Ideal current transformer
Current Transformers and Energy Metering
On this page
A new control strategy is fitted to a compressor, and the energy meter shows 3 percent less energy the next month. The owner asks whether the saving is real, and nobody can answer, because nobody knows what the meter and its current transformers are worth. On another site a meter has shown one third of the true energy for a year, because one transformer was fitted facing the wrong direction. This lesson explains how a current transformer works, what its class and its burden mean, and why its secondary must never be open. You will check the burden of a real installation and state the uncertainty of the energy it measures. #CurrentTransformer #EnergyMetering #Instrumentation
Learning Objectives
By the end of this lesson, you will be able to:
- Calculate the secondary current of a current transformer and the burden that the leads and the meter place on it
- Find the longest lead that keeps the burden within the rated value
- Explain why the secondary of a current transformer must never be open while the primary carries current
- Compare solid-core transformers, split-core transformers and Rogowski coils for a given task
- Combine the class limits of the transformer and the meter into an expanded uncertainty of the energy, at full load and at low load
Real-World System Problem: Metering the energy of a compressor feeder
A refrigeration compressor is supplied by a three-phase feeder (the cable and the protective device that carry power from the switchboard to this one machine) and draws 62 A in each phase when it runs. The owner wants to know the energy it uses each day, and later wants to show that a change of settings has saved energy. An energy meter cannot carry 62 A through its own terminals, and nobody wants the full feeder current brought to the door of a panel. A current transformer on each phase conductor gives the meter a small copy of the current: 5 A in the secondary for 100 A in the primary.
The energy figure now passes through three things, and each can spoil it. The transformer has a class, which limits its error only when its load is within the rated burden. The leads to the meter are part of that burden. The meter has its own class. A fourth thing, the way the transformer is fitted, can spoil the figure far more than any class: a transformer facing the wrong way makes its phase count backwards.
Two questions decide whether the daily energy can be trusted. Is the transformer working inside its rated burden, so that its class applies? And what is the uncertainty of the energy when the limits of the transformer and of the meter act together?
Fundamental Theory: Current transformers, burden and class
The words error, limit and uncertainty have the meanings of the international vocabulary (VIM, JCGM 200:2012), as in the rest of this course.
What a current transformer does
A current transformer is a ring of magnetic steel with a winding of many turns on it. The conductor whose current is to be measured passes once through the ring. That conductor is the primary, and the winding is the secondary. The secondary is closed through the meter, so a current flows in it.
The current in the secondary creates a magnetic effect that opposes the effect of the primary current. The two almost cancel. In turns and amperes:
The ratio is written as two currents, 100 A : 5 A, and not as the number 20, because the two currents are also the rated values. Rated secondary currents are 5 A or 1 A. The meter must be told the ratio. It measures the secondary current and multiplies by
A current transformer behaves as a source of current. Within its limits it sends the same secondary current through a short lead or a long one, which is why long leads are possible at all. The next two sections give the limits.
Ratio error and class
The cancelling of the two magnetic effects is never complete. A small part of the primary current is used to magnetise the core, and that part does not appear in the secondary. The secondary current is therefore a little smaller than the ideal value, and it is also shifted slightly in time.
Ratio error
The class of a measuring current transformer is the limit of its ratio error, in percent, at rated current. A class 1 transformer has a ratio error within ±1 percent at rated primary current. This is a percent of reading, not a percent of span.
The limit is not the same at every current. At low current the magnetising part is a larger share of the whole, so the standard allows a larger error. For class 1 the limit is ±3 percent at 5 percent of rated current, and below 5 percent there is no stated limit at all. The full table of limits is in IEC 61869-2; read it, or the maker’s test sheet, before you rely on a transformer at low current.
Burden
The secondary current must be driven through everything connected to the secondary terminals: the two leads and the current input of the meter. Together these are the burden. To drive a current
The maker states the largest burden for which the class holds. It is stated as an apparent power in volt-amperes (VA) at the rated secondary current.
Burden
A rated burden of 2.5 VA at 5 A is the same statement as a largest resistance of
The burden is why the rated secondary current matters. The same lead takes 25 times more volt-amperes at 5 A than at 1 A, because the power in a resistance rises with the square of the current. Where the meter is far from the transformer, a 1 A secondary is the usual choice.
Why the secondary must never be open
In normal work the secondary current cancels almost all of the magnetic effect of the primary current, as two people pushing a door from opposite sides keep it still, so the flux in the core is small. Suppose a lead is taken off a terminal while the compressor runs. The secondary current stops, but the primary current does not: the compressor sets it, not the transformer. Nothing cancels its magnetic effect, and the whole primary current drives the core hard into saturation in each half cycle. Each time the current passes through zero the flux reverses very quickly, and a fast change of flux in a winding of many turns gives a high voltage.
Some small transformers for monitoring have a resistor built in across the secondary and give a low voltage (for example 0.333 V at rated current) in place of a current. The built-in resistor keeps the secondary closed, so the open-secondary hazard is removed. They work only with a meter made for a voltage input. Read the label before you assume which kind you have.
Solid-core, split-core and Rogowski
A solid-core transformer is a closed ring. The conductor must be disconnected and passed through it, so it is fitted when the panel is built or during a planned shutdown. The closed ring has no air gap, the magnetising current is small, and the error is small. Meters used for billing use solid-core transformers.
A split-core transformer opens so that it can be closed round a conductor that stays connected. The faces where the core joins leave a small gap, which needs more magnetising current. For the same price it has a larger error than a solid-core one, mostly at low current, and tolerates less burden. Dirt on the faces or a clip not fully closed makes the error much larger.
A Rogowski coil is a flexible coil with no steel core, closed round the conductor like a belt. Its output is a small voltage in proportion to the rate of change of the current, so the meter must integrate it. It has no core to saturate, measures from a few amperes to thousands with one coil, fits round large busbars (the bare copper bars that carry the current inside a switchboard), and has no open-secondary hazard. Its weak points: a lower accuracy that depends on where the conductor sits inside the loop, a small signal that picks up noise at low current, and the need for a meter or an integrator made for it.
Direction and phase
A current transformer has a direction. The primary side is marked P1 and P2 (or K and L, or an arrow), and the secondary terminals are marked S1 and S2. The side P1 faces the supply, the load is on the side of P2, and S1 goes to the terminal of the meter that is marked for it. Each transformer goes round one phase conductor only, never round a whole cable: in a cable the phase currents and their return cancel, and a transformer round all of them reads almost zero.
A meter calculates the power of one phase as voltage times current times the cosine of the angle between them. A transformer facing the wrong way, or with S1 and S2 exchanged, turns the current upside down (a shift of 180 degrees), and the cosine changes sign: the meter counts that phase as power flowing back to the supply. On a balanced three-phase load with one of three transformers reversed, the total is
The second fault of the same family is a transformer on one phase paired with the voltage of another phase. The angle is then wrong by 120 degrees. Both faults are found by one check after fitting: with the load running, the meter must show a positive power in every phase and a power factor in each phase that is believable for the machine.
A current transformer also has a small phase displacement: the secondary current is shifted in time against the primary current by a small angle
Meter class and the combined uncertainty
The energy meter has a class of its own. A class 1 meter to IEC 62053-21 has an error within ±1 percent of reading over its stated range of current and power factor. Outside that range, at very low current or at low power factor, the standard allows more, and the datasheet says how much.
The energy is the product of what the meter measures and the ratio of the transformer. For a product, the relative uncertainties combine, and each sensitivity coefficient is 1. Both class figures are limits with no other information, so each is a Type B evaluation with a rectangular distribution, as in uncertainty budgets.
Energy from a transformer and a meter
Application 1: Secondary current, burden and the longest lead
Step 1: The secondary current
Click to reveal the secondary current
-
Rated ratio.
This is the number that is entered in the meter. ✅
-
Secondary current at 62 A.
The meter receives 3.10 A, which is 62 percent of its rated 5 A. ✅
Step 2: The burden of the leads and the meter
The burden is checked at the rated secondary current, 5 A, not at today’s 3.10 A, for two reasons. The maker states the rated burden at rated current, and the meter’s 0.2 VA is stated at 5 A too, so only values at 5 A can be compared. And the transformer must keep its class up to its rated current, which the feeder can reach during a start or after a change of load.
Click to reveal the burden
-
Resistance of the leads. The current flows 4 m out and 4 m back, so the length is 8 m.
✅
-
Burden of the leads at 5 A.
✅
-
Total burden.
The leads take seven times more than the meter. ✅
-
Compare with the rated burden.
The burden is within the rated value, so the class 1 limit applies. ✅
Step 3: The longest lead
Click to reveal the longest lead
-
Burden left for the leads.
. ✅ -
Largest lead resistance.
✅
-
Longest lead. The total length of wire is
, and half of it is the distance one way. With 2.5 mm² copper the meter can be at most 6.57 m of cable route from the transformer. ✅
-
Check a second way, by resistance. The rated burden is a largest resistance of
. The meter is and the leads are , so the total is : 64 percent of , the same share as in Step 2. The resistance left for the leads is , as in this step. ✅ -
What happens at 62 A. At 3.10 A the burden in volt-amperes is
, and the voltage at the secondary terminals is . Do not compare 0.615 VA with 2.5 VA. The share of the rated burden is still 64 percent, because the resistance has not changed. The Python script prints the same values. ✅
Application 2: Uncertainty of the energy at full load and at low load
Step 1: Full load
Click to reveal the budget at 62 A
-
Standard uncertainties. Both limits are ±1 percent of reading, rectangular.
✅
-
The budget. The energy is in proportion to both, so each sensitivity coefficient is 1 when everything is in percent of reading.
Source Value (limit) Distribution Divisor Standard uncertainty Sensitivity coefficient Contribution (% of energy) Transformer, class 1 ±1.0 % Rectangular 0.577 % 1 0.577 Meter, class 1 ±1.0 % Rectangular 0.577 % 1 0.577 Both rows are Type B. ✅
-
Combined and expanded uncertainty.
Each source carries half of the variance. ✅
-
In kilowatt hours.
The result is 500 kWh ± 8 kWh (k = 2). ✅
Step 2: Low load
Click to reveal the budget at 6.2 A
-
Standard uncertainties. The transformer’s limit is now ±3 percent. The meter’s limit is unchanged.
✅
-
The budget.
Source Value (limit) Distribution Divisor Standard uncertainty Sensitivity coefficient Contribution (% of energy) Transformer, class 1 at low current ±3.0 % Rectangular 1.732 % 1 1.732 Meter, class 1 ±1.0 % Rectangular 0.577 % 1 0.577 ✅
-
Combined and expanded uncertainty.
The transformer carries
percent of the variance. ✅ -
In kilowatt hours.
The result is 36.0 kWh ± 1.3 kWh (k = 2). ✅
Step 3: Check, and compare the two cases
Click to reveal the check
-
Compare with the plain sum of the limits. The two limits add to 2.0 percent at full load and to 4.0 percent at low load. The expanded uncertainties, 1.63 and 3.65 percent, are below these sums, as they must be: the error can never be larger than the sum of the limits. ✅
-
Check by simulation. The Python script draws 400 000 pairs of errors at random inside the limits and adds them. The standard deviations are 0.81 percent and 1.83 percent, equal to the two values of
. ✅ -
Coverage. At full load 96.7 percent of the simulated errors are inside ±
. At low load 99.0 percent are inside. One rectangular term dominates there, so covers more than 95 percent. The stated interval is a little cautious, which is acceptable. ✅
Check it after fitting. A figure that will support a claim of saving is checked against a second instrument before the first day is recorded. The electrician does the work inside the panel; you prepare the expected values and read the meter.
- Sign and power factor. With the compressor running, each phase must show a positive power and a believable power factor. A negative phase is a reversed transformer; a power factor far from the others is a transformer paired with the wrong voltage.
- Current against a clamp meter. The electrician measures each phase conductor with a calibrated clamp meter (for example ±2 percent). At 62 A the meter and the clamp must agree within about 2.5 A, the sum of the three limits (1 + 1 + 2 percent of 62 A). A reading of 124 A or 31 A is a wrong ratio entered in the meter.
- Power against a calculation. The electrician also measures the line-to-line voltage
; take the power factor from the meter, and work out for a balanced load: at 400 V, 62 A and a power factor of 0.85 that is 36.5 kW. The meter’s power must agree within its limits.
Write the three results, the ratio and the date into the record. Repeat the check after any work in the panel.
Verify It in Python
The script repeats both applications: the secondary current, the burden as volt-amperes and as resistance, the longest lead for four sizes of wire, and the two uncertainty budgets, each checked by simulation. Last, it prints the error of power that a phase displacement of one degree causes at four power factors. It saves two plots: the burden against the lead length, and the simulated errors of the energy.
"""Burden of a 100 A : 5 A current transformer with its leads and meter,and the combined uncertainty of the energy it measures with a class 1 meter."""import numpy as npimport matplotlib.pyplot as plt
RHO = 0.0175 # ohm mm2 per m, copperI_PRI_RATED = 100.0 # AI_SEC_RATED = 5.0 # ARATED_BURDEN = 2.5 # VAMETER_BURDEN = 0.2 # VA at 5 AAREA = 2.5 # mm2ONE_WAY = 4.0 # mI_LOAD = 62.0 # A, compressor running
def lead_resistance(one_way, area): """Resistance of the go and return leads together.""" return RHO * 2.0 * one_way / area
def total_burden(one_way, area, i_sec=I_SEC_RATED): """Burden of leads and meter in VA at the secondary current i_sec.""" r_meter = METER_BURDEN / I_SEC_RATED**2 return i_sec**2 * (lead_resistance(one_way, area) + r_meter)
def longest_one_way(area, i_sec_rated=I_SEC_RATED, meter_va=METER_BURDEN): """Longest one-way lead that keeps the burden within the rated value.""" r_allowed = (RATED_BURDEN - meter_va) / i_sec_rated**2 return r_allowed * area / RHO / 2.0
# ---------- Part 1: secondary current and burden ----------ratio = I_PRI_RATED / I_SEC_RATEDi_sec = I_LOAD / ratior_lead = lead_resistance(ONE_WAY, AREA)r_meter = METER_BURDEN / I_SEC_RATED**2r_rated = RATED_BURDEN / I_SEC_RATED**2va_lead = I_SEC_RATED**2 * r_leadva_total = total_burden(ONE_WAY, AREA)print("Current transformer 100 A : 5 A, class 1, rated burden 2.5 VA")print(f" ratio {ratio:.0f}, secondary current at {I_LOAD:.0f} A: {i_sec:.2f} A")print(f" lead resistance, {2 * ONE_WAY:.0f} m of {AREA} mm2: {r_lead:.4f} ohm")print(f" lead burden at 5 A: {va_lead:.2f} VA, meter {METER_BURDEN:.1f} VA, " f"total {va_total:.2f} VA")print(f" margin: {RATED_BURDEN - va_total:.2f} VA, " f"used {100.0 * va_total / RATED_BURDEN:.0f} % of the rated burden")print(f" as impedances: rated {r_rated:.3f} ohm, meter {r_meter:.3f} ohm, " f"leads {r_lead:.3f} ohm, total {r_lead + r_meter:.3f} ohm")print(f" at {i_sec:.2f} A: {total_burden(ONE_WAY, AREA, i_sec):.3f} VA, " f"secondary voltage {i_sec * (r_lead + r_meter):.3f} V")print("Longest one-way lead within 2.5 VA")for area in (1.5, 2.5, 4.0, 6.0): print(f" {area:>3.1f} mm2: {longest_one_way(area):5.2f} m")r_1a = (RATED_BURDEN - METER_BURDEN) / 1.0**2print(f" a 1 A secondary, 2.5 mm2, same burdens: " f"{r_1a * AREA / RHO / 2.0:.0f} m")
# ---------- Part 2: combined uncertainty of the energy ----------ROOT3 = np.sqrt(3.0)METER_LIMIT = 1.0 # percent of reading, class 1 meter
def energy_uncertainty(ct_limit, meter_limit=METER_LIMIT): """Combined standard uncertainty in percent, two rectangular limits.""" u_ct = ct_limit / ROOT3 u_meter = meter_limit / ROOT3 return u_ct, u_meter, np.hypot(u_ct, u_meter)
cases = [("compressor running, 62 A", 1.0, 500.0), ("standby, 6.2 A", 3.0, 36.0)]rng = np.random.default_rng(7)N = 400_000sim = {}print("Energy from the transformer and a class 1 meter")for name, ct_limit, kwh in cases: u_ct, u_meter, uc = energy_uncertainty(ct_limit) U = 2.0 * uc err = rng.uniform(-ct_limit, ct_limit, N) + rng.uniform(-METER_LIMIT, METER_LIMIT, N) sim[name] = (err, U) print(f" {name}: transformer limit {ct_limit:.1f} %") print(f" u_ct = {u_ct:.3f} %, u_meter = {u_meter:.3f} %, " f"u_c = {uc:.3f} %, U = {U:.2f} % (k = 2)") print(f" share of the transformer: {100.0 * u_ct**2 / uc**2:.0f} %, " f"sum of the limits {ct_limit + METER_LIMIT:.1f} %") print(f" {kwh:.0f} kWh +/- {kwh * U / 100.0:.1f} kWh") print(f" simulated: standard deviation {err.std():.2f} %, " f"inside +/- U: {100.0 * np.mean(np.abs(err) <= U):.1f} %")_, _, uc_15 = energy_uncertainty(1.5)print(f" if the limit at 62 A were 1.5 %: U = {2.0 * uc_15:.2f} %")_, _, uc_05 = energy_uncertainty(0.5, 0.5)print(f" class 0.5 transformer and class 0.5 meter: U = {2.0 * uc_05:.2f} %")
# ---------- Part 3: phase displacement and power factor ----------print("Error of power from a phase displacement of 1 degree")beta = np.radians(1.0)for pf in (1.0, 0.9, 0.8, 0.5): tan_phi = np.tan(np.arccos(pf)) print(f" power factor {pf:.1f}: {100.0 * tan_phi * beta:.2f} %")
# ---------- Plot ----------fig, ax = plt.subplots(1, 2, figsize=(10, 4.2))length = np.linspace(0.0, 15.0, 200)for area in (1.5, 2.5, 4.0): ax[0].plot(length, total_burden(length, area), label=f"{area} mm2")ax[0].axhline(RATED_BURDEN, color="black", linestyle="--")ax[0].plot([ONE_WAY], [va_total], "ko")ax[0].set_ylim(0, 5)ax[0].set_xlabel("one-way lead length (m)")ax[0].set_ylabel("burden at 5 A (VA)")ax[0].set_title("Burden against lead length, rated 2.5 VA dashed")ax[0].legend()for name, (err, U) in sim.items(): ax[1].hist(err, bins=120, density=True, alpha=0.6, label=name)ax[1].set_xlabel("error of the energy (% of reading)")ax[1].set_title("Simulated errors of the energy")ax[1].legend()fig.tight_layout()fig.savefig("ct_energy_metering.png", dpi=120)print("Saved ct_energy_metering.png")Expected output
Current transformer 100 A : 5 A, class 1, rated burden 2.5 VA ratio 20, secondary current at 62 A: 3.10 A lead resistance, 8 m of 2.5 mm2: 0.0560 ohm lead burden at 5 A: 1.40 VA, meter 0.2 VA, total 1.60 VA margin: 0.90 VA, used 64 % of the rated burden as impedances: rated 0.100 ohm, meter 0.008 ohm, leads 0.056 ohm, total 0.064 ohm at 3.10 A: 0.615 VA, secondary voltage 0.198 VLongest one-way lead within 2.5 VA 1.5 mm2: 3.94 m 2.5 mm2: 6.57 m 4.0 mm2: 10.51 m 6.0 mm2: 15.77 m a 1 A secondary, 2.5 mm2, same burdens: 164 mEnergy from the transformer and a class 1 meter compressor running, 62 A: transformer limit 1.0 % u_ct = 0.577 %, u_meter = 0.577 %, u_c = 0.816 %, U = 1.63 % (k = 2) share of the transformer: 50 %, sum of the limits 2.0 % 500 kWh +/- 8.2 kWh simulated: standard deviation 0.81 %, inside +/- U: 96.7 % standby, 6.2 A: transformer limit 3.0 % u_ct = 1.732 %, u_meter = 0.577 %, u_c = 1.826 %, U = 3.65 % (k = 2) share of the transformer: 90 %, sum of the limits 4.0 % 36 kWh +/- 1.3 kWh simulated: standard deviation 1.83 %, inside +/- U: 99.0 % if the limit at 62 A were 1.5 %: U = 2.08 % class 0.5 transformer and class 0.5 meter: U = 0.82 %Error of power from a phase displacement of 1 degree power factor 1.0: 0.00 % power factor 0.9: 0.85 % power factor 0.8: 1.31 % power factor 0.5: 3.02 %Saved ct_energy_metering.pngIn the left plot the black dot is the present installation, below the dashed line of 2.5 VA. In the right plot the errors at full load form a triangle, the sum of two equal rectangular terms. The errors at low load form a wide shape with a flat top, because one rectangular term dominates.
Common Mistakes
- Comparing the volt-amperes at the present current with the rated burden. The rated burden is stated at the rated secondary current. Compare at 5 A (or 1 A), or compare resistances.
- Counting the lead length one way. The secondary current flows out and back, so the resistance is that of twice the distance.
- Entering the wrong ratio in the meter, or leaving the default. A meter set to 200 : 5 on a 100 : 5 transformer shows exactly twice the true energy, and nothing on the display looks wrong.
- Accepting a reading because it is positive in total. One reversed transformer on a balanced load still gives a positive total, one third of the true value. Check the sign of the power in every phase.
- Quoting the class at rated current for a machine that runs far below the rating. A 400 A transformer on a 30 A load works below 10 percent of its rated current, where its limit is several times larger.
- Treating a current transformer like any other sensor that can be unplugged. An open secondary with current in the primary is dangerous. The work belongs to a licensed electrician.
Summary
- A current transformer gives a secondary current equal to the primary current divided by the rated ratio. For 62 A on a 100 A : 5 A transformer the secondary current is 3.10 A.
- The class is the limit of the ratio error in percent of reading at rated current. The limit is larger at low current, and it holds only when the burden is within the rated burden.
- The burden is the leads and the meter together, checked at the rated secondary current. Here it is 1.60 VA against 2.5 VA, and the longest 2.5 mm² lead is 6.57 m one way.
- The secondary must never be open while current flows in the primary. Fitting is for a licensed electrician.
- The limits of the transformer and of the meter combine by the root sum of squares. The energy is known to ±1.6 percent (k = 2) with the compressor running and to ±3.7 percent at 10 percent load.
- Direction and phase pairing are checked after fitting. A reversed transformer makes its phase count backwards.
Exercises
1. A current transformer of 200 A : 5 A measures a primary current of 148 A. Find the rated ratio and the secondary current.
Answer
2. A transformer with a 5 A secondary and a rated burden of 5 VA is connected to a meter of 0.2 VA by 1.5 mm² copper leads, 10 m each way. Is the burden within the rated value? What would the burden of the same leads be with a 1 A secondary?
Answer
3. For the transformer of Application 1 (2.5 VA, 5 A, meter 0.2 VA), find the longest lead one way if the leads are 4 mm² copper.
Answer
The leads may have
4. A class 0.5 transformer at rated current feeds a class 1 meter. In one month the meter records 1200 kWh. Find the expanded uncertainty of the energy (
Answer
5. A balanced three-phase load takes 36 kW. One of the three current transformers was fitted in the reversed direction. What power does the meter show, and what is the error as a percent of the true power?
Answer
Each phase carries 12 kW. The meter adds
6. A current transformer has a phase displacement of 0.5 degree at the present current. Estimate the error of the measured power that this causes at a power factor of 0.6, and at a power factor of 1.
Answer
References
- IEC 61869-2:2012, Instrument Transformers, Part 2: Additional Requirements for Current Transformers, International Electrotechnical Commission, 2012.
- IEC 62053-21:2020, Electricity Metering Equipment, Particular Requirements, Part 21: Static Meters for AC Active Energy (Classes 0,5, 1 and 2), International Electrotechnical Commission, 2020.
- JCGM 100:2008, Evaluation of Measurement Data: Guide to the Expression of Uncertainty in Measurement (GUM), Joint Committee for Guides in Metrology, 2008.
- J. P. Bentley, Principles of Measurement Systems, 4th edition, Pearson Education, 2005.
- The phase conductor passes once through a steel ring; the winding on it is the secondary.
- 100 A : 5 A is a ratio of 20, so 62 A in the conductor gives 3.10 A.
- The meter is told the ratio: 3.10 A × 20 shows 62 A.
- A small part of the primary current magnetises the core, so the secondary is a little low.
- Class 1: the ratio error is within ±1 % of reading at rated current, 100 A.
- At 5 % of rated current the limit is ±3 %, and below 5 % there is no limit at all.
A current transformer with a 5 A secondary feeds a meter 4 m away, on 2.5 mm² copper leads. The meter's input takes 0.2 VA. Which takes more of the transformer's burden?
The transformer of Application 1: rated burden 2.5 VA, meter 0.2 VA, copper leads. The burden is always counted at the rated secondary current, and the current goes out and back, so twice the length counts. Change to a 1 A secondary and watch the leads almost vanish from the bar: the same copper takes 25 times fewer volt-amperes.
A balanced load of 36 kW, 12 kW in each phase, at a power factor of 0.85, a usual value for a motor. Grey dots: the voltage. Thin line: the current that the meter receives. Shaded: their product, the power. Its average, the dashed line, is what the meter adds up. Reverse one transformer and watch its current turn upside down and its power go below the line.
Check yourself
Three questions. Each wrong choice is a mistake people really make, so read the note after you answer.
1. A transformer with a 5 A secondary and a rated burden of 2.5 VA feeds a meter of 0.2 VA by 1.5 mm² copper leads, 5 m each way. Today the feeder current gives 3.10 A in the secondary. Is the burden within the rated value?
2. A balanced three-phase load takes 45 kW. The transformer on one phase was fitted facing the wrong way. What does the meter show?
3. A meter fed by current transformers must be replaced while the compressor keeps running. What must the licensed electrician do first?
Discussion
No comments yet. Questions, results from your own build, a better way to explain it: all welcome.
My notes on this page
Kept on this device only. Nothing is sent anywhere.
Tip: select words in the lesson, or tap a figure or an equation, to put a note right there.
Notes on earlier wording
The lesson has changed and these words are no longer in it. Your notes are kept, with the words you chose.