Your trip to work takes between 25 and 35 minutes. On the day it takes 50, you know that something happened on the road, and nobody has to tell you. A control chart gives a machine the same sense. It is a plot of readings with two limit lines, worked out from the readings themselves, that separate ordinary variation from a real change.

It is under the 7.5 bar limitThat limit says what the process needs.Silent until it is late
It is higher than yesterdayEvery day is higher or lower than the day before.Calls someone every day
It is outside what this pump doesLimits taken from its own normal readings.This is a control chart

See it

Predict first

The discharge pressure of a pump has read between 6.0 bar and 6.5 bar every day for weeks. The process is safe up to 7.5 bar. One morning the reading is 7.0 bar. Is this worth a visit?

See it: twenty days of pump pressure, with limits from the first ten

Centre line
Control limits
First day beyond a limit

Days 1 to 10 are a normal period, and the centre line and the two control limits come from those ten readings only. The slider adds a steady rise each day from day 11, as a slowly blocking filter would. The button replaces the control limits with the specification of the process, 5.5 bar to 7.5 bar.

The idea

Every reading moves a little from many small causes. This is common cause variation, and it needs no action. A special cause is something that was not there before: a blocked filter, a tripped compressor, a changed setting.

The chart has a centre line at the mean of a normal period, and two control limits three standard deviations either side of it. With one reading a day, the spread is taken from the moving range: the difference between each reading and the one before it.

limits = mean ± 2.66 × mean moving range

both taken from the normal period. 2.66 mean moving ranges equal three standard deviations

A point beyond a limit is a signal to look for a cause, not proof. A process with nothing wrong still puts about 1 point in 370 outside. Across 50 daily charts that is about one false alarm a week, so set the limits for the whole site, not one chart at a time. The limits also assume that each reading is independent of the one before, so chart daily means, not readings taken every minute.

One worked number

The question

A pump pressure is read once a day for ten normal days, in bar: 6.2, 6.4, 6.1, 6.3, 6.5, 6.2, 6.0, 6.3, 6.4, 6.1. Where are the centre line and the control limits?

Show the worked solution, 3 steps
  1. Find the centre line

    The readings add to 62.5. Mean = 62.5 ÷ 10 = 6.25 bar.

  2. Find the mean moving range

    The nine differences between neighbours are 0.2, 0.3, 0.2, 0.2, 0.3, 0.2, 0.3, 0.1 and 0.3. They add to 2.1, so the mean is 2.1 ÷ 9 = 0.233 bar.

  3. Place the limits

    2.66 × 0.233 = 0.62 bar. The limits are 6.25 − 0.62 = 5.63 bar and 6.25 + 0.62 = 6.87 bar. The figure opens with these lines.

The mistake to avoid

The specification is not a control limit. A specification says what the process needs. A control limit says what this machine normally does. Drawn on the chart, the specification stays silent while the machine changes. In the figure, a drift of 0.10 bar a day passes the control limit on day 17 and never reaches the specification.

A second trap: limits worked out from days that contain the fault. The fault widens the limits and hides itself. Take the limits from a normal period and keep them fixed.

Check yourself

Question 1

The daily temperature of a bearing has a centre line of 50.0 °C and a mean moving range of 1.5 °C. Where are the control limits?

Question 2

A vaccine room must stay between 2 °C and 8 °C. Its daily mean has stayed between 3.9 °C and 4.1 °C for months. Today the daily mean is 4.6 °C. What does a control chart say?

Question 3

A stable process is charted once a day for three years, about 1,100 points. Three points are beyond the limits, and no cause was found for any of them. What is the most likely reason?

Where you meet it

  • A cold roomThe daily mean temperature is so steady that a compressor stopped for half an hour shows on the chart the next morning.
  • A building's energyThe chart is drawn on the gap between the meter and a baseline, so that the weather does not raise the alarm.
  • A borehole pumpA pressure or a current that leaves its limits points to wear or a blockage before the pump stops.
Key points
  • Ordinary variation needs no action. A control chart shows when a reading is outside it.
  • Limits = mean ± 2.66 × mean moving range, from a normal period of the machine's own readings.
  • A specification is not a control limit, and the limits are not recalculated every week.
  • A point beyond a limit is a reason to look. About 1 in 370 is chance.