Cost of unreliability
The Cost of Downtime
On this page
A technician asks for 30,000 currency units to fit sensors and is refused, because the maintenance budget is spent. In the same month a bearing stops the conveyor for five hours, and the loss is more than twice that sum. Nobody refuses the loss, because it appears in no budget: it is spread over late trucks, overtime and a customer told to wait. A site that cannot say what a failure costs will spend too little on preventing it, or spend in the wrong place. This lesson shows how to cost a stop, how to turn a failure record into a yearly cost, and how to build a case for a reliability measure that an owner can check. #CostOfDowntime #MaintenanceEconomics #Reliability
Learning Objectives
By the end of this lesson, you will be able to:
- List the parts of the cost of a stop and say why the cost is not the same every hour
- Calculate the yearly cost of unreliability of a machine from its failure rate and the cost of one failure
- Compare two expected yearly costs to find the saving, the nett benefit and the break-even point of a reliability measure
- Test a case against the uncertainty of its inputs and report a range and not a single figure
- Separate safety consequences from the cost calculation
Real-World System Problem: A conveyor and two compressors
The cold store of this course moves pallets on one conveyor and holds its rooms cold with two compressors, one on duty and one on standby. Both machines fail a few times a year. The owner has one sum of money for reliability work and asks: which machine is costing more, and what would the money buy?
The two lose money in different ways. When a conveyor bearing fails, the conveyor stops for about five hours, and every hour has a price. When the duty compressor fails, the standby normally takes the load and the stop costs only the repair; but on the day the standby does not start, or the fault is in something both compressors share, the stock is at risk. The maintenance budget shows neither loss, only the bearing and the technician’s hours.
Fundamental Theory: From one stop to a yearly cost
The parts of the cost of a stop
The cost of one failure is the sum of everything that would not have been spent or lost if the machine had kept running. It has five parts.
- Lost output. Product that was not made, moved or sold during the stop. If the output is recovered later, the loss is the cost of recovering it, not the full sale value.
- Lost stock. Material that was spoiled or scrapped: the contents of a cold room, a batch in process.
- Labour. The repair hours, and also the operators who stood idle and the overtime paid to recover.
- Penalties. Late delivery charges, a truck held at the dock, a rejected load.
- Recovery. The repair parts, urgent transport for a part, a hired machine, cleaning, and the restart.
The first test of each item: would this money have been spent anyway? A technician on salary costs the same on a day with no failure; the hour has a cost only because it was taken from other work. A site decides once how to price such hours and uses the rule everywhere. This course prices a technician hour at 1,500 currency units.
The second test: count each loss once. If late orders are caught up on overtime, count the overtime, not also the full value of the orders.
The repair is 18 percent of this cost, and the maintenance budget sees only that 18 percent: the tip of an iceberg, with the stop under the water.
Why the cost is not the same every hour
A figure such as “12,000 an hour” is an average. The real cost of a stop depends on when it comes and how long it lasts.
The conveyor loses about the same in each hour, so its cost grows in a straight line with the length of the stop. The cold room is different: with no cooling it holds its temperature for some hours, because the stock and the walls are cold, then the limit is passed and the stock is at risk. The cost rises in one step.
The shape decides what is worth doing. On a line, every hour removed from the repair saves the same amount. With a step, a repair one hour faster saves nothing if the stop stays on the wrong side of the step, and everything if it moves the stop to the safe side. In the compressor record of this course, 8 of the 9 stops lasted more than four hours. If the room holds for about four hours (a stated assumption), almost every compressor failure with no standby reaches the step, which is why the course uses one figure, 230,000 currency units, for stock and disruption when cooling is lost.
The cost of unreliability
The cost of one failure times the failures in a year is the cost of unreliability of that failure mode; the sum over the modes is that of the machine or the site.
Three points decide whether this number can be trusted.
comes from a record or from a model, and both are estimates. Nine failures in five years fix a rate only to within a factor of about three. is a mean over what usually happens, not the worst case. Using the cost of the worst failure for every failure is the most common way to inflate the result. - The sum is an average over many years. In one year the site sees some of the modes and not others.
Maintenance cost against failure cost
The yearly cost of owning a machine, for this purpose, has two parts:
Many texts draw this as a smooth curve with one best point, which is true only for some failure modes. Planned replacement reduces failures only for parts that wear out; for a part that fails at random it adds cost and removes nothing, and work that opens a machine can add failures of its own. So compare mode by mode, for a named task, never “more maintenance” in general.
A business case is a comparison of two expected costs
A reliability measure (a sensor, an inspection, a spare on the shelf, a redesign) makes failures less frequent, or each one cheaper. A measure that finds a developing failure in time turns an unplanned failure into a planned repair. If it finds a fraction
and the case for the measure is the saving against its own yearly cost
Nett benefit and break-even
The measure pays only if its real detection probability is above the break-even value. With several modes, the sum over the modes replaces the single product.
The break-even form changes the question. “Will this save 52,100 a year?” cannot be answered. “Will this find more than six failures in ten in time?” can be discussed by people who know the machine.
Honest handling of uncertainty
Every input of a case is uncertain: the failure rate (few failures), the cost of one failure (an estimate) and the effect of the measure (a hope until measured). Four habits keep a case honest:
- Give a range. Calculate the result with the low, the central and the high value of the weakest input, and show all three.
- Give the break-even value of the input that nobody knows.
- Say which input moves the result most. That is the one to measure first.
- Do not print more figures than the inputs deserve. A saving of “about 50,000 a year” is honest. “52,100” is the arithmetic.
An expected cost also hides the shape of the risk. The standby compressor fails to take the load about 0.09 times a year, at 380,000 each time: 34,200 a year expected, yet no year costs 34,200. Most cost nothing and one in about eleven costs 380,000. A business that could not survive that year should not decide on the average.
Safety is outside this arithmetic. A failure mode that could harm a person or release refrigerant is not given a price and is not weighed against a saving. It goes to a proper safety assessment by qualified people, which this course does not teach.
Application 1: The yearly cost of unreliability of the conveyor and the compressors
Step 1: The conveyor bearings
Click to reveal the calculation
-
Cost of one failure.
. The downtime is 60,000 of it, 82 percent. ✅ -
Mean life. For a Weibull model the mean life is
. With : ✅
-
Failures a year. A bearing that is replaced only when it fails is renewed, on average, once in every mean life. One bearing position gives
failures a year, and three positions give 2.23 failures a year. ✅ -
Cost of unreliability.
currency units a year (164,031 before rounding), with 11.2 hours of conveyor downtime a year. ✅
-
With the maker’s figures. The mean life is 12,411 h, the failures are 2.03 a year and the cost is 149,242 a year. The team’s estimate of 2 stops a year gives 147,000. The sources differ by about 10 percent, so an honest statement is “about 150,000 to 165,000 a year”. ✅
Step 2: The compressors, with one cost for every failure
Click to reveal the calculation
-
Mean cost of one failure.
✅
-
Cost of unreliability.
a year. This is the figure found with the standby calculation in the lesson on availability. ✅ -
The range from the record. Nine failures support any rate from 0.94 to 3.14 a year. The cost at the two ends is
and : about 152,000 to 507,000 a year. ✅
Step 3: The compressors, mode by mode
Click to reveal the calculation
-
Each mode.
Failure mode Events a year Mean cost of one Cost a year Control sensor failure 0.25 117,500 29,375 Blocked condenser 0.50 52,000 26,000 Valve failure 0.40 40,000 16,000 Bearing wear 0.10 150,000 15,000 Motor winding failure 0.05 150,000 7,500 Oil loss 0.20 10,000 2,000 Contactor failure 0.15 9,000 1,350 Loss of refrigerant charge 0.15 safety assessment not costed The rates add to 1.80 a year, the rate of the record. The seven costed modes add to 97,225 a year. ✅
-
The standby that does not start. The five modes that the standby covers have a total rate of 0.90 a year. In 5 of 100 of those events the standby does not take the load: 0.045 events a year, each with stock and disruption of 230,000, which is 10,350 a year. ✅
-
Cost of unreliability, mode by mode.
a year, with the safety mode outside the sum. ✅ -
The difference. The single cost gave 290,700, which is 2.7 times as much. It priced every failure as a major repair of 150,000. In the list of modes only bearing wear and motor winding failure cost that much, and they are 0.15 of the 1.80 failures a year. The mean cost of one costed event is
. ✅
Step 4: Check the conveyor result a second way
Click to reveal the check
-
Simulation. The script draws bearing lives from the fitted Weibull model for three positions, renews each bearing when it fails, and counts the failures in each of 20,000 years. The mean is 2.23 failures a year, the same as the calculation. ✅
-
What one year looks like. In the simulation 4 percent of the years have no failure and 10 percent have four or more. The cost of one year is therefore anywhere from nothing to 294,000 or more. The figure of 164,000 is the long-run average. ✅
-
A limiting case for the compressors. Set the start probability to 1 and the single-cost figure becomes
. Set it to 0 and it becomes 684,000. Both agree with the values found in the lesson on availability. ✅
Application 2: The case for condition monitoring on the compressors
Step 1: The saving for each mode
Click to reveal the calculation
-
Control sensor failure. Half of the events are missed today, and each missed event costs
more than one found in time. With
this is 25,312 a year, the saving found for the second probe in the lesson on failure modes and effects. ✅ -
Blocked condenser.
. ✅ -
Bearing wear.
. ✅ -
Valve failure.
. ✅ -
All four.
a year. With the supplier’s the saving is 52,100 a year. ✅
Step 2: The cost, the nett benefit and the break-even point
Click to reveal the calculation
-
Yearly cost of the full package. Equipment
, service 9,600, false alarms . ✅
-
Nett benefit at the supplier’s figure.
a year. ✅ -
Break-even.
. The package pays only if it finds about six developing failures in ten in time. ✅ -
Sensitivity to the detection probability.
Saving a year Nett benefit a year 0.3 19,538 0.5 32,562 0.6 39,075 475 0.8 52,100 13,500 0.9 58,612 20,012 1.0 65,125 26,525 A package that nobody answers, with
, loses 19,000 a year. ✅
Step 3: Test the two groups of sensors separately
Click to reveal the calculation
-
Room and condenser sensors alone. Saving
. Cost a year. ✅ -
Their result. Break-even at
. At the saving is 40,900 and the nett benefit is 24,100 a year, with a simple payback of 1.0 year on the 30,000 spent. ✅ -
The compressor health sensors, as an addition. They add
a year of cost and of saving. Even with they save less than they cost. ✅ -
Compare. At
the smaller package has a nett benefit of 24,100 and the full package 13,500. The full package looked acceptable only because the room and condenser sensors carried the rest. ✅
Step 4: Check against the uncertainty of the failure rate and the limits
Click to reveal the check
-
Limiting cases. With
the nett benefit is , the cost of the package and nothing else. With it is . No value of can give more. ✅ -
The failure rate. The record allows 0.94 to 3.14 failures a year against the 1.80 used here, a factor of 0.52 to 1.75. If every mode moves by the same factor, the nett benefit at
is: Rates Full package Room and condenser sensors Low end (factor 0.52) 4,537 As recorded 13,500 24,100 High end (factor 1.75) 52,316 54,571 ✅
-
Reading. The room and condenser sensors pay across the whole interval. The full package depends on which end of the interval is true, and the record cannot say. ✅
-
Payback. At
the full package returns its 100,000 in 3.0 years and the smaller one returns its 30,000 in 1.0 year. ✅
Verify It in Python
The script reproduces both applications, checks the conveyor by simulation, and saves one plot of the three estimates and of the nett benefit against the detection probability.
"""The cost of unreliability of a conveyor and a compressor plant, and the case for monitoring."""import numpy as npfrom scipy.special import gammafrom scipy.stats import chi2import matplotlib.pyplot as plt
YEAR = 8400.0 # hours in service in a year at the siteTECH_HOUR = 1500.0 # currency unitsCONV_HOUR = 12000.0 # conveyor downtime, currency units per hourSTOCK_LOSS = 230000.0 # stock and disruption when cooling is lostMAJOR_REPAIR = 150000.0 # major compressor repair, standby takes overOVERHAUL = 90000.0 # planned compressor overhaulP_START = 0.95 # chance that the standby takes the load when called
# ---------- Application 1a: the conveyor bearings ----------N_BEARINGS = 3BETA, ETA = 2.13, 12750.0 # fitted to the 12 bearing lives of the recordBETA_M, ETA_M = 2.4, 14000.0 # the maker's figuresc_fail = 4500.0 + 6 * TECH_HOUR + 5 * CONV_HOURmean_life = ETA * gamma(1.0 + 1.0 / BETA)mean_life_m = ETA_M * gamma(1.0 + 1.0 / BETA_M)n_conv = N_BEARINGS * YEAR / mean_lifen_conv_m = N_BEARINGS * YEAR / mean_life_mprint("Application 1: cost of unreliability")print(" Conveyor bearings, run to failure")print(f" cost of one failure: {c_fail:,.0f} " f"(downtime {5 * CONV_HOUR:,.0f}, {100 * 5 * CONV_HOUR / c_fail:.0f} % of it)")print(f" gamma function value {gamma(1.0 + 1.0 / BETA):.4f}, " f"mean life from the record: {mean_life:,.0f} h, " f"{YEAR / mean_life:.3f} failures a year for each bearing")print(f" {N_BEARINGS} bearings: {n_conv:.2f} failures a year, " f"{5 * n_conv:.1f} h of conveyor downtime a year")print(f" cost of unreliability: {n_conv * c_fail:,.0f} a year")print(f" with the maker's figures: mean life {mean_life_m:,.0f} h, " f"{n_conv_m:.2f} failures a year, {n_conv_m * c_fail:,.0f} a year")print(f" with the ranking session's 2 stops a year: {2 * c_fail:,.0f} a year")
# check by simulation: 3 bearing positions, each renewed at failure, 20,000 yearsrng = np.random.default_rng(1)YEARS_SIM = 20000counts = np.zeros(YEARS_SIM, dtype=int)for _ in range(N_BEARINGS): lives = ETA * rng.weibull(BETA, int(1.3 * YEARS_SIM * YEAR / mean_life)) t = np.cumsum(lives) t = t[t < YEARS_SIM * YEAR] counts += np.bincount((t // YEAR).astype(int), minlength=YEARS_SIM)late = counts[5:] # leave out the first years, when all bearings are newprint(f" simulation of {YEARS_SIM:,} years: {late.mean():.2f} failures a year on average")print(f" years with no failure: {100 * np.mean(late == 0):.0f} %, " f"years with 4 or more: {100 * np.mean(late >= 4):.0f} %, most in one year: {late.max()}")
# ---------- Application 1b: the compressors ----------T_REC, N_REC = 5 * YEAR, 9rate = N_REC / T_REC * YEARc_event = P_START * MAJOR_REPAIR + (1 - P_START) * (MAJOR_REPAIR + STOCK_LOSS)rate_lo = YEAR / (2 * T_REC / chi2.ppf(0.05, 2 * N_REC))rate_hi = YEAR / (2 * T_REC / chi2.ppf(0.95, 2 * N_REC + 2))print(" Compressors, one cost for every failure")print(f" {rate:.2f} failures a year, mean cost of one {c_event:,.0f}")print(f" cost of unreliability: {rate * c_event:,.0f} a year")print(f" 90 % interval of the rate: {rate_lo:.2f} to {rate_hi:.2f} a year, " f"cost {rate_lo * c_event:,.0f} to {rate_hi * c_event:,.0f} a year")
# name, failures a year, class, mean cost of one event (None: safety, not costed)MODES = [ ("Bearing wear", 0.10, "C", MAJOR_REPAIR), ("Valve failure", 0.40, "C", 40000.0), ("Loss of refrigerant", 0.15, "A", None), ("Motor winding failure", 0.05, "C", MAJOR_REPAIR), ("Contactor failure", 0.15, "C", 6000.0 + 2 * TECH_HOUR), ("Blocked condenser", 0.50, "B", 0.2 * (STOCK_LOSS + 4 * TECH_HOUR) + 0.8 * (4 * TECH_HOUR)), ("Oil loss", 0.20, "C", 10000.0), ("Control sensor failure", 0.25, "B", 0.5 * STOCK_LOSS + 0.5 * 5000.0),]print(" Compressors, mode by mode")total_modes, rate_c, rate_costed = 0.0, 0.0, 0.0for name, lam, cls, cost in MODES: if cost is None: print(f" {name:23s} {lam:.2f} a year class {cls} not costed (safety)") continue total_modes += lam * cost rate_costed += lam rate_c += lam if cls == "C" else 0.0 print(f" {name:23s} {lam:.2f} a year class {cls} " f"{cost:9,.0f} each {lam * cost:8,.0f} a year")no_start = rate_c * (1 - P_START) * STOCK_LOSSprint(f" sum of the rates: {sum(m[1] for m in MODES):.2f} a year, " f"costed {rate_costed:.2f} a year")print(f" seven costed modes: {total_modes:,.0f} a year, " f"mean cost of one event {total_modes / rate_costed:,.0f}")print(f" class C events {rate_c:.2f} a year; the standby fails to start in " f"{rate_c * (1 - P_START):.3f} of them a year: {no_start:,.0f} a year")cou_modes = total_modes + no_startprint(f" cost of unreliability, mode by mode: {cou_modes:,.0f} a year")print(f" the single cost gives {rate * c_event / cou_modes:.1f} times as much")
# ---------- Application 2: the case for condition monitoring ----------# saving a year if every developing failure of the mode is found in time (p = 1)SAVING_AT_1 = [ ("Bearing wear: planned overhaul", 0.10 * (MAJOR_REPAIR - OVERHAUL), "health"), ("Valve failure: planned repair", 0.40 * (40000.0 - 20000.0), "health"), ("Blocked condenser: cleaned in time", 0.50 * 0.2 * STOCK_LOSS, "room"), ("Control sensor: second probe, alarm", 0.25 * 0.5 * (STOCK_LOSS - 5000.0), "room"),]# package: equipment and fitting (over 5 years), service a year, false alarms a yearPACKAGES = { "full": (100000.0, 9600.0, 3), "room": (30000.0, 4800.0, 2),}FALSE_ALARM = 2 * TECH_HOUR
def yearly_cost(package): equipment, service, alarms = PACKAGES[package] return equipment / 5.0 + service + alarms * FALSE_ALARM
def saving_at_1(package): return sum(s for _, s, kind in SAVING_AT_1 if package == "full" or kind == "room")
print("Application 2: the case for condition monitoring on the compressors")for name, s, kind in SAVING_AT_1: print(f" {name:38s} {s:8,.0f} a year at p = 1 ({kind})")for pk in PACKAGES: print(f" {pk} package: saving at p = 1 {saving_at_1(pk):,.0f}, " f"cost {yearly_cost(pk):,.0f} a year, " f"break-even p = {yearly_cost(pk) / saving_at_1(pk):.3f}")print(" p saving(full) net(full) saving(room) net(room)")for p in (0.3, 0.5, 0.6, 0.8, 0.9, 1.0): sf, st = p * saving_at_1("full"), p * saving_at_1("room") print(f" {p:.1f} {sf:10,.0f} {sf - yearly_cost('full'):9,.0f} " f"{st:11,.0f} {st - yearly_cost('room'):9,.0f}")extra_cost = yearly_cost("full") - yearly_cost("room")extra_saving = saving_at_1("full") - saving_at_1("room")print(f" the compressor health sensors alone: costs {extra_cost:,.0f} a year, " f"saves {extra_saving:,.0f} a year at p = 1")p0 = 0.8print(f" at p = {p0}, with the failure rates at the ends of the 90 % interval:")for label, k in (("low", rate_lo / rate), ("record", 1.0), ("high", rate_hi / rate)): print(f" {label:6s} rates x {k:.2f}: net full {k * p0 * saving_at_1('full') - yearly_cost('full'):8,.0f}, " f"net room {k * p0 * saving_at_1('room') - yearly_cost('room'):8,.0f}")eq, sv, al = PACKAGES["full"]cash = p0 * saving_at_1("full") - sv - al * FALSE_ALARMprint(f" simple payback of the full package at p = {p0}: {eq / cash:.1f} years")eq, sv, al = PACKAGES["room"]cash = p0 * saving_at_1("room") - sv - al * FALSE_ALARMprint(f" simple payback of the room package at p = {p0}: {eq / cash:.1f} years")conv_saving = n_conv * (c_fail - (4500.0 + 2 * TECH_HOUR))print(f" the same vibration method on the conveyor bearings: " f"{conv_saving:,.0f} a year at p = 1")
# ---------- Plot ----------p = np.linspace(0.0, 1.0, 101)fig, ax = plt.subplots(1, 2, figsize=(11, 4.5))ax[0].bar(["conveyor\nbearings", "compressors\none cost", "compressors\nby mode"], [n_conv * c_fail, rate * c_event, cou_modes])ax[0].set_ylabel("cost of unreliability (currency units a year)")ax[0].set_title("Three estimates from the same site")for pk, style in (("full", "-"), ("room", "--")): ax[1].plot(p, p * saving_at_1(pk) - yearly_cost(pk), style, label=f"{pk} package")ax[1].axhline(0.0, color="gray", linewidth=0.8)ax[1].set_xlabel("detection probability p")ax[1].set_ylabel("net benefit (currency units a year)")ax[1].set_title("The case depends on the detection probability")ax[1].legend()fig.tight_layout()fig.savefig("cost_of_downtime.png", dpi=120)print("Saved cost_of_downtime.png")Expected output
Application 1: cost of unreliability Conveyor bearings, run to failure cost of one failure: 73,500 (downtime 60,000, 82 % of it) gamma function value 0.8856, mean life from the record: 11,292 h, 0.744 failures a year for each bearing 3 bearings: 2.23 failures a year, 11.2 h of conveyor downtime a year cost of unreliability: 164,031 a year with the maker's figures: mean life 12,411 h, 2.03 failures a year, 149,242 a year with the ranking session's 2 stops a year: 147,000 a year simulation of 20,000 years: 2.23 failures a year on average years with no failure: 4 %, years with 4 or more: 10 %, most in one year: 7 Compressors, one cost for every failure 1.80 failures a year, mean cost of one 161,500 cost of unreliability: 290,700 a year 90 % interval of the rate: 0.94 to 3.14 a year, cost 151,656 to 507,278 a year Compressors, mode by mode Bearing wear 0.10 a year class C 150,000 each 15,000 a year Valve failure 0.40 a year class C 40,000 each 16,000 a year Loss of refrigerant 0.15 a year class A not costed (safety) Motor winding failure 0.05 a year class C 150,000 each 7,500 a year Contactor failure 0.15 a year class C 9,000 each 1,350 a year Blocked condenser 0.50 a year class B 52,000 each 26,000 a year Oil loss 0.20 a year class C 10,000 each 2,000 a year Control sensor failure 0.25 a year class B 117,500 each 29,375 a year sum of the rates: 1.80 a year, costed 1.65 a year seven costed modes: 97,225 a year, mean cost of one event 58,924 class C events 0.90 a year; the standby fails to start in 0.045 of them a year: 10,350 a year cost of unreliability, mode by mode: 107,575 a year the single cost gives 2.7 times as muchApplication 2: the case for condition monitoring on the compressors Bearing wear: planned overhaul 6,000 a year at p = 1 (health) Valve failure: planned repair 8,000 a year at p = 1 (health) Blocked condenser: cleaned in time 23,000 a year at p = 1 (room) Control sensor: second probe, alarm 28,125 a year at p = 1 (room) full package: saving at p = 1 65,125, cost 38,600 a year, break-even p = 0.593 room package: saving at p = 1 51,125, cost 16,800 a year, break-even p = 0.329 p saving(full) net(full) saving(room) net(room) 0.3 19,538 -19,062 15,338 -1,462 0.5 32,562 -6,038 25,562 8,762 0.6 39,075 475 30,675 13,875 0.8 52,100 13,500 40,900 24,100 0.9 58,612 20,012 46,012 29,212 1.0 65,125 26,525 51,125 34,325 the compressor health sensors alone: costs 21,800 a year, saves 14,000 a year at p = 1 at p = 0.8, with the failure rates at the ends of the 90 % interval: low rates x 0.52: net full -11,420, net room 4,537 record rates x 1.00: net full 13,500, net room 24,100 high rates x 1.75: net full 52,316, net room 54,571 simple payback of the full package at p = 0.8: 3.0 years simple payback of the room package at p = 0.8: 1.0 years the same vibration method on the conveyor bearings: 147,293 a year at p = 1Saved cost_of_downtime.pngCommon Mistakes
- Reading the cost of a failure from the maintenance budget. Parts and labour were 18 percent of the cost of a conveyor bearing failure; the rest was the stop.
- Pricing every failure at the cost of the worst one. One cost of 150,000 for every compressor failure gave 2.7 times the mode-by-mode figure.
- Multiplying an average cost per hour by the downtime of every stop. A cost with a step (lost stock) does not grow hour by hour, and short stops are not small copies of long ones.
- Presenting a saving as one exact figure. Give the break-even value of the least certain input and the result at both ends of the range.
- Judging a package as a whole. Test each measure against the modes it can see, or a good measure pays for a poor one.
- Putting a price on a safety consequence so that it can be weighed against a saving. Safety modes go to a safety assessment and stay outside the sum.
Summary
- The cost of a stop is lost output, lost stock, labour, penalties and recovery, each counted once. The repair is often the small part.
- The cost is not the same every hour. Some costs grow with the length of the stop and some arrive in one step.
- The cost of unreliability is the sum over the failure modes of failures a year times the mean cost of one failure. For this site it is about 150,000 to 165,000 a year for the conveyor bearings and about 108,000 for the compressors.
- A business case compares two expected yearly costs. The saving is
, and the measure pays when its detection probability is above the break-even value. - For the compressors, the room and condenser sensors break even at
and the full package at . The compressor health sensors alone never pay on these figures. - Every figure is an average over many years under stated assumptions, and safety consequences are not in it.
Exercises
1. A gearbox failure stops the conveyor for 3 hours. The parts cost 6,000 currency units and the repair takes 4 technician hours at 1,500. Conveyor downtime costs 12,000 an hour. Find the cost of the failure and the share of it that the maintenance budget shows.
Answer
2. A machine has three failure modes. Mode 1 occurs 6 times a year and costs 5,000 each time. Mode 2 occurs 0.5 times a year and costs 120,000. Mode 3 occurs twice a year and costs 20,000. Find the cost of unreliability and rank the modes.
Answer
30,000, 60,000 and 40,000 a year: a total of 130,000. Mode 2 is first although it is the rarest, and mode 1 is last although it is the most frequent.
3. A cold room has one compressor and no standby. Each stop costs 1,500 for every hour of repair, and the stock (230,000) is lost if the stop is longer than 4 hours. The nine recorded stops lasted 7.1, 12.0, 11.1, 2.4, 12.0, 8.2, 7.4, 7.9 and 10.7 hours. Find the mean cost of one stop. Then say what a faster repair would have to achieve to matter.
Answer
Eight of the nine stops passed 4 hours:
4. A failure mode occurs 0.8 times a year. An unplanned failure costs 90,000 and a failure found in time costs 25,000. A monitoring measure costs 30,000 a year. Find the saving as a function of the detection probability, the break-even probability, and the nett benefit at a probability of 0.7.
Answer
5. The rate of 0.8 a year in exercise 4 came from 4 failures in 5 years. The 90 percent interval for a record that ended at a fixed time uses
Answer
Rate from
References
- P. D. T. O’Connor and A. Kleyner, Practical Reliability Engineering, 5th edition, Wiley, 2012.
- A. K. S. Jardine and A. H. C. Tsang, Maintenance, Replacement, and Reliability: Theory and Applications, 2nd edition, CRC Press, 2013.
- J. Moubray, Reliability-centred Maintenance, 2nd edition, Butterworth-Heinemann, 1997.
- A. M. Smith and G. R. Hinchcliffe, RCM: Gateway to World Class Maintenance, Elsevier Butterworth-Heinemann, 2004.
- One conveyor bearing fails. Its cost is everything lost because the conveyor stopped.
- Above the water, the bearing and 6 technician hours: 13,500, the part the budget sees.
- Under the water, 5 hours of stopped conveyor at 12,000 an hour: 60,000, counted once.
- Total 73,500. The budget sees 18 percent; the stop is the other 82 percent.
A conveyor bearing fails. The new bearing and the technician's six hours are booked to the maintenance budget. The conveyor stands for five hours. About what share of the real cost of this failure does the maintenance budget see?
The conveyor loses about 12,000 currency units in every hour of a stop, so its cost is a line. The cold room holds its temperature for some hours (4 hours is the lesson's stated assumption), then the stock is at risk: 230,000 in one step. Move the length of the stop across the room limit and watch what one hour is worth on each side.
Application 2 of the lesson. Each line is the saving (failures a year × p × the difference between an unplanned and a planned event) less the yearly cost of the sensors. At p = 0 a package costs its full price and saves nothing. The rate buttons move every failure rate to the ends of the 90 percent interval of the compressor record. The full package is the room and condenser sensors plus vibration and temperature sensors on the compressors.
Check yourself
Three questions. Each wrong choice is a mistake people really make, so read the note after you answer.
1. A pump fails 3 times a year: 2 seal leaks that cost 8,000 each, and 1 motor failure that costs 60,000. What is its cost of unreliability?
2. A sensor costs 12,000 a year. It watches a failure mode that occurs 0.5 times a year. An unplanned failure costs 50,000 and a failure found in time costs 10,000 as a planned repair. Above what detection probability does the sensor pay?
3. A cold room holds its temperature for about 4 hours with no cooling, and then 230,000 of stock is at risk. A compressor repair with no standby takes about 6 hours. A faster contractor offers 5 hours. What does that hour save on such a stop?
Discussion
No comments yet. Questions, results from your own build, a better way to explain it: all welcome.
My notes on this page
Kept on this device only. Nothing is sent anywhere.
Tip: select words in the lesson, or tap a figure or an equation, to put a note right there.
Notes on earlier wording
The lesson has changed and these words are no longer in it. Your notes are kept, with the words you chose.