Skip to content
You Start with one site
Amounts in Start with one site
Industries · Server rooms and equipment rooms

The cooling fails on a Saturday. The room heats for hours before a server shuts itself down, and on Monday the system is off.

For iT managers, facilities managers, and banks, SACCOs and hospitals with their own room.

When it is found today

When the systems stop, or when staff arrive.

Who asks you for proof

The board and the regulator, on hours of service lost and what was done to prevent it.

What is measured
  • Room temperature and humidity
  • Cooling units running
  • Backup power: charge and time left
  • Mains quality
  • Water on the floor
Act

Your rules, working when you are not there

WhenWhat happensWho is called
The room is above its limit and one cooling unit has stoppedThe standby unit startsIT manager, at once
The room is on battery and less than twenty minutes remainSystems are shut down in the order you setIT manager, at once
For each rule you choose how much reaches you
  1. Tell me You decide and you act
  2. Ask me first It waits for your yes
  3. Do it and tell me It acts, then reports
  4. Do it quietly It acts. It is in the record

A rule never restarts a machine near people and never opens a gas valve again. A person on site does that. The equipment on site keeps protecting if the internet fails. Every rule has a manual override, every action is written into your record, and anything that switches power is fitted by a licensed electrician.

The record

What you hold at the end of every month

  • Hours the room stayed in range
  • Every power event, with how long the battery carried it
  • Cooling failures, and how each was caught
SiliconWit
Monthly record
Example
SiteRooftop solar plant, 100 kWp
Period1 to 31 October 2026
Lost this month
KSh3,400USD26
170 kWh, two events
Loss avoided
KSh23,400USD180
fault repaired in 2 days, not 20
Output against expected
98.6%
11,920 of 12,090 kWh
Energy produced each day, kWhExpected 390 kWh
1 Oct: 390 kWh2 Oct: 390 kWh3 Oct: 390 kWh4 Oct: 390 kWh5 Oct: 390 kWh6 Oct: 390 kWh7 Oct: 390 kWh8 Oct: 390 kWh9 Oct: 390 kWh10 Oct: 390 kWh11 Oct: 390 kWh12 Oct: 350 kWh13 Oct: 325 kWh14 Oct: 365 kWh15 Oct: 390 kWh16 Oct: 390 kWh17 Oct: 390 kWh18 Oct: 390 kWh19 Oct: 390 kWh20 Oct: 390 kWh21 Oct: 350 kWh22 Oct: 390 kWh23 Oct: 390 kWh24 Oct: 390 kWh25 Oct: 390 kWh26 Oct: 390 kWh27 Oct: 390 kWh28 Oct: 390 kWh29 Oct: 390 kWh30 Oct: 390 kWh31 Oct: 390 kWh 12 to 14 Oct: one string out21 Oct: grid outage 1 Oct 15 31 Oct

1What happened

WhenEventResponse
12 Oct, 10:40String 4 stopped producing. Output fell by one sixth.Site manager notified at 10:41.
14 Oct, 11:15Fuse replaced. Output returned to normal.Closed by the site manager.
Figures are an example, at KSh 20USD 0.15 per kWh. Page 1 of 1
Is it worth it

Decide with your own numbers

Your numbers

Example figures. Replace them with yours. Nothing you type leaves this page. Amounts in

The cost of doing nothing
USD0
a year, on your own figures
Failures, averaged over three years
0
Steady loss, twelve months
0
Each year
0

Send on WhatsApp
Evidence

The evidence is open to you

Running now

Reference devices on siliconwit.io. They are run by SiliconWit to show the service. They are not customer sites.

Server room coolingInternal temperature · Peak internal temperature · Compressor duty UPS and power qualitySupply voltage · Minimum voltage · Frequency

Start with one site.