Skip to content
You Start with one site
Amounts in Start with one site
Control, Measurement & Energy · Course

Choosing a Maintenance Strategy

Lesson 6 of 10 28 min read
Found this useful?

One site changes every bearing at the yearly shutdown and still loses the conveyor twice a year. Another site repairs only what breaks, and on the night the mains fails its standby generator does not start, because nobody had tried it for eleven months. Both sites applied one rule to every machine, and each rule was right for some failures and wrong for the rest. A maintenance plan is a choice made failure mode by failure mode: what happens if it fails, can anything be done before it fails, and does that cost less than the failure. This lesson gives the logic of that choice and the two calculations that it needs most often. #MaintenanceStrategy #RCM #AgeReplacement

Learning Objectives

By the end of this lesson, you will be able to:

  1. Name the five ways of dealing with a failure mode and say when each is technically possible
  2. Apply a decision logic that starts from the consequence of the failure
  3. Calculate the cost per running hour of replacement at a fixed age and find the age that makes it lowest
  4. Compare age replacement with run to failure and with an on-condition task for the same item
  5. Set the interval of a failure-finding task from a hidden failure rate and a required availability

Real-World System Problem: One budget, five machines, many ways to fail



The cold store has two compressors, a borehole pump, a conveyor with a gearbox, and a standby generator. Each can fail in several ways, and the maintenance budget is one number. For each way of failing, the planner must decide whether to wait for it, replace the part before it, watch for it, or test for it.

The answer differs even inside one machine. A conveyor bearing wears out, and its failure stops the line at 12,000 currency units an hour. A control board on the same conveyor fails with no relation to its age, so a new board is no better than the old one. The generator can be dead for months and nobody knows, because nothing asks it to run.

A strategy chosen per machine (“the conveyor is on a yearly service”) cannot be right for all three. The unit of the decision is the failure mode.

Standby generatorControl boardConveyor bearingwears out, stops the linereplace at an age,or watch its conditionfails at any agea new board is nobetter: do not schedulefails unseen while it standstest it at an interval
The same site, three different kinds of failure

Fundamental Theory: Consequence first, then what is possible



Five things that can be done about a failure mode

There are only five answers, and every maintenance plan is a mixture of them.

StrategyWhat is doneIt can work when
Run to failureNothing until the failure, then repairThe failure is evident and its consequence is acceptable
Scheduled restoration or replacementOverhaul or replace at a fixed age, whatever the conditionThe chance of failure rises with age, and most items reach that age
On-condition taskInspect at an interval, act only when a fault is foundThe failure gives a warning with a long enough P-F interval
Failure-finding taskTest at an interval whether a hidden function still worksThe failure is hidden and a test can show it
RedesignChange the machine, the process or the procedureNo task is possible or good enough

Run to failure is a strategy, not neglect, provided it was chosen. A lamp in a corridor, a fan belt with a spare on the shelf, a board that fails at random: for these, waiting is the cheapest correct answer.

Redesign has a wide meaning here: a change to the hardware (a second pump, a larger bearing, a filter), to the way the machine is operated, or a spare kept on site.

Consequences come before tasks

The first question about a failure mode is not “what can we do” but “what happens if it occurs”. Reliability-centred maintenance, the method that came from the aircraft study of Nowlan and Heap, sorts consequences into four classes, and the class decides how good a task must be:

  • Hidden. The failure by itself is not noticed in normal operation. It matters only when a second failure occurs: the standby does not start when the duty machine stops. Protective devices and standby machines are the usual cases.
  • Safety or environment. The failure could hurt somebody or break an environmental limit.
  • Operational. The failure stops or slows production, or damages the stock. Its cost is the lost output plus the repair.
  • Non-operational. The failure costs only the repair.

For the last two classes the test of a task is money: over time it must cost less than the failures it prevents. For a safety or environmental consequence the test is not money: the task must reduce the risk to an acceptable level, and if no task can, the design must change.

Technically possible, and worth doing

A task must pass two tests. It must be technically possible: the failure must behave in a way the task can use. And it must be worth doing: it must deal with the consequence well enough.

Scheduled replacement is technically possible only when there is an age at which the chance of failure starts to rise quickly, and most items survive to it. For an item that fails at random it does nothing; for an item with early failures it makes things worse, because every new part must again pass through its weakest period.

An on-condition task is technically possible when the failure gives a clear sign, the P-F interval is fairly consistent, and the time that remains after the sign is found is long enough to act. The interval of the task comes from the P-F interval.

A failure-finding task is technically possible when a test can show the state of the hidden function without damaging it, and when the test can be done often enough to give the availability that is needed.

The decision logic

The chart below gives the order of the questions, summarised in this course’s own words. Published reliability-centred maintenance diagrams are longer, and ask the task questions separately for each consequence class.

Where more than one task is possible, an on-condition task is usually considered first: it leaves the item in service for almost its whole life and acts only on the items that need it. Scheduled replacement throws away the remaining life of every item that would have lasted longer.

The logic has two default answers that surprise people. For a failure with no safety consequence and no affordable task, the correct answer is run to failure. For a hidden failure, doing nothing is not allowed: the function must at least be tested.

Hidden failures and the failure-finding interval

A standby machine has a hidden failure mode: it fails while it stands, and the failure shows only when it is called, like a smoke alarm with a dead battery that is found only by the test button or the fire. Let be the rate of hidden failures (failures per year while standing by) and the interval between tests, in years.

Suppose each test finds any failure and a failed machine is repaired at once. A failure can occur at any moment between two tests, so on average it stays hidden for half an interval. The fraction of the time the machine is dead without anybody knowing is its unavailability .

Failure-finding interval

The relation holds when is small (below about 0.2), when each test finds every hidden failure, and when the repair time is short against .

testtesttesttesttimeworksworksX.... foundworksrepaireddead, and nobody knows(on average half an interval)
A hidden failure waits for the next test

The standby does not matter by itself; the multiple failure does: the demand comes while the standby is dead. If demands arrive at a year, the multiple failure occurs about times a year. The required availability of the standby should come from the rate of multiple failure the site can accept, not from a round number.

The two compressors of the cold store show a way to avoid the calculation. If duty and standby exchange roles every week, each is proved by a week of real work, and a failure of either is evident within a week: a failure-finding task with a short interval and no extra labour.

The economics of replacement at a fixed age

For an item that wears out, with an operational or non-operational consequence, the question is at what age to replace it. Age replacement: replace the item when it reaches age , or when it fails, whichever comes first. The age is counted in that item’s running hours and starts again at zero after every replacement.

Two costs are needed: , one planned replacement, and , one unplanned failure with the repair, the extra labour and the lost production. Age replacement can pay only when is larger than .

Each replacement starts a new cycle, which ends in a planned replacement with probability , the chance of surviving to age , and in a failure with probability . The mean length of a cycle is not , since some items fail earlier: it is the area under the survival curve up to .

Cost per running hour of age replacement

The top is the mean cost of one cycle and the bottom is its mean length. For a Weibull model, with shape and characteristic life .

A small wastes parts: almost every cycle ends in a planned replacement, and is paid very often. A large lets many items fail: as grows without limit the policy becomes run to failure, at divided by the mean life per hour. Between the two there may be a minimum.

costperhourrun to failuretoo early:too late:parts wastedfailures return●best ageage T
Cost per hour against replacement age

The integral has no simple formula for a Weibull model, so the minimum is found numerically: compute for many ages and take the lowest.

There is a minimum only when the hazard rate rises with age ( above 1) and the failure costs more than the planned replacement. With equal to 1 or below, the curve falls all the way to the run to failure line and never goes below it: no replacement age is better than waiting.

What the cost model leaves out

The model assumes a new part is as good as new and correctly fitted, the two costs are known, and the life model is right. None is exactly true. A replacement can introduce a fault (a bearing fitted with a hammer, a misaligned coupling): one more reason not to replace earlier than the calculation supports. And the life model comes from few failures, so the best age carries an uncertainty that Application 1 measures.

Application 1: Four ways to maintain the conveyor bearing



Step 1: The two costs

Click to reveal the costs
  1. Planned replacement. currency units. ✅

  2. Unplanned failure. currency units. ✅

  3. Ratio. . A failure costs almost ten times a planned change, and 60,000 of the 73,500 is the stopped conveyor. ✅

Step 2: Run to failure

Click to reveal the cost of waiting
  1. Mean life. For a Weibull model the mean life is .

    ✅

  2. Cost per running hour. Every cycle ends in a failure and lasts the mean life.

    ✅

  3. Cost a year. currency units a year for this one bearing position. ✅

Step 3: Replacement at a fixed age

Click to reveal the cost curve and its minimum
  1. One age by hand. Try h. The chance of surviving to that age is

    The area under the survival curve up to 6,000 h, from the script, is 5,778 h. ✅

  2. Cost per hour at 6,000 h.

    Less than half of the cost of run to failure. ✅

  3. Other ages. The script gives 4.07 at 2,000 h, 2.71 at 4,000 h, 2.63 at 5,000 h, 2.70 at 6,000 h, 3.05 at 8,000 h and 4.05 at 12,000 h. The curve falls, turns, and rises again. ✅

  4. The minimum. The numerical search gives a best replacement age of 4,942 h, with a cost of 2.63 currency units per hour, which is 22,100 a year. ✅

  5. What happens at that age. 7.9 percent of the bearings fail before they reach 4,942 h. The mean cycle is 4,825 h, so the site uses 1.74 bearings a year at this position and has 0.137 failures a year, about one in seven years. ✅

  6. Saving. Against run to failure the cost falls from 49,700 to 22,100 a year, a saving of 55.5 percent. ✅

  7. The present yearly change. Replacement at every 8,400 h costs 3.14 per hour, 19 percent above the best. One bearing in four fails before its yearly change. ✅

Step 4: The maker’s figures against the site’s twelve failures

Click to reveal how far the best age moves
  1. Best age with the site’s figures. With and h the best age is 4,370 h, at a cost of 3.29 per hour. ✅

  2. Movement of the best age. From 4,942 h to 4,370 h is 572 h earlier, a change of 12 percent. In calendar time it is about 3.4 weeks of running. ✅

  3. Cost of choosing the wrong one. If the maker’s figures are the true ones and the site replaces at 4,370 h, the cost is 2.66 per hour, which is 1.0 percent above the best. If the site’s figures are the true ones and it replaces at 4,942 h, the cost is 3.31, which is 0.8 percent above the best. ✅

  4. Why the penalty is small. The curve is flat near its minimum. With the maker’s figures, every age between 3,750 h and 6,490 h is within 5 percent of the best cost. ✅

  5. What does move. The predicted cost is 2.63 per hour with one set of figures and 3.29 with the other, a difference of 25 percent. The two sets agree on when to replace and disagree on what the year will cost. ✅

Step 5: The on-condition task

Click to reveal the cost of watching the bearing
  1. Cost of the checks. One check costs currency units and is made every 672 running hours: per hour. ✅

  2. Cost of the bearings. Each bearing runs for about its mean life of 12,411 h. Its end is a planned replacement with a chance of 0.9 and a failure with a chance of 0.1.

    ✅

  3. Total. per hour, which is 14,200 a year. ✅

  4. Sensitivity to the chance of detection. With a chance of 0.8 the cost is 2.23 per hour. The on-condition task costs the same as the best age replacement when the chance is 0.72. Below that, age replacement is cheaper. ✅

Step 6: Check a second way

Click to reveal the check
  1. A condition that the best age must satisfy. Setting the slope of to zero gives

    where is the hazard rate. The right side is . At 4,942 h the script gives 0.1136 for the left side. ✅

  2. A second reading of the same condition. At the best age the cost per hour equals the hazard rate times the extra cost of a failure: per hour. It agrees. ✅

  3. Simulation. The script draws 400,000 bearing lives from the maker’s model, replaces each at 4,942 h or at failure, and divides the total cost by the total hours: 2.633 per hour, with 7.9 percent failed first. ✅

  4. Limiting cases. With a cost ratio of 1.5 the best age is 17,753 h and the saving against run to failure is 1.1 percent. With the search ends at its upper limit and the saving is 0.0 percent: there is no best age. Both agree with the theory. ✅

Application 2: How often to test the standby generator



Step 1: The interval from the required availability

Click to reveal the interval
  1. Allowed unavailability. . ✅

  2. Interval.

    ✅

  3. Practical choice. A test every 4 weeks is inside the limit and easy to schedule. Its unavailability is , so the availability is 99.2 percent. ✅

Step 2: The multiple failure

Click to reveal how often the generator is dead when called
  1. Test every 4 weeks. The mains fails 6 times a year, and the generator is dead for 0.77 percent of the time: unmet demands a year, about one in 22 years. ✅

  2. Test once a year. . One call in ten finds a dead generator: unmet demands a year, about three in every five years. ✅

  3. Test every week. percent and 0.012 unmet demands a year, one in 87 years. The weekly test is four times the work of the 4 week test for a gain that the requirement did not ask for. ✅

Step 3: Check the relation and state its limits

Click to reveal the check
  1. The exact mean unavailability for a constant hidden failure rate and a perfect test is

    At 5.2 weeks it gives 0.99 percent against 1.00 percent from the simple relation. At 52 weeks it gives 9.37 percent against 10.00 percent. The simple relation is close for short intervals and a little pessimistic for long ones. ✅

  2. Repair time. If a failed test is followed by 48 hours of repair, the generator is also unavailable during repairs: percent more. With a test every 4 weeks the total is 0.88 percent, still inside 1 percent. ✅

  3. An uncertain failure rate. The rate of 0.2 a year would come from one or two events in the life of one generator. If the true rate is 0.4 a year, the interval for 99 percent is 2.6 weeks, and the 4 week test gives 98.5 percent. ✅

  4. What a test must be. The relation assumes that the test finds every hidden failure. A start with no load proves the battery and the starter. It does not prove that the generator can take the load or that the changeover works. ✅

Verify It in Python



The script computes the cost per running hour of the bearing for run to failure, age replacement and the on-condition task, with the maker’s figures and with the site’s, checks the minimum by its condition and by simulation, and then computes the failure-finding interval of the generator. It saves one plot of the cost against the replacement age.

maintenance_strategy.py
"""Age replacement, run to failure and on-condition cost for a bearing,
and the failure-finding interval of a standby generator."""
import numpy as np
from scipy.integrate import quad
from scipy.optimize import minimize_scalar
from scipy.special import gamma
import matplotlib.pyplot as plt
TECH = 1500.0 # one technician hour
BEARING = 4500.0 # one bearing
DOWN = 12000.0 # one hour of conveyor downtime
CP = BEARING + 2 * TECH # planned replacement
CF = BEARING + 6 * TECH + 5 * DOWN # unplanned failure
YEAR = 8400.0 # running hours a year
def R(t, beta, eta):
return np.exp(-(t / eta) ** beta)
def mean_life(beta, eta):
return eta * gamma(1.0 + 1.0 / beta)
def cycle_length(T, beta, eta):
"""Mean running hours of one bearing when it is replaced at age T or at failure."""
return quad(R, 0.0, T, args=(beta, eta))[0]
def cost_rate(T, beta, eta, cp=CP, cf=CF):
"""Mean cost per running hour of replacement at age T."""
r = R(T, beta, eta)
return (cp * r + cf * (1.0 - r)) / cycle_length(T, beta, eta)
def best_age(beta, eta, cp=CP, cf=CF):
"""Age with the lowest cost per hour: a coarse search, then a fine one."""
grid = eta * np.linspace(0.02, 10.0, 500)
k = int(np.argmin([cost_rate(T, beta, eta, cp, cf) for T in grid]))
lo, hi = grid[max(k - 1, 0)], grid[min(k + 1, grid.size - 1)]
res = minimize_scalar(cost_rate, bounds=(lo, hi), args=(beta, eta, cp, cf),
method="bounded", options={"xatol": 0.01})
return res.x, res.fun
print(f"Costs: planned {CP:.0f}, unplanned {CF:.0f}, ratio {CF / CP:.1f}")
MAKER = (2.4, 14000.0)
SITE = (2.13, 12750.0)
print("Application 1: conveyor bearing")
for name, (beta, eta) in (("maker's figures", MAKER), ("site's 12 failures", SITE)):
m = mean_life(beta, eta)
rtf = CF / m
T, c = best_age(beta, eta)
F = 1.0 - R(T, beta, eta)
L = cycle_length(T, beta, eta)
print(f" {name}: beta {beta}, eta {eta:.0f} h")
print(f" mean life {m:.0f} h, run to failure {rtf:.3f} per hour, "
f"{rtf * YEAR:.0f} a year")
print(f" best replacement age {T:.0f} h, cost {c:.3f} per hour, "
f"{c * YEAR:.0f} a year")
print(f" at that age: {100 * F:.1f} % fail first, mean cycle {L:.0f} h, "
f"{YEAR / L:.2f} bearings a year, {YEAR / L * F:.3f} failures a year")
beta, eta = MAKER
T_m, c_m = best_age(*MAKER)
T_s, c_s = best_age(*SITE)
print(" cost per hour at chosen ages, maker's figures taken as true:")
for T in (2000.0, 3000.0, 4000.0, T_s, T_m, 5000.0, 6000.0, 8000.0, 8400.0, 12000.0):
c = cost_rate(T, beta, eta)
print(f" {T:6.0f} h: survive {R(T, beta, eta):.4f}, mean cycle "
f"{cycle_length(T, beta, eta):5.0f} h, cost {c:.3f} "
f"({100 * (c / c_m - 1):+.1f} % against the best)")
print(f" ages within 5 % of the best cost: "
f"{min(T for T in np.arange(1000, 12000, 10.0) if cost_rate(T, beta, eta) < 1.05 * c_m):.0f}"
f" to "
f"{max(T for T in np.arange(1000, 12000, 10.0) if cost_rate(T, beta, eta) < 1.05 * c_m):.0f} h")
# the same two ages if the site's figures were the true ones
c_ms = cost_rate(T_m, *SITE)
print(f" site's figures taken as true: {T_m:.0f} h costs {c_ms:.3f}, "
f"{100 * (c_ms / c_s - 1):+.1f} % against their best of {c_s:.3f}")
# the condition at the minimum: h(T) * integral of R - F(T) = CP / (CF - CP)
h = beta / eta * (T_m / eta) ** (beta - 1.0)
lhs = h * cycle_length(T_m, beta, eta) - (1.0 - R(T_m, beta, eta))
print(f" condition at the minimum: left side {lhs:.4f}, right side {CP / (CF - CP):.4f}; "
f"hazard rate there {h * 1e6:.1f} per million hours, times (CF - CP) = "
f"{h * (CF - CP):.3f} per hour")
# check by simulation: many bearings in a row, replaced at the best age or at failure
rng = np.random.default_rng(6)
life = eta * rng.weibull(beta, 400000)
planned = life > T_m
hours = np.where(planned, T_m, life).sum()
cost = np.where(planned, CP, CF).sum()
print(f" simulation of 400000 bearings at {T_m:.0f} h: {cost / hours:.3f} per hour, "
f"{100 * (1 - planned.mean()):.1f} % failed first")
# on-condition: vibration check every 4 weeks (672 h), 0.25 technician hour each
CHECK = 0.25 * TECH
INTERVAL = 672.0
m = mean_life(beta, eta)
print(f" on-condition, check {CHECK:.0f} every {INTERVAL:.0f} h "
f"({CHECK / INTERVAL:.3f} per hour for the checks):")
for p in (0.9, 0.8, 0.6, 0.4):
c = CHECK / INTERVAL + (p * CP + (1 - p) * CF) / m
print(f" fault found in time with chance {p:.1f}: {c:.3f} per hour, "
f"{c * YEAR:.0f} a year")
p_even = (CHECK / INTERVAL + CF / m - c_m) / ((CF - CP) / m)
print(f" equal to the best age replacement when the chance is {p_even:.2f}")
# when does age replacement stop paying? smaller cost ratios and smaller shapes
print(" best age for other cost ratios (maker's figures):")
for ratio in (9.8, 5.0, 3.0, 2.0, 1.5):
T, c = best_age(beta, eta, CP, ratio * CP)
rtf = ratio * CP / m
print(f" ratio {ratio:3.1f}: best age {T:6.0f} h, saving against run to failure "
f"{round(100 * (1 - c / rtf), 1) + 0.0:.1f} %")
print(" best age for other shapes (eta 14000 h, the lesson's costs):")
for b in (3.5, 2.4, 1.5, 1.2, 1.0):
T, c = best_age(b, eta)
rtf = CF / mean_life(b, eta)
print(f" beta {b:3.1f}: best age {T:6.0f} h, saving against run to failure "
f"{round(100 * (1 - c / rtf), 1) + 0.0:.1f} %")
# ---------- Application 2: standby generator ----------
print("Application 2: standby generator, hidden failure")
LAM = 0.2 # hidden failures a year
TARGET = 0.99 # required availability on demand
DEMANDS = 6.0 # mains failures a year
T_ff = 2.0 * (1.0 - TARGET) / LAM
print(f" interval from U = lambda T / 2: {T_ff:.3f} years = {T_ff * 52:.1f} weeks")
for label, T in (("5.2 weeks", T_ff), ("4 weeks", 4 / 52), ("1 week", 1 / 52),
("26 weeks", 0.5), ("52 weeks", 1.0)):
approx = LAM * T / 2.0
exact = 1.0 - (1.0 - np.exp(-LAM * T)) / (LAM * T)
print(f" test every {label}: unavailability {100 * approx:.2f} % "
f"(exact {100 * exact:.2f} %), demands not met {DEMANDS * approx:.3f} a year, "
f"one in {1 / (DEMANDS * approx):.0f} years")
repair = 48.0 / 8760.0 # two days to repair a fault that a test finds
T4 = 4 / 52
print(f" with 48 h of repair after each failed test, test every 4 weeks: "
f"{100 * (LAM * T4 / 2 + LAM * repair):.2f} %")
T_two = 2.0 * (1.0 - TARGET) / (2 * LAM)
print(f" if the hidden failure rate is 0.4 a year: interval {T_two * 52:.1f} weeks")
# ---------- Plot ----------
ages = np.linspace(1000.0, 16000.0, 151)
fig, ax = plt.subplots(figsize=(8, 5))
for name, (b, e) in (("maker's figures", MAKER), ("site's 12 failures", SITE)):
ax.plot(ages, [cost_rate(T, b, e) for T in ages], label=f"age replacement, {name}")
ax.axhline(CF / mean_life(b, e), linewidth=0.8, linestyle="--", color="gray")
ax.plot([T_m, T_s], [c_m, c_s], "o", color="black")
ax.set_xlabel("replacement age (running hours)")
ax.set_ylabel("cost per running hour (currency units)")
ax.set_title("Conveyor bearing: cost against replacement age")
ax.set_ylim(0, 8)
ax.legend()
fig.tight_layout()
fig.savefig("maintenance_strategy.png", dpi=120)
print("Saved maintenance_strategy.png")

Expected output

Costs: planned 7500, unplanned 73500, ratio 9.8
Application 1: conveyor bearing
maker's figures: beta 2.4, eta 14000 h
mean life 12411 h, run to failure 5.922 per hour, 49747 a year
best replacement age 4942 h, cost 2.633 per hour, 22118 a year
at that age: 7.9 % fail first, mean cycle 4825 h, 1.74 bearings a year, 0.137 failures a year
site's 12 failures: beta 2.13, eta 12750 h
mean life 11292 h, run to failure 6.509 per hour, 54677 a year
best replacement age 4370 h, cost 3.288 per hour, 27618 a year
at that age: 9.7 % fail first, mean cycle 4231 h, 1.99 bearings a year, 0.193 failures a year
cost per hour at chosen ages, maker's figures taken as true:
2000 h: survive 0.9907, mean cycle 1995 h, cost 4.069 (+54.5 % against the best)
3000 h: survive 0.9755, mean cycle 2978 h, cost 3.061 (+16.2 % against the best)
4000 h: survive 0.9517, mean cycle 3943 h, cost 2.710 (+2.9 % against the best)
4370 h: survive 0.9407, mean cycle 4293 h, cost 2.659 (+1.0 % against the best)
4942 h: survive 0.9211, mean cycle 4825 h, cost 2.633 (+0.0 % against the best)
5000 h: survive 0.9190, mean cycle 4879 h, cost 2.633 (+0.0 % against the best)
6000 h: survive 0.8773, mean cycle 5778 h, cost 2.699 (+2.5 % against the best)
8000 h: survive 0.7702, mean cycle 7430 h, cost 3.050 (+15.8 % against the best)
8400 h: survive 0.7457, mean cycle 7733 h, cost 3.140 (+19.3 % against the best)
12000 h: survive 0.5012, mean cycle 9985 h, cost 4.048 (+53.7 % against the best)
ages within 5 % of the best cost: 3750 to 6490 h
site's figures taken as true: 4942 h costs 3.314, +0.8 % against their best of 3.288
condition at the minimum: left side 0.1136, right side 0.1136; hazard rate there 39.9 per million hours, times (CF - CP) = 2.633 per hour
simulation of 400000 bearings at 4942 h: 2.633 per hour, 7.9 % failed first
on-condition, check 375 every 672 h (0.558 per hour for the checks):
fault found in time with chance 0.9: 1.694 per hour, 14231 a year
fault found in time with chance 0.8: 2.226 per hour, 18698 a year
fault found in time with chance 0.6: 3.290 per hour, 27632 a year
fault found in time with chance 0.4: 4.353 per hour, 36566 a year
equal to the best age replacement when the chance is 0.72
best age for other cost ratios (maker's figures):
ratio 9.8: best age 4942 h, saving against run to failure 55.5 %
ratio 5.0: best age 6905 h, saving against run to failure 36.7 %
ratio 3.0: best age 9319 h, saving against run to failure 19.8 %
ratio 2.0: best age 12720 h, saving against run to failure 7.0 %
ratio 1.5: best age 17753 h, saving against run to failure 1.1 %
best age for other shapes (eta 14000 h, the lesson's costs):
beta 3.5: best age 5797 h, saving against run to failure 68.8 %
beta 2.4: best age 4942 h, saving against run to failure 55.5 %
beta 1.5: best age 5378 h, saving against run to failure 24.6 %
beta 1.2: best age 9814 h, saving against run to failure 5.6 %
beta 1.0: best age 140000 h, saving against run to failure 0.0 %
Application 2: standby generator, hidden failure
interval from U = lambda T / 2: 0.100 years = 5.2 weeks
test every 5.2 weeks: unavailability 1.00 % (exact 0.99 %), demands not met 0.060 a year, one in 17 years
test every 4 weeks: unavailability 0.77 % (exact 0.77 %), demands not met 0.046 a year, one in 22 years
test every 1 week: unavailability 0.19 % (exact 0.19 %), demands not met 0.012 a year, one in 87 years
test every 26 weeks: unavailability 5.00 % (exact 4.84 %), demands not met 0.300 a year, one in 3 years
test every 52 weeks: unavailability 10.00 % (exact 9.37 %), demands not met 0.600 a year, one in 2 years
with 48 h of repair after each failed test, test every 4 weeks: 0.88 %
if the hidden failure rate is 0.4 a year: interval 2.6 weeks
Saved maintenance_strategy.png

Common Mistakes



  • Choosing one strategy for a whole machine. The choice is made for each failure mode, and one machine usually needs several strategies.
  • Scheduling replacement of an item that fails at random or early. The new part is no better, and it can be worse. Check that the shape is above 1 before any age is calculated.
  • Replacing at the mean life or at the MTBF. The best age for the bearing was 4,942 h against a mean life of 12,411 h.
  • Treating run to failure as neglect. For an evident failure with a small consequence and no affordable task it is the correct, chosen answer.
  • Leaving a standby machine or a protective device untested because it has never failed in service. Its failures are hidden, and only a test at a calculated interval shows them.
  • Presenting the predicted cost as a promise. The best age was stable between the two sets of figures, and the predicted cost differed by 25 percent.

Summary



  • There are five answers to a failure mode: run to failure, scheduled restoration or replacement, an on-condition task, a failure-finding task, and redesign.
  • The consequence decides how good a task must be. For a hidden failure something must be done, at least a test. For a safety or environmental consequence the task must make the risk acceptable or the design must change. For the rest, a task must cost less than the failures it prevents.
  • The cost per hour of age replacement is the mean cost of a cycle divided by its mean length. It has a minimum only for a wear-out item whose failure costs more than its planned replacement.
  • For the conveyor bearing the best age is 4,942 h at 2.63 per hour, against 5.92 for run to failure and 1.69 for an on-condition task that finds nine faults in ten. The site’s own figures move the best age by 12 percent and the cost at that age by 1 percent.
  • The interval of a failure-finding task follows from . For the generator, 99 percent availability with 0.2 hidden failures a year needs a test every 5.2 weeks or less.

Exercises



1. A gearbox seal costs 9,000 currency units. A planned change takes 3 technician hours at 1,500 an hour with no lost production. An unplanned failure takes 8 technician hours and stops the conveyor for 4 hours at 12,000 an hour. Find the two costs and their ratio.

Answer

. . The ratio is 5.1.

2. A conveyor belt has a Weibull life with and h. A failure costs 60,000 currency units. Find the cost per running hour of run to failure, and the cost in a year of 8,400 hours. Use .

Answer

The mean life is h. The cost is per hour, which is 56,400 a year.

3. For the belt of exercise 2, a planned replacement costs 20,000. The area under the survival curve up to 6,000 h is 5,695 h. Find the cost per hour of replacement at 6,000 h and the saving against run to failure.

Answer

. per hour, a saving of 27 percent. A numerical search gives the best age as 6,365 h at 4.86 per hour, so 6,000 h is very close to the best. Note that the cost ratio here is only 3, and the saving is much smaller than for the bearing.

4. A fire pump stands by and has a hidden failure rate of 0.5 a year. It must be available 97 percent of the time. (a) Find the failure-finding interval in weeks. (b) The pump is in fact tested every 8 weeks, and it is called 4 times a year. Find its unavailability and the rate of unmet demands. (c) What must be said about this example before the result is used?

Answer

(a) year, which is 6.2 weeks. (b) , so 3.8 percent, and unmet demands a year, about one in 6.5 years. (c) A fire pump protects people. Its required availability must come from a proper safety assessment and the applicable fire rules, not from a cost argument or from this simple relation alone.

5. For the conveyor bearing of Application 1, a different on-condition task costs 500 currency units a check, every 336 running hours, and finds a fault in time with a chance of 0.85. Find its cost per hour and compare it with the best age replacement at 2.63 per hour.

Answer

Checks: per hour. Bearings: per hour. Total 2.89 per hour, which is more than 2.63. This task is technically possible and still not worth doing: the checks themselves cost too much.

6. Choose a strategy for each failure mode and give the reason. (a) A compressor contactor that fails at random, with a standby compressor that takes the load and a spare contactor in the store. (b) The low-oil-pressure trip of a compressor, which acts only if the oil pressure is lost. (c) A drive belt that wears out, on a fan whose stop costs only the belt and the repair, with a planned change costing almost the same as an unplanned one.

Answer

(a) Run to failure: the failure is evident, age does not matter, so scheduled replacement cannot help, and the consequence is small because the standby takes over. (b) A failure-finding task: the trip is a protective device with a hidden failure, so it must be tested at an interval set from its failure rate and the availability required. (c) Run to failure, or replacement when convenient: the item wears out, but with the two costs almost equal the cost curve has no useful minimum.

References



  • J. Moubray, Reliability-centred Maintenance (RCM II), 2nd edition, Butterworth-Heinemann, 1997.
  • F. S. Nowlan and H. F. Heap, Reliability-Centered Maintenance, United Airlines report for the US Department of Defense, 1978.
  • A. K. S. Jardine and A. H. C. Tsang, Maintenance, Replacement, and Reliability: Theory and Applications, 2nd edition, CRC Press, 2013.
  • P. D. T. O’Connor and A. Kleyner, Practical Reliability Engineering, 5th edition, Wiley, 2012.


© 2021-2026 SiliconWit®. All rights reserved.
Watch it build: the cost of one cycle
age R(t) replace at T 4,942 h R(t): the chance a bearing still runs replace at T, or at failure if that comes first planned replacement: 7,500 failure: 73,500, almost ten times as much 4,825 h 8 % fail first cycle cost 12,706 ÷ mean cycle 4,825 h = 2.63 per running hour
  1. The survival curve of the conveyor bearing. Each bearing is replaced at age T or at failure.
  2. Two costs: 7,500 for a planned replacement and 73,500 for a failure.
  3. 92 % of cycles end planned, 8 % in failure. 12,706 a cycle over a mean 4,825 h: 2.63 per hour.
Predict first

A conveyor bearing wears out. Its mean life is about 12,400 running hours. A failure in service costs about ten times as much as a planned change. At what age is it cheapest to change the bearing?

See it: the cheapest age to replace

Best replacement age
Cost at the best age
Run to failure
Saving against run to failure
The age you try
Ages within 5 percent of the best cost

The curve is the cost per running hour of the lesson's conveyor bearing when it is changed at a fixed age, or at failure if that comes first. All costs are in currency units, and a year is 8,400 running hours. At the start the figure has the lesson's values: a planned change of 7,500, a failure of 73,500, and the maker's figures β = 2.4 and η = 14,000 h. The second button puts in the line fitted to the site's own twelve failures, β = 2.13 and η = 12,750 h. The horizontal line is run to failure, which the curve approaches at great ages. The thick mark on the age axis shows the ages that cost no more than 5 percent above the best: the curve is flat near its lowest point, so the exact age matters little. Lower the cost of a failure toward the cost of a planned change, or lower β toward 1, and watch the lowest point move to the right and disappear. The model takes a new part as correctly fitted and as good as new, and it gives averages over many bearings.

hiddensafetyoperationalrepair only test itat an intervalmake the riskacceptablecheaper thanthe lost output?cheaper thanthe repair? money is the test only in the last two
test button battery dead testtesttesttest dead, nobody knows T = 2U / λ

Check yourself

Three questions. Each wrong choice is a mistake people really make, so read the note after you answer.

1. A planned change costs 10,000 currency units and a failure costs 50,000. With replacement at 4,000 h, 90 percent of the parts reach that age, and the area under the survival curve up to 4,000 h is 3,800 h. What is the cost per running hour?

2. A control board fails at random: its life has β = 1. A failure costs ten times a planned change. What is the best age for a planned change?

3. For the conveyor bearing (β = 2.4, η = 14,000 h) the best age is 4,942 h when a failure costs 9.8 times a planned change. The downtime is removed by a design change, and a failure now costs only 2 times a planned change. What happens to the best age?

part how it fails what follows Conveyor bearing wears out, stops the line replace at an age, or watch its condition Control board fails at any age a new board is no better: do not schedule Standby generator fails unseen while it stands test it at an interval
The same site, three different kinds of failure
weeks test 0 works test 4 works test 8 found test 12 works fails repaired dead, and nobody knows (on average half an interval) failure at week 5 is an example
A hidden failure waits for the next test
Found this useful?

Discussion