Auditing a Solar System

Lesson 10 of 10 25 min read
Found this useful?

The owner was promised 15,500 kWh a year, and the meter shows 14,269. The installer says the year was cloudy. The owner says the system is poor. Each has a part of the truth, and neither can prove it, so the argument ends with a discount or with a lost customer and never with a repair. An audit ends that argument with a table: how much of the shortfall was the weather, how much was dust, how much was a fault, and how much nobody can explain. This lesson builds that table for the site of the course and turns it into a report that an owner can act on. #SolarAudit #EnergyYield #PerformanceRatio

Learning Objectives

By the end of this lesson, you will be able to:

  1. Check an installed system against its design from its documents and its records
  2. Calculate the shortfall of a year against the design, in kilowatt hours and in currency units
  3. Split the shortfall into light, soiling, a fault and a remainder, so that the parts add up
  4. State the uncertainty of each part and say which parts depend on the sensors
  5. Write a one-page audit report with actions ranked by value, each with its evidence

Real-World System Problem: One year, one missing megawatt hour



The site is a workshop and office near the equator with 18 modules of 550 W on the roof: 9.9 kWp at standard test conditions (STC), which a hot roof never meets. The design expected 5.5 peak sun hours a day and a performance ratio of 0.781 from a table of losses, and so 15,524 kWh in a year. The year on record gave 14,269 kWh. The difference is 1,255 kWh, and at a grid price of 22 currency units per kWh it is worth 27,609 currency units.

That figure alone says nothing about what to do. Weak light needs no repair; dust may justify a wash; a failed string should have been reported on the first day. The audit gives each cause its own share.

4 what it gave (meter)3 what it should giveloss table × light2 what light camesensor in thearray plane1 what is installedmodules, stringsinverter, battery5 shortfall by cause6 what was used on site7 report and actions
The order of an audit

Fundamental Theory: A shortfall that adds up



Start with what is installed

An audit begins with paper: the count of modules, their label power, the number in each string and the limits of the inverter, from the data sheets, drawings and labels. An array that was sold as 9.9 kWp and built with 17 modules is already 5.6 percent short, and no later step would find that.

Two expected values

The design gives one expected energy: the performance ratio of the loss table multiplied by the reference energy of the design year.

The light of the real year is never the design light, so the audit forms a second expected energy from the same table and the insolation measured in the plane of the array:

The difference between the two belongs to the weather, and no repair recovers it. The difference between and the meter belongs to the system.

Each cause by its own method

The common mistake is to subtract the weather and call all the rest “losses”. A useful audit estimates each cause from its own evidence in the record, and only then looks at what is left.

The split of the shortfall

. is the soiling loss measured from the sawtooth of the daily performance ratio, less the soiling that the table already allows. is the energy lost in the fault against the frozen reference. is whatever remains. It is never set to zero by adjusting the other three.

Three rules keep the split honest.

Do not count a loss twice. The loss table already contains a soiling factor of 0.97, so if the record shows a soiling loss of 4 percent, only the part above the allowance is a shortfall against the design.

State the order. Each part acts on what the part before left, so the light counted at the table’s performance ratio and at the measured one differ by a few percent of the part.

Keep the remainder. It holds the scatter of the days, the errors of the three estimates, and every loss a daily record cannot separate. A remainder near zero shows the causes are understood; a large one is a finding in itself.

designsame table, real lightmeterlightsoiling (extra)faultremainder
A shortfall as a chain of parts

What a daily record cannot separate

Clipping happens for minutes around noon on the brightest days. A daily sum of energy cannot show it; only the power at short intervals can, as a flat top at the inverter rating. The same is true of short stops and passing shade. In an audit from daily records these stay in the remainder, and the report says so.

Uncertainty: relative parts and absolute parts

Every part of the split is an estimate, and a report must say how good each is. The parts are of two kinds.

The soiling and the fault are relative parts: each compares the array with itself, a dirty day with a clean day, a faulty day with the days before it. A sensor that reads 3 percent high makes every performance ratio 3 percent low, and the comparison is unchanged (as a bathroom scale that reads high still shows the weight you lost correctly).

The light and the remainder are absolute parts: they compare the meter with the sensor, and a sensor error passes directly into them:

where is the uncertainty of the sensor as a fraction. Uncertainties that are independent of each other combine as the root of the sum of their squares:

The largest term rules the result, and in the field it is usually the irradiance sensor; the calibration certificate of the real sensor and the class of the real meter decide the values.

One uncertainty no sensor removes: one year is one sample of the weather, and the design mean is itself an estimate from a long record or a satellite database.

The battery’s share

The performance ratio stops at the inverter output, but the owner cares about what reached the load. The second half of an audit follows the energy further: to the load, lost in the battery, with nowhere to go, and what the grid or the generator still had to give.

Application 1: The yearly audit of the site



Step 1: What is installed

Click to reveal the check
  1. Nameplate. kWp, as in the design. ✅

  2. Strings. The cold open-circuit voltage of 467.3 V is below the 600 V limit. The hot working voltage of 332.6 V is inside the tracking range. The short-circuit current of 13.90 A is below the 20 A of a tracker. ✅

  3. Inverter. The DC to AC ratio is . Some clipping on the brightest days is expected, and the table allows 0.5 percent for it. The system is built as designed, so the audit can compare the meter with the full 9.9 kWp. ✅

Step 2: Expected, measured and the shortfall

Click to reveal the calculation
  1. Design. The table multiplies to . The design year has kWh/m².

    ✅

  2. Measured. The record has kWh/m² and kWh. The performance ratio of the year is . ✅

  3. Shortfall.

    This is 8.1 percent of the design, and 27,609 currency units at 22 per kWh (the script keeps more digits). ✅

Step 3: The split

Click to reveal the calculation
  1. Light. The year had 3.7 percent less light than the design year: one particular year, below the long-term mean. The same table in the measured light gives

    (the parts are rounded from unrounded values). ✅

  2. Soiling in the record. The line fitted to the daily performance ratio against the dry days gives a soiling rate of 0.254 percent a day and a clean performance ratio of 0.801. The soiling loss of the year, summed day by day, is 599 kWh. ✅

  3. Soiling that the table allows. Without its soiling factor, the table in the measured light gives kWh. The factor of 0.97 allows 3 percent of that, 462 kWh.

    ✅

  4. Fault. With the reference frozen at 0.735, the median of the 14 days before day 250, the 22 days should have given 856.6 kWh. They gave 420.9 kWh.

    ✅

  5. Remainder.

    (from unrounded parts). ✅

  6. The table of the split.

    CausekWhShareCurrency units
    Less light than the design year57445.7 %12,618
    Soiling above the allowance13710.9 %3,010
    String fault, days 250 to 27143634.7 %9,586
    Remainder1098.7 %2,395
    Shortfall1,255100 %27,609

    ✅

light574soiling137(above the allowance)fault436remainder109
The shortfall of 1,255 kWh by cause (one block is 25 kWh)

Step 4: The uncertainty of each part

Click to reveal the calculation
  1. Light. A sensor uncertainty of 3 percent moves by

    The light part is kWh. The order of the split adds a smaller doubt: counted at the measured performance ratio of 0.746, the same light is 547 kWh. ✅

  2. Soiling. The three long dry spells of the record gave rates from 0.249 to 0.268 percent a day. With those rates the loss of the year is 590 to 625 kWh. The soiling part is kWh. ✅

  3. Fault. Half the array was lost, so the loss should equal what the other half gave: 420.9 kWh. The estimate from the record is 435.7 kWh. The fault part is kWh. ✅

  4. Meter. An energy meter at 1 percent moves the measured energy, and so the shortfall, by 143 kWh. ✅

  5. Remainder. It carries all four:

    The remainder is kWh. It cannot be told from zero. The scatter of 2 percent a day adds only 15 kWh over a year, so it is left out. ✅

Step 5: Check the split

Click to reveal the check
  1. Sum. kWh (the rounded parts give 1,256). This must be so, because the remainder is defined as what is left. The real test is the next one. ✅

  2. From the clean array, without the table. The measured clean performance ratio of 0.801 (0.8015 with one more digit) gives kWh for a clean array with no fault. Subtract the two measured losses:

    The meter shows 14,269 kWh. The record agrees with itself to within 36 kWh, a quarter of one percent, with no help from the design table. ✅

  3. What is in the remainder. The table expects 0.805 from a clean array, and the record shows 0.801. That gap alone is 73 kWh of the 109. Half a percent of performance ratio is far inside the uncertainty of any sensor, so the audit does not call it a defect. ✅

  4. Against the generator. The records are generated, so the true soiling rule is known: 0.25 percent a day up to 12 percent. With that rule the soiling loss is 579 kWh. The estimate of 599 kWh is 20 kWh high, inside the stated 25 kWh. A real audit has no such check. ✅

  5. Clipping. The record has 150 days above 5.5 peak sun hours. Earlier work on the inverter found no clipping on a clear day of 5.5 and 1.55 percent on a clear day of 6.5. A straight line through those two days gives about 72 kWh for the year. This is an indication only, and daily sums cannot confirm it. ✅

Application 2: The one-page audit report



Step 1: The battery’s share

Click to reveal the calculation
  1. Where the array energy of the clear day goes. The load served takes kWh of direct current.

    So 69 percent reaches the load, 2.4 percent is lost in the battery and 29 percent has nowhere to go. ✅

  2. The battery loss as a yearly figure. kWh a year. This is the price of using solar energy at night at a round-trip efficiency of 92 percent, not a defect. ✅

  3. The gap before sunrise. The battery reaches its lower limit at 03:40 on the clear day and the grid covers 1.60 kWh. If every day were the clear day this would be kWh a year, worth 12,848 currency units. On the worst month day the gap is 1.83 kWh, and on a day of heavy cloud 7.57 kWh. ✅

  4. The surplus over a year. The load is kWh a year, and the array gave 14,269 kWh. Even with a perfect battery, 3,319 kWh must be exported, used by new loads or not produced. ✅

  5. The warning for the performance ratio. If the 12.15 kWh of the clear day were not produced, a meter would count kWh, and the performance ratio of that day would be with a healthy array. The yearly record does not show that pattern: its clean days are near 0.80. So it is read as the energy the array could send somewhere. On a real site the auditor must establish which case applies. ✅

  6. What the audit can say. The yearly record holds nothing about the battery. The battery’s share comes from a model with a repeated load and a generated day, and the report must say so. ✅

array 42.47load, directly or through the battery29.28lost in the battery1.04spilled: battery full, no export12.15gridload before sunrise (AC)1.60
The clear battery day (kWh of direct current)

Step 2: The value of each action

Click to reveal the calculation
  1. Close the gap before sunrise. Moving about 1.6 kWh of evening load into the afternoon, where energy is spilled, costs nothing and is worth up to currency units a year. The other way is 50 Ah more battery: kWh at 30,000 is 76,800 currency units, paid back in years if the value is real. ✅

  2. Latched alarm on the daily performance ratio. For a fault like the one on record: currency units. ✅

  3. Wash after 30 dry days. currency units, less 4 washes at 800: a net 3,007 currency units a year. ✅

  4. Rank by value, then read the evidence. The order is the gap (12,848), the alarm (8,185), the wash (3,007). The largest value has the weakest evidence, a model, so its first step is a measurement and not a purchase. ✅

Step 3: The report

Click to reveal the report
  1. Findings.

    ItemFindingEvidenceUncertainty
    Installed system9.9 kWp, two strings of nine, 8 kW inverter, as designedData sheets, labels, string limitsNone found
    Light1,933.3 kWh/m², 3.7 % below the design yearSensor in the array plane3 % of the reading (assumed)
    Energy14,269 kWh against a design of 15,524 kWhMeter at the inverter output1 % (assumed)
    Performance ratio0.746 against 0.781. Clean and whole: 0.801 against 0.805Yearly sums, fit of the daily valuesFollows the sensor
    Shortfall1,255 kWh, 27,609 currency unitsDesign less meter± 143 kWh
    Part: light574 kWhSame table, measured light± 449 kWh
    Part: soiling599 kWh in all, 137 kWh above the 462 kWh allowedSawtooth of the daily values, rate 0.254 % a day± 25 kWh
    Part: fault436 kWh, one string out on days 250 to 271Step to half, frozen reference of 0.735± 15 kWh
    Part: remainder109 kWh, with clipping and scatter inside itWhat is left± 472 kWh, not different from zero
    BatteryAbout 1.6 kWh a day bought before sunrise, 12 kWh spilled on a clear afternoonModel of one dayUnknown until measured

    ✅

  2. Recommended actions, ranked by value.

    RankActionValue (currency units)EvidenceHow sure
    1Log the battery state of charge and the grid energy for one month. If the gap before sunrise is confirmed, move about 1.6 kWh of evening load into the afternoonUp to 12,848 a yearBattery day modelLow: a model with a repeated load
    2Set a latched alarm on the daily performance ratio and name the qualified person who is called8,185 for each fault like the one on record22 days of record, rule tested on the year with no false alarmEnergy within 4 %. How often a fault occurs is not known from one year
    3Wash after 30 dry days, never before expected rain3,007 a year, net of 4 washesMeasured soiling rate, assumed wash costTurns negative at twice the wash cost

    ✅

  3. What the report does not claim. It does not say that the modules have degraded: one year cannot show that. It does not give a figure for clipping. ✅

Step 4: Check the report

Click to reveal the check
  1. Against the shortfall. Actions 2 and 3 recover kWh of the 1,255 kWh. Soiling and the fault together cost currency units in the year, and the 574 kWh of light cannot be recovered. ✅

  2. Action 1 is outside the shortfall. The gap before sunrise lies after the inverter output, where the yield audit does not look. An audit of the performance ratio alone would have missed the largest value on the page. ✅

Verify It in Python



The script reproduces the audit: the expected and measured energy, the split with its uncertainties, the checks, and the value of the actions. It saves a plot of the steps from the design to the meter.

solar_audit.py
"""Yearly audit of the 9.9 kWp site: design against measured, and the shortfall split into causes."""
import numpy as np
import matplotlib.pyplot as plt
def year_of_yield(seed=11, kwp=9.9):
"""One year of daily records for the 9.9 kWp array: day number, plane-of-array
insolation (kWh/m2), array energy at the inverter output (kWh).
True model: base performance ratio 0.80; soiling loses 0.25 % a day since the
last rain or wash, up to 12 %; rain on random days in two wet seasons; a string
fault from day 250 to day 271 removes half the array; noise 2 %."""
rng = np.random.default_rng(seed)
d = np.arange(365)
wet = ((d >= 75) & (d < 150)) | ((d >= 285) & (d < 345))
h = 5.6 + 0.6 * np.cos(2 * np.pi * (d - 40) / 365) - 0.9 * wet + rng.normal(0, 0.7, 365)
h = np.clip(h, 1.5, 7.5)
rain = rng.random(365) < np.where(wet, 0.45, 0.03)
soil = np.zeros(365); s = 0.0
for i in range(365):
s = 0.0 if rain[i] else min(s + 0.0025, 0.12)
soil[i] = s
pr = 0.80 * (1 - soil) * (1 + rng.normal(0, 0.02, 365))
pr[250:272] *= 0.5
e = kwp * h * pr
return d, h.round(2), e.round(1), rain
def dry_days(rain, wash_after=None):
"""Days since the last rain (or wash, if a wash follows every `wash_after` dry days)."""
out, count, washes = np.zeros(len(rain), int), 0, 0
for i in range(len(rain)):
count = 0 if rain[i] else count + 1
if wash_after and count > wash_after:
count, washes = 1, washes + 1
out[i] = count
return out, washes
KWP, VALUE, WASH_COST = 9.9, 22.0, 800.0 # kWp, currency units per kWh and per wash
H_DESIGN, F_SOIL = 5.5, 0.97
PR_TABLE = 0.914 * 0.97 * 0.98 * F_SOIL * 0.97 * 0.97 * 0.995 * 0.99
SENSOR, METER = 0.03, 0.01 # assumed uncertainty of the two instruments
d, h, e, rain = year_of_yield()
pr = e / (KWP * h)
fault = (d >= 250) & (d <= 271)
# ---------- Application 1, steps 1 to 3: layout, expected, measured ----------
print("Layout")
print(f" 18 x 550 W = {18 * 0.55:.1f} kWp; DC to AC ratio {KWP / 8:.2f}; "
f"string of 9: 467.3 V cold (limit 600), 332.6 V hot (range 150 to 500)")
e_design = KWP * H_DESIGN * 365 * PR_TABLE
e_light = KWP * h.sum() * PR_TABLE
short = e_design - e.sum()
print("Expected and measured")
print(f" loss table PR {PR_TABLE:.4f}; design year {H_DESIGN * 365:,.1f} kWh/m2, "
f"design output {e_design:,.0f} kWh")
print(f" measured: {h.sum():,.1f} kWh/m2 ({100 * (h.sum() / (H_DESIGN * 365) - 1):+.1f} %), "
f"{e.sum():,.0f} kWh, PR {e.sum() / (KWP * h.sum()):.3f}")
print(f" shortfall {short:,.0f} kWh ({100 * short / e_design:.1f} % of the design), "
f"{short * VALUE:,.0f} currency units")
# ---------- Step 4: the split ----------
part_light = e_design - e_light # same table, the light of this year
dry, _ = dry_days(rain)
use = ~fault & (dry <= 48)
m, c = np.polyfit(dry[use], pr[use], 1) # clean PR and slope of the soiling line
rate = -m / c
cap = 1 - pr[~fault & (dry > 48)].mean() / c
soil = np.minimum(rate * dry, cap)
lost_soil = (e * soil / (1 - soil)).sum()
allowed = e_light / F_SOIL * (1 - F_SOIL) # dust that the table already allows
ref = np.median(pr[236:250]) # frozen reference of the alarm rule
gap = KWP * h[250:272] * ref - e[250:272]
lost_fault = gap.sum()
rest = short - part_light - (lost_soil - allowed) - lost_fault
print("The split of the shortfall (kWh, share, currency units)")
print(f" soiling: rate {100 * rate:.3f} % a day, clean PR {c:.3f}, loss {lost_soil:.0f} kWh; "
f"the table allows {allowed:.0f} kWh")
for name, x in (("less light than the design year", part_light),
("soiling above the allowance", lost_soil - allowed),
("string fault, days 250 to 271", lost_fault),
("remainder", rest)):
print(f" {name:32s} {x:6.0f} {100 * x / short:5.1f} % {x * VALUE:7,.0f}")
print(f" sum {part_light + lost_soil - allowed + lost_fault + rest:,.0f} kWh; "
f"design in the light of this year {e_light:,.0f} kWh")
print(f" light counted at the measured PR instead: "
f"{KWP * (H_DESIGN * 365 - h.sum()) * e.sum() / (KWP * h.sum()):.0f} kWh")
# ---------- Step 5: uncertainty of each part ----------
u_light = KWP * h.sum() * SENSOR * PR_TABLE
u_meter = e.sum() * METER
lo, hi = [(e * np.minimum(r * dry, cap) / (1 - np.minimum(r * dry, cap))).sum()
for r in (0.00249, 0.00268)]
u_soil = max(lost_soil - lo, hi - lost_soil)
u_fault = lost_fault - e[250:272].sum()
u_rest = np.sqrt(u_light**2 + u_meter**2 + u_soil**2 + u_fault**2)
print("Uncertainty")
print(f" light: sensor at {100 * SENSOR:.0f} % gives +/- {u_light:.0f} kWh; "
f"energy meter at {100 * METER:.0f} % gives +/- {u_meter:.0f} kWh")
print(f" soiling with the rates of single dry spells: {lo:.0f} to {hi:.0f} kWh, "
f"+/- {u_soil:.0f} kWh")
print(f" fault: {lost_fault:.1f} kWh from the record, {e[250:272].sum():.1f} kWh as the "
f"other half, +/- {u_fault:.0f} kWh")
print(f" remainder {rest:.0f} +/- {u_rest:.0f} kWh; scatter of 2 % a day over the year "
f"+/- {0.02 * e.mean() * np.sqrt(365):.0f} kWh")
# ---------- Step 6: checks ----------
e_clean = KWP * h.sum() * c
print("Checks")
print(f" from the clean array: {e_clean:,.0f} - {lost_soil:.0f} - {lost_fault:.0f} = "
f"{e_clean - lost_soil - lost_fault:,.0f} kWh against {e.sum():,.0f} measured "
f"({e_clean - lost_soil - lost_fault - e.sum():+.0f})")
print(f" clean PR {c:.3f} against {PR_TABLE / F_SOIL:.3f} in the table: "
f"{e_light / F_SOIL * (1 - c / (PR_TABLE / F_SOIL)):.0f} kWh of the remainder")
true_soil = np.minimum(0.0025 * dry, 0.12) # the rule that generated the record
print(f" soiling with the true rule of the generator: "
f"{(e * true_soil / (1 - true_soil)).sum():.0f} kWh")
bright = h > 5.5
clip = (e[bright] * 0.0155 * (h[bright] - 5.5)).sum()
print(f" days above 5.5 peak sun hours: {bright.sum()}, with {e[bright].sum():,.0f} kWh; "
f"clipping by a straight line through the two known days: about {clip:.0f} kWh")
# ---------- Application 2: the value of each action ----------
print("Actions (currency units)")
age, washes = dry_days(rain, wash_after=30)
new = np.minimum(rate * age, cap)
gain = (e * ((1 - new) / (1 - soil) - 1)).sum()
print(f" alarm and repair in two days: {gap[3:].sum():.1f} kWh, "
f"{gap[3:].sum() * VALUE:,.0f} for a fault like this one")
print(f" wash after 30 dry days: {washes} washes, {gain:.0f} kWh, "
f"net {gain * VALUE - washes * WASH_COST:,.0f} a year")
print(f" night gap of the battery day: 1.60 kWh x 365 = {1.60 * 365:.0f} kWh, "
f"{1.60 * 365 * VALUE:,.0f} a year if every day were the clear day")
print(f" 50 Ah more battery: {50 * 51.2 / 1000 * 30000:,.0f}, paid back in "
f"{50 * 51.2 / 1000 * 30000 / (1.60 * 365 * VALUE):.1f} years at that value")
print(f" soiling and fault together cost {(lost_soil + lost_fault) * VALUE:,.0f}; the alarm "
f"and the wash recover {gap[3:].sum() + gain:.0f} kWh of the {short:,.0f} kWh")
print("The battery day (results of the battery lesson, kWh)")
print(f" clear day: array 42.47 = load {(30 - 1.60) / 0.97:.2f} + battery loss 1.04 + spilled "
f"12.15; PR of the energy taken {(42.47 - 12.15) * 0.97 / (KWP * 5.5):.3f}")
print(f" load {30 * 365:,} kWh a year; array above the load by "
f"{e.sum() - 30 * 365:,.0f} kWh; battery loss 1.04 x 365 = {1.04 * 365:.0f} kWh")
# ---------- Plot ----------
steps = (("design", e_design), ("less light", -part_light),
("extra soiling", -(lost_soil - allowed)), ("fault", -lost_fault),
("remainder", -rest), ("measured", e.sum()))
fig, ax = plt.subplots(figsize=(8, 4.5))
level = 0.0
for i, (name, x) in enumerate(steps):
if name in ("design", "measured"):
ax.bar(i, x, color="tab:blue"); level = x
else:
ax.bar(i, -x, bottom=level + x, color="tab:red"); level += x
ax.set_xticks(range(len(steps)))
ax.set_xticklabels([s[0] for s in steps])
ax.set_ylim(13500, 16000)
ax.set_ylabel("energy of the year (kWh)")
ax.set_title("From the design to the meter: where 1,255 kWh went")
fig.tight_layout()
fig.savefig("solar_audit.png", dpi=120)
print("Saved solar_audit.png")

Expected output

Layout
18 x 550 W = 9.9 kWp; DC to AC ratio 1.24; string of 9: 467.3 V cold (limit 600), 332.6 V hot (range 150 to 500)
Expected and measured
loss table PR 0.7811; design year 2,007.5 kWh/m2, design output 15,524 kWh
measured: 1,933.3 kWh/m2 (-3.7 %), 14,269 kWh, PR 0.746
shortfall 1,255 kWh (8.1 % of the design), 27,609 currency units
The split of the shortfall (kWh, share, currency units)
soiling: rate 0.254 % a day, clean PR 0.801, loss 599 kWh; the table allows 462 kWh
less light than the design year 574 45.7 % 12,618
soiling above the allowance 137 10.9 % 3,010
string fault, days 250 to 271 436 34.7 % 9,586
remainder 109 8.7 % 2,395
sum 1,255 kWh; design in the light of this year 14,951 kWh
light counted at the measured PR instead: 547 kWh
Uncertainty
light: sensor at 3 % gives +/- 449 kWh; energy meter at 1 % gives +/- 143 kWh
soiling with the rates of single dry spells: 590 to 625 kWh, +/- 25 kWh
fault: 435.7 kWh from the record, 420.9 kWh as the other half, +/- 15 kWh
remainder 109 +/- 472 kWh; scatter of 2 % a day over the year +/- 15 kWh
Checks
from the clean array: 15,340 - 599 - 436 = 14,305 kWh against 14,269 measured (+36)
clean PR 0.801 against 0.805 in the table: 73 kWh of the remainder
soiling with the true rule of the generator: 579 kWh
days above 5.5 peak sun hours: 150, with 6,673 kWh; clipping by a straight line through the two known days: about 72 kWh
Actions (currency units)
alarm and repair in two days: 372.0 kWh, 8,185 for a fault like this one
wash after 30 dry days: 4 washes, 282 kWh, net 3,007 a year
night gap of the battery day: 1.60 kWh x 365 = 584 kWh, 12,848 a year if every day were the clear day
50 Ah more battery: 76,800, paid back in 6.0 years at that value
soiling and fault together cost 22,769; the alarm and the wash recover 654 kWh of the 1,255 kWh
The battery day (results of the battery lesson, kWh)
clear day: array 42.47 = load 29.28 + battery loss 1.04 + spilled 12.15; PR of the energy taken 0.540
load 10,950 kWh a year; array above the load by 3,319 kWh; battery loss 1.04 x 365 = 380 kWh
Saved solar_audit.png

The sensors and the daily record that an audit like this needs are described in the monitoring lesson linked above.

Common Mistakes



  • Calling the whole shortfall a fault of the system. Almost half of it here was light, which no repair recovers. Form the expected energy with the measured light first.
  • Counting soiling twice. The design table already allows 3 percent. Only the soiling above the allowance is a shortfall against the design.
  • Giving the remainder a name, or adjusting another part until it disappears. A remainder of 109 kWh with an uncertainty of 472 kWh is not “degradation”. It is not different from zero.
  • Forgetting the sensor. The light part and the remainder are only as good as the irradiance sensor.
  • Stopping at the inverter output. The performance ratio says nothing about energy that was spilled or bought at night. Follow the energy to the load.
  • Ranking actions by value without the evidence. A large value from a model asks for a measurement first.

Summary



  • The site gave 14,269 kWh against a design of 15,524 kWh: a shortfall of 1,255 kWh, worth 27,609 currency units.
  • The split adds up: 574 kWh of less light, 137 kWh of soiling above the allowance (599 kWh in all), 436 kWh for the string fault and a remainder of 109 kWh.
  • The soiling and the fault are known to within 25 and 15 kWh, because they compare the array with itself. The light and the remainder carry the sensor uncertainty, about 450 kWh at 3 percent.
  • The ranked actions are a month of battery measurement (up to 12,848 currency units a year, from a model), a latched alarm (8,185 for a fault like this one) and a wash after 30 dry days (3,007 a year).

Exercises



1. An array of 6.6 kWp was designed for 5.2 peak sun hours a day and a table performance ratio of 0.79. In one year the sensor measured 1,810 kWh/m² and the meter 8,700 kWh. Find the design energy, the shortfall, the part that belongs to the light and the part that belongs to the system.

Answer

Design: kWh. Shortfall: kWh. Light: kWh. System: kWh. The measured performance ratio is .

2. A loss table has a soiling factor of 0.96. With the measured light the table gives 20,000 kWh. The record shows a soiling loss of 1,100 kWh. How much of it is a shortfall against the design?

Answer

Without soiling the table gives kWh, so it allows kWh. The shortfall from soiling is kWh.

3. An array of 30 kWp received 1,750 kWh/m² by a sensor with an uncertainty of 2 percent. The table performance ratio is 0.80. Find the uncertainty of the expected energy. Is a remainder of 500 kWh a finding?

Answer

kWh. The remainder is smaller than the uncertainty of the sensor alone, so it cannot be told from zero.

4. Energy is worth 18 currency units per kWh. Action A saves 900 kWh a year and costs 6,000 a year. Action B saves 400 kWh a year and costs nothing. Action C saves 1,500 kWh a year and costs 21,000 a year. Rank them by net value.

Answer

A: . B: . C: . The order is A, B, C. The action that saves the most energy is last.

5. Audit the first 181 days of year_of_yield() (days 0 to 180) against the design of 5.5 peak sun hours and a table performance ratio of 0.7811. Use a soiling rate of 0.254 percent a day up to 12.9 percent. Split the shortfall into light, soiling above the 3 percent allowance and a remainder.

Answer

Design: 7,698 kWh. Measured: 7,540 kWh from 997.3 kWh/m², a performance ratio of 0.764. Shortfall: 158 kWh. Light: kWh, because this half year had slightly more light than the design (995.5 kWh/m²). Soiling: 376 kWh in the record against 239 kWh allowed, so 138 kWh. Remainder: kWh. A part of a split can be negative, and the parts still add up.

References



  • G. M. Masters, Renewable and Efficient Electric Power Systems, 2nd edition, Wiley, 2013.
  • R. A. Messenger and A. Abtahi, Photovoltaic Systems Engineering, 4th edition, CRC Press, 2017.
  • IEC 61724-1, Photovoltaic system performance, Part 1: Monitoring (named here as the standard for the measurements and the performance ratio that an audit uses).


© 2021-2026 SiliconWit®. All rights reserved.
Predict first

The design promised 15,524 kWh. The meter shows 14,269 kWh, 1,255 kWh short. The irradiance sensor shows that the year had 3.7 percent less light than the design year. How much of the shortfall is the weather?

designreal lightmeter 15,524 kWh14,950 kWh14,269 kWh weather 574: no repairsystem 682: find the causes Same table, real light: the line between the two arguments.
lightsoiling, extrafaultremainder 574 ± 449137 ± 25436 ± 15109 ± 472 0 kWh Firm: they compare the array with itself.
Try it: split the shortfall, then doubt the sensor

Light part (weather)
Fault part
Remainder

The numbers are the audit of the site in Application 1: design 15,524 kWh, meter 14,269 kWh, a loss table of 0.7811 and 1,933.3 kWh/m² of measured light. The bars start at 13,500 kWh so that the steps can be seen. Move the sensor error: only the parts that compare the meter with the sensor move. The soiling and the fault compare the array with itself, so a sensor error cancels in them.

Check yourself

Three questions. Each wrong choice is a mistake people really make, so read the note after you answer.

1. The next year the sensor in the array plane measures 2,050 kWh/m², more than the design year, and the meter shows 15,300 kWh. The design is still 15,524 kWh with a loss table of 0.7811 on 9.9 kWp. How much did the system itself fall short of what the light allowed?

2. In another year the sawtooth of the daily performance ratio shows a soiling loss of 650 kWh. The table, in the measured light without its soiling factor, gives 15,413 kWh, and its soiling factor is 0.97. What soiling belongs in the split of the shortfall?

3. After the report, the irradiance sensor is found to read 3 percent high all year. Which parts of the split change?

Watch it build: two expected values and the meter
9.9 kWp 18 × 550 W, from labels and drawings.Built with 17: 5.6 % short already. design15,524 bars start at 13,000 kWh real light14,950 meter14,269 weather 574 system 681
  1. First the paper: 18 modules of 550 W, 9.9 kWp. Built with 17, the array is 5.6 % short.
  2. The design expects 15,524 kWh: the table's 0.781 × 9.9 kWp × 5.5 h × 365 days.
  3. The same table with the light that really came: 14,950 kWh.
  4. The meter gave 14,269 kWh. 574 kWh is weather, no repair recovers it; 681 kWh is the system.
1 what is installed modules, strings inverter, battery 2 what light came sensor in the array plane 3 what it should give loss table × light kWh 4 what it gave (meter) 5 shortfall by cause 6 what was used on site 7 report and actions
The steps of a yearly audit
light 574 kWh, 45.7 % less light than the design year soiling 137 kWh, 10.9 % above the allowance fault 436 kWh, 34.7 % string fault, days 250 to 271 remainder 109 kWh, 8.7 % what the record cannot separate total 1,255 kWh = 574 + 137 + 436 + 109 (parts rounded)
The shortfall of 1,255 kWh by cause
array 42.47 29.28 load, directly or through the battery 1.04 lost in the battery 12.15 spilled: battery full, no export grid 1.60 load before sunrise (AC)
The clear battery day (kWh of direct current)