Skip to content
You Start with one site
Amounts in Start with one site
Industries · Hotels, schools and hospitals

Energy and water are your largest cost after pay. The boiler and the laundry use the most, and you learn about all of it thirty days late.

For general managers, chief engineers, bursars and estates managers.

When it is found today

On the bill, a month after the money was spent.

Who asks you for proof

The board or the owner. For a school, the parents. For a hospital, the inspector.

What is measured
  • Kitchen cold rooms
  • Boiler and hot water
  • Laundry
  • Borehole and tanks
  • Generator
Act

Your rules, working when you are not there

WhenWhat happensWho is called
Gas is detected in the kitchenThe gas valve closes and the fans startChief engineer, at once
The laundry or boiler runs after the last loadIt is switched offNobody. It is in the record
For each rule you choose how much reaches you
  1. Tell me You decide and you act
  2. Ask me first It waits for your yes
  3. Do it and tell me It acts, then reports
  4. Do it quietly It acts. It is in the record

A rule never restarts a machine near people and never opens a gas valve again. A person on site does that. The equipment on site keeps protecting if the internet fails. Every rule has a manual override, every action is written into your record, and anything that switches power is fitted by a licensed electrician.

The record

What you hold at the end of every month

  • Cost for each room night, bed or student
  • The three largest users, month against month
  • What to fix first
SiliconWit
Monthly record
Example
SiteApartment block, 48 units
Period1 to 31 October 2026
Power cuts covered
14 of 14
generator ran 31 hours
Water pumped
610 m³
pump ran 102 hours
Common area electricity
KSh84,200USD648
4,210 kWh
Generator hours each day, hours
1 Oct: 0 hours2 Oct: 3 hours3 Oct: 0 hours4 Oct: 2.7 hours5 Oct: 0 hours6 Oct: 1.5 hours7 Oct: 0 hours8 Oct: 0 hours9 Oct: 3.2 hours10 Oct: 0 hours11 Oct: 2 hours12 Oct: 1.7 hours13 Oct: 0 hours14 Oct: 2.5 hours15 Oct: 1 hours16 Oct: 0 hours17 Oct: 0 hours18 Oct: 2.8 hours19 Oct: 0 hours20 Oct: 3.5 hours21 Oct: 0 hours22 Oct: 1.8 hours23 Oct: 1.5 hours24 Oct: 0 hours25 Oct: 2.6 hours26 Oct: 1.2 hours27 Oct: 0 hours28 Oct: 0 hours29 Oct: 0 hours30 Oct: 0 hours31 Oct: 0 hours 4 Oct: 2 h 40 min20 Oct: longest, 3 h 30 min 1 Oct 15 31 Oct

1What happened

WhenEventResponse
4 Oct, 19:12Mains failed for 2 hours 40 minutes.Generator started in 12 seconds.
17 Oct, 02:00Corridor lighting found on all night, every night.Timer corrected by the caretaker on 18 Oct.
Figures are an example. Page 1 of 1
Is it worth it

Decide with your own numbers

Your numbers

Example figures. Replace them with yours. Nothing you type leaves this page. Amounts in

The cost of doing nothing
USD0
a year, on your own figures
Failures, averaged over three years
0
Steady loss, twelve months
0
Each year
0

Send on WhatsApp
Evidence

The evidence is open to you

Worked cases

One failure each: what happened, what it cost, and what would have shown it earlier.

A Detector That Reads Zero: Working, or Finished?

Start with one site.