every site has days before the measure that the model did not see. Apply the whole method to days 365 to 499, where the true saving is zero. The “saving” is kWh (the meter read 0.53 percent above the model), and the fuller form gives kWh, a range of to kWh. The range contains zero, as it should. If it did not, the model or the range would be wrong, and the report should not go out until the reason is found. ✅

Step 4: The reporting criterion, the period and a smaller saving

Click to reveal the comparison
  1. The criterion. The saving is times its standard uncertainty by the fuller form, far above the commonly used 2. This saving can be reported with confidence. ✅

  2. Length of the reporting period, simple form. Take the mean of this period: an adjusted baseline of 525.5 kWh a day and a saving of 60.25 kWh a day. The relative precision is .

    Reporting days (kWh)Saving found, 11.46 percentA saving of 3 percent
    3029916.5 percent63.2 percent
    905189.6 percent36.5 percent
    2308286.0 percent22.8 percent
    3651,0434.7 percent18.1 percent

    Four times as many days halve the relative precision. ✅

  3. A saving of 3 percent. It is 15.77 kWh a day. It passes the criterion of twice its standard uncertainty after 12 days by the simple form. After 230 days it is 3,626 kWh, known to 22.8 percent by the simple form and to 30.0 percent by the fuller form. It can be reported, and the report must say “3 percent, between about 2 and 4”. ✅

  4. The floor. The coefficient part alone, 353 kWh over 230 days, is 5.1 percent of the saving found at , and 19.5 percent of a saving of 3 percent. Because this part grows in proportion to the saving, more reporting days do not reduce it. ✅

  5. Check with the script. The script prints 414 and 544 kWh, 828 and 1,089 kWh, 6.0 and 7.9 percent, the table above, and the simulation figures. All agree with the hand values. ✅

Application 2: Project D by Option A



Share of the variance, project D
power ## 3.8 %
hours ######################################## 96.2 %

Step 1: The saving and its uncertainty

Click to reveal the combined uncertainty
  1. The saving.

    At the example price this is 217,728 currency units a year. ✅

  2. Combined relative standard uncertainty. The saving is a product, so the relative uncertainties combine. The count has none.

    ✅

  3. In kWh. kWh and kWh (from unrounded values). ✅

  4. The range.

    In money: 217,728 plus or minus 44,408, which is 173,320 to 262,136 currency units a year. The relative precision is 20.4 percent. ✅

Step 2: Which term to improve first

Click to reveal the comparison
  1. Share of the variance. Power: percent. Hours: percent. ✅

  2. A better power meter. With the power known to 1 percent: percent, and kWh. The range is narrower by 54 kWh. The money for the meter is wasted. ✅

  3. Logged hours. With an hours counter or a logger on the lighting circuit, the hours are known to about 2 percent: percent, and kWh, which is 12,317 currency units. The range is less than a third of what it was. Log the hours first. ✅

  4. Check a second way. The script draws 200,000 random pairs of power and hours with these uncertainties and calculates the saving for each. The standard deviation is 1,845 kWh, against 1,850 kWh from the root sum of squares. ✅

Verify It in Python



The script calculates both forms of the uncertainty for the site, repeats the whole analysis for 2,000 simulated sites, gives the relative precision against the length of the reporting period, and works project D. It saves one plot: the error of the estimated saving over the 2,000 runs, with the two forms drawn over it.

savings_uncertainty.py
"""How sure is the saving? Baseline model uncertainty, a simulation check, and Option A."""
import numpy as np
import matplotlib.pyplot as plt
PRICE = 12.00 # currency units per kWh
def building_daily(seed=23, days=730):
rng = np.random.default_rng(seed)
d = np.arange(days)
temp = 21.0 + 4.5 * np.sin(2 * np.pi * (d - 20) / 365.0) + rng.normal(0, 1.6, days)
weekday = (d % 7) < 5
cdd = np.clip(temp - 18.0, 0.0, None)
energy = 310.0 + 42.0 * cdd + np.where(weekday, 180.0, 0.0) + rng.normal(0, 28.0, days)
energy[500:] *= 0.88
return d, temp, weekday, energy # kWh a day
def avoided_energy(seed):
"""Fit days 0 to 364, report days 500 to 729. Returns the pieces of the result."""
d, temp, weekday, energy = building_daily(seed)
cdd = np.clip(temp - 18.0, 0.0, None)
X = np.column_stack([np.ones(d.size), cdd, weekday.astype(float)])
Xb, yb, Xr, yr = X[:365], energy[:365], X[500:], energy[500:]
coef, *_ = np.linalg.lstsq(Xb, yb, rcond=None)
rmse = np.sqrt(np.sum((yb - Xb @ coef) ** 2) / (365 - 3))
m = yr.size
s = Xr.sum(axis=0) # column sums of the reporting period
q = s @ np.linalg.solve(Xb.T @ Xb, s) # 1' Xr (Xb'Xb)^-1 Xr' 1
saving = (Xr @ coef).sum() - yr.sum()
noiseless = Xr @ np.array([310.0, 42.0, 180.0]) # unsaved energy without noise
return dict(coef=coef, rmse=rmse, m=m, q=q, base=(Xr @ coef).sum(), meas=yr.sum(),
saving=saving, u_simple=rmse * np.sqrt(m), u_full=rmse * np.sqrt(m + q),
true=0.12 * noiseless.sum(), true_noisy=0.12 * yr.sum() / 0.88,
sums=s, mean_base=yb.mean())
# ---------- Part 1: the site of this course ----------
r = avoided_energy(23)
S, base = r["saving"], r["base"]
print("Baseline on days 0 to 364, reporting period days 500 to 729")
print(f" RMSE {r['rmse']:.2f} kWh, CV(RMSE) {100 * r['rmse'] / r['mean_base']:.2f} %, m = {r['m']} days")
print(f" adjusted baseline {base:.0f}, measured {r['meas']:.0f}, "
f"avoided {S:.0f} kWh = {100 * S / base:.2f} %")
for name, u in (("simple", r["u_simple"]), ("fuller", r["u_full"])):
U = 2 * u
print(f" {name}: u = {u:.0f} kWh, U = {U:.0f} kWh, range {S - U:.0f} to {S + U:.0f} kWh "
f"= {100 * (S - U) / base:.1f} to {100 * (S + U) / base:.1f} %, "
f"relative precision {100 * U / S:.1f} %, saving / u = {S / u:.1f}")
print(f" column sums of the reporting period: {r['sums'][0]:.0f} days, "
f"{r['sums'][1]:.1f} degree days, {r['sums'][2]:.0f} weekdays")
print(f" coefficient term: q = {r['q']:.1f} against m = {r['m']}, "
f"u of that part alone {r['rmse'] * np.sqrt(r['q']):.0f} kWh")
print(f" mean-only model for comparison: q = m^2/n = {r['m'] ** 2 / 365:.1f}, "
f"u = {r['rmse'] * np.sqrt(r['m'] + r['m'] ** 2 / 365):.0f} kWh")
print(f" true saving of this data set: {r['true']:.0f} kWh without the daily noise "
f"(estimate {S - r['true']:+.0f}), {r['true_noisy']:.0f} kWh with it "
f"(estimate {S - r['true_noisy']:+.0f})")
# ---------- Part 2: simulation with 2,000 seeds ----------
runs = [avoided_energy(seed) for seed in range(2000)]
est = np.array([x["saving"] for x in runs])
tru = np.array([x["true"] for x in runs])
us = np.array([x["u_simple"] for x in runs])
uf = np.array([x["u_full"] for x in runs])
err = est - tru
print("Simulation, 2000 data sets from the same generator")
print(f" mean estimated saving {est.mean():.0f} kWh, mean true saving {tru.mean():.0f} kWh")
print(f" standard deviation of the estimated saving {est.std(ddof=1):.0f} kWh")
print(f" standard deviation of (estimate - true) {err.std(ddof=1):.0f} kWh, mean {err.mean():+.0f} kWh")
print(f" mean u: simple {us.mean():.0f} kWh, fuller {uf.mean():.0f} kWh")
print(f" true saving inside estimate +/- 2u: simple {100 * np.mean(np.abs(err) <= 2 * us):.1f} %, "
f"fuller {100 * np.mean(np.abs(err) <= 2 * uf):.1f} %")
err2 = est - np.array([x["true_noisy"] for x in runs])
print(f" with the daily noise counted in the true saving: standard deviation {err2.std(ddof=1):.0f} kWh, "
f"inside: simple {100 * np.mean(np.abs(err2) <= 2 * us):.1f} %, "
f"fuller {100 * np.mean(np.abs(err2) <= 2 * uf):.1f} %")
# ---------- Part 3: length of the reporting period and size of the saving ----------
day_base = base / r["m"] # mean adjusted baseline, kWh a day
print(f"Relative precision by the simple form, baseline {day_base:.1f} kWh a day")
print(" U = 2 x RMSE x sqrt(m): " + ", ".join(
f"{m} d: {2 * r['rmse'] * np.sqrt(m):.0f} kWh" for m in (30, 90, 230, 365)))
for label, per_day in (("saving found", S / r["m"]), ("3 percent saving", 0.03 * day_base)):
row = ", ".join(f"{m} d: {100 * 2 * r['rmse'] * np.sqrt(m) / (per_day * m):.1f} %"
for m in (30, 90, 230, 365))
print(f" {label} ({per_day:.2f} kWh a day): {row}")
print(f" days until saving = 2u: {(2 * r['rmse'] / per_day) ** 2:.1f}")
s3 = 0.03 * base
print(f" 3 percent over 230 days: {s3:.0f} kWh, fuller relative precision "
f"{100 * 2 * r['u_full'] / s3:.1f} %, saving / u = {s3 / r['u_full']:.1f}")
print(f" floor set by the coefficients: {100 * 2 * r['rmse'] * np.sqrt(r['q']) / S:.1f} % "
f"of the saving found, {100 * 2 * r['rmse'] * np.sqrt(r['q']) / s3:.1f} % of a 3 percent saving")
# ---------- Part 4: project D by Option A ----------
N, DP, H = 120, 36.0, 4200.0 # fittings, W each, hours a year
U_P, U_H = 0.02, 0.10 # relative standard uncertainties
sav = N * DP * H / 1000.0
u_rel = np.hypot(U_P, U_H)
u = u_rel * sav
print("Project D by Option A")
print(f" saving {sav:.0f} kWh a year = {sav * PRICE:.0f} currency units")
print(f" combined relative standard uncertainty {100 * u_rel:.2f} %, u = {u:.0f} kWh, U = {2 * u:.0f} kWh")
print(f" range {sav - 2 * u:.0f} to {sav + 2 * u:.0f} kWh, "
f"{(sav - 2 * u) * PRICE:.0f} to {(sav + 2 * u) * PRICE:.0f} currency units "
f"(U = {2 * u * PRICE:.0f})")
print(f" share of the variance: power {100 * U_P ** 2 / u_rel ** 2:.1f} %, "
f"hours {100 * U_H ** 2 / u_rel ** 2:.1f} %")
for name, a, b in (("power to 1 %", 0.01, U_H), ("hours logged to 2 %", U_P, 0.02)):
ur = np.hypot(a, b)
print(f" {name}: {100 * ur:.2f} %, U = {2 * ur * sav:.0f} kWh = {2 * ur * sav * PRICE:.0f} currency units")
lo, hi = N * DP * (1 - U_P) * H * (1 - U_H) / 1000, N * DP * (1 + U_P) * H * (1 + U_H) / 1000
print(f" both one standard uncertainty low or high: {lo:.0f} to {hi:.0f} kWh "
f"(root sum of squares gives {sav - u:.0f} to {sav + u:.0f})")
rng = np.random.default_rng(1)
mc = N * DP * (1 + rng.normal(0, U_P, 200_000)) * H * (1 + rng.normal(0, U_H, 200_000)) / 1000
print(f" random trial of 200000 cases: standard deviation {mc.std():.0f} kWh")
# ---------- Plot ----------
fig, ax = plt.subplots(figsize=(8, 5))
ax.hist(err, bins=50, density=True, alpha=0.6, label="2,000 simulated sites")
x = np.linspace(err.min(), err.max(), 300)
for name, u_ in (("simple", us.mean()), ("fuller", uf.mean())):
ax.plot(x, np.exp(-0.5 * (x / u_) ** 2) / (u_ * np.sqrt(2 * np.pi)), label=f"{name}, u = {u_:.0f} kWh")
ax.set_xlabel("estimated saving minus true saving, kWh")
ax.set_ylabel("density")
ax.set_title("Error of the avoided energy over 230 days")
ax.legend()
fig.tight_layout()
fig.savefig("savings_uncertainty.png", dpi=120)
print("Saved savings_uncertainty.png")

Expected output

Baseline on days 0 to 364, reporting period days 500 to 729
RMSE 27.30 kWh, CV(RMSE) 4.74 %, m = 230 days
adjusted baseline 120871, measured 107014, avoided 13857 kWh = 11.46 %
simple: u = 414 kWh, U = 828 kWh, range 13029 to 14685 kWh = 10.8 to 12.1 %, relative precision 6.0 %, saving / u = 33.5
fuller: u = 544 kWh, U = 1089 kWh, range 12768 to 14946 kWh = 10.6 to 12.4 %, relative precision 7.9 %, saving / u = 25.5
column sums of the reporting period: 230 days, 492.2 degree days, 164 weekdays
coefficient term: q = 167.6 against m = 230, u of that part alone 353 kWh
mean-only model for comparison: q = m^2/n = 144.9, u = 529 kWh
true saving of this data set: 14579 kWh without the daily noise (estimate -722), 14593 kWh with it (estimate -736)
Simulation, 2000 data sets from the same generator
mean estimated saving 14524 kWh, mean true saving 14543 kWh
standard deviation of the estimated saving 538 kWh
standard deviation of (estimate - true) 534 kWh, mean -19 kWh
mean u: simple 424 kWh, fuller 560 kWh
true saving inside estimate +/- 2u: simple 88.8 %, fuller 96.7 %
with the daily noise counted in the true saving: standard deviation 572 kWh, inside: simple 86.2 %, fuller 95.3 %
Relative precision by the simple form, baseline 525.5 kWh a day
U = 2 x RMSE x sqrt(m): 30 d: 299 kWh, 90 d: 518 kWh, 230 d: 828 kWh, 365 d: 1043 kWh
saving found (60.25 kWh a day): 30 d: 16.5 %, 90 d: 9.6 %, 230 d: 6.0 %, 365 d: 4.7 %
days until saving = 2u: 0.8
3 percent saving (15.77 kWh a day): 30 d: 63.2 %, 90 d: 36.5 %, 230 d: 22.8 %, 365 d: 18.1 %
days until saving = 2u: 12.0
3 percent over 230 days: 3626 kWh, fuller relative precision 30.0 %, saving / u = 6.7
floor set by the coefficients: 5.1 % of the saving found, 19.5 % of a 3 percent saving
Project D by Option A
saving 18144 kWh a year = 217728 currency units
combined relative standard uncertainty 10.20 %, u = 1850 kWh, U = 3701 kWh
range 14443 to 21845 kWh, 173320 to 262136 currency units (U = 44408)
share of the variance: power 3.8 %, hours 96.2 %
power to 1 %: 10.05 %, U = 3647 kWh = 43763 currency units
hours logged to 2 %: 2.83 %, U = 1026 kWh = 12317 currency units
both one standard uncertainty low or high: 16003 to 20358 kWh (root sum of squares gives 16294 to 19994)
random trial of 200000 cases: standard deviation 1845 kWh
Saved savings_uncertainty.png

In the plot the curve of the fuller form follows the simulated errors, and the curve of the simple form is too narrow and too tall.

Common Mistakes



  • Reporting a saving as one number. State the expanded uncertainty or the range, the coverage (about 95 percent) and the method used.
  • Quoting the accuracy of the meter as the accuracy of the saving. The saving is a difference, and a small error in the baseline is a large share of it.
  • Using RMSE × √m in a contract as if it were complete. It leaves out the uncertainty of the coefficients and autocorrelation, and in the simulation its range held the truth in 89 cases of 100.
  • Adding percentage uncertainties directly. Independent terms combine by root sum of squares.
  • Improving the instrument that is easy to improve. Calculate each term’s share of the variance and improve the largest.
  • Expecting a longer reporting period to cure a short or scattered baseline. The coefficient part of the uncertainty grows as fast as the saving.

Summary



  • A saving carries uncertainty from measurement, the baseline model, sampling and agreed estimates. Independent terms combine by root sum of squares, and the expanded uncertainty is twice the standard uncertainty.
  • The simple form for a baseline model is RMSE × √m. For the site it gives 414 kWh standard and 828 kWh expanded: 13,857 kWh plus or minus 828, a relative precision of 6.0 percent, or 11.46 percent with a range of 10.8 to 12.1.
  • With the uncertainty of the coefficients the standard uncertainty is 544 kWh and the range is 12,768 to 14,946 kWh. In 2,000 simulated sites this range held the true saving in 96.7 percent of cases, and the simple range in 88.8 percent.
  • A commonly used criterion is that a saving should be at least about twice its standard uncertainty to be reported with confidence. For a contract, use the formula of the current ASHRAE Guideline 14, which also corrects for autocorrelation.
  • Project D by Option A saves 18,144 kWh a year plus or minus 3,701 kWh. The agreed hours give 96.2 percent of the variance, so the hours are the first thing to measure.

Exercises



1. A motor is replaced. The power reduction is 0.70 kW, measured with a relative standard uncertainty of 3 percent. The hours are agreed as 5,000 a year with a relative standard uncertainty of 8 percent. Find the saving and its expanded uncertainty.

Answer

kWh a year. percent. kWh. The saving is 3,500 plus or minus 598 kWh a year.

2. An old fitting is measured as 72 W and a new one as 36 W, with two different meters, each with a relative standard uncertainty of 2 percent of its reading. Find the standard uncertainty of the power reduction in watts and in percent. Why is it not 2 percent?

Answer

The uncertainties are W and W. For a difference the absolute values combine: W, which is percent of the reduction. A difference keeps the absolute errors of both readings and is smaller than either reading. With one meter for both readings, an error of scale is common to the two and largely cancels.

3. A baseline model has an RMSE of 40 kWh a day, and a measure is expected to save 25 kWh a day. By the simple form, after how many days does the saving equal twice its standard uncertainty? How many days are needed for a relative precision of 20 percent?

Answer

Saving : , so and , which means 11 days. For 20 percent: , so and days.

4. A baseline that is a constant mean was fitted to 365 days with an RMSE of 30 kWh. The reporting period is 180 days. Find the standard uncertainty of the summed baseline by the simple form and with the coefficient term .

Answer

Simple: kWh. Fuller: , so kWh, which is 1.22 times the simple form.

References



  • ASHRAE, Guideline 14-2014: Measurement of Energy, Demand, and Water Savings, ASHRAE, 2014.
  • Efficiency Valuation Organization, International Performance Measurement and Verification Protocol (IPMVP): Core Concepts, current edition.
  • Joint Committee for Guides in Metrology, Evaluation of measurement data: Guide to the expression of uncertainty in measurement, JCGM 100:2008.
  • D. C. Montgomery, E. A. Peck and G. G. Vining, Introduction to Linear Regression Analysis, 5th edition, Wiley, 2012.


© 2021-2026 SiliconWit®. All rights reserved.
10 10.5 11 11.5 12 12.5 13 percent of the adjusted baseline fuller 10.6 12.4 simple 10.8 12.1 estimate 11.46 true 12.0
The estimate, two ranges and the true value
Measurement Model Sampling Estimates Combine by root sum of squares Saving with its range u = √(u₁² + u₂² + u₃² + u₄²) for independent sources
What enters the saving
power 3.8 % 2 % of reading hours 96.2 % 10 %, agreed Each term enters as its square, so the larger uncertainty takes almost all of the variance.
Share of the variance, project D
Predict first

After 90 days of the reporting period, a saving is known to within 9.6 percent of its value. The site and the saving stay the same. How well is the saving known after 360 days, four times as long?

See it: the saving grows faster than its uncertainty

Saving
Standard uncertainty, u
Expanded uncertainty, U
Relative precision, U / saving
Saving divided by u
Saving is at least 2u from
Fuller form, approximate

The saving is the saving fraction × the mean baseline energy of a day × the number of days. The shaded band is ± U by the simple form, U = 2 × RMSE × √m, and the first six readouts use this form. The dashed band is the fuller form, U = 2 × RMSE × √(m + q). It is approximate here: q is taken as the lesson's 167.6 at 230 days and grows with the square of the days. That is true only when the reporting days have the same average weather and the same share of weekdays as the lesson's 230 days, against the lesson's baseline year. The lower plot is the relative precision of both forms. At 100 percent the saving equals twice its standard uncertainty, which is the commonly used criterion for reporting. Which case the numbers show: the first button is Application 1 below, with 13,857 kWh, 414 and 828 kWh and 6.0 percent, and 544 and 1,089 kWh and 7.9 percent by the fuller form. Both forms assume independent daily errors. On real data autocorrelation makes both ranges wider, and a contract should use the formula of the current ASHRAE Guideline 14.

together: 10.2 percent hours: 10 percent power: 2 percent added: 12
bars: error of one day line: running total daily scatter:highs and lows cancel a coefficient too low:the error adds up

Check yourself

Three questions. Each wrong choice is a mistake people really make, so read the note after you answer.

1. Over 230 days the adjusted baseline is 120,871 kWh and the avoided energy is 13,857 kWh. The expanded uncertainty of the baseline model is 828 kWh. What is the relative precision of the saving?

2. On the same site, with the same model and the same 230 days, another measure saves 3 percent: 3,626 kWh. What is the relative precision of this saving by the simple form?

3. For the 230 days, the scatter of the days gives a standard uncertainty of 414 kWh and the uncertainty of the coefficients gives 353 kWh. The two are independent. What is the standard uncertainty of the saving?

Watch it build: the range of the site's saving
Avoided 13,857 kWhin 230 days 13,00014,00015,000 12,76814,946 13,02914,685 One day: the model is off byabout RMSE = 27.3 kWh 27.3 × √230 = 414 kWh = u± 2u = ± 828 kWh: 6.0 % 30 d 16.5 % 90 d 9.6 %230 d 6.0 % 365 d 4.7 % Intercept 2 kWh low × 230 days= 460 kWh, and it never cancels √(414² + 353²) = 544 kWh = u± 1,089 kWh: 7.9 %
  1. The saving, 13,857 kWh, rests on a model that is off by about 27.3 kWh on any one day.
  2. Over 230 independent days: u = 27.3 × √230 = 414 kWh. Range 13,029 to 14,685 kWh.
  3. The saving grows with m, its uncertainty with √m: 16.5 % after 30 days, 4.7 % after 365.
  4. A coefficient error repeats every day: an intercept 2 kWh low is 460 kWh over 230 days.
  5. Fuller form: the coefficient term 353 joins 414 by root sum of squares: u 544, range 12,768 to 14,946.