Industries · Compressed air

Everyone says there are leaks. Nobody can say what they cost, so nobody has fixed them.

For maintenance managers, and the finance director who sees the number.

When it is found today

Never. The compressor runs all night for nobody, and the bill looks normal.

Who asks you for proof

Nobody outside asks. The money is the whole argument.

What is measured
  • Compressor load
  • Line pressure
  • One night with the plant closed
Act

Your rules, working when you are not there

WhenWhat happensWho is called
The plant closes for the nightThe compressor is shut off, and started before the first shiftNobody. It is in the record
Pressure falls when nothing is being madeThe leak is logged with what it costsMaintenance manager, each week
For each rule you choose how much reaches you
  1. Tell me You decide and you act
  2. Ask me first It waits for your yes
  3. Do it and tell me It acts, then reports
  4. Do it quietly It acts. It is in the record

A rule never restarts a machine near people and never opens a gas valve again. A person on site does that. The equipment on site keeps protecting if the internet fails. Every rule has a manual override, every action is written into your record, and anything that switches power is fitted by a licensed electrician.

The record

What you hold at the end of every month

  • Leaks as a share of the compressor bill
  • Shillings a year
  • A list of fixes, largest first
SiliconWit
Monthly record
Example
SiteProduction line, 22 kW drive motor
Period1 to 31 October 2026
Stops from failure
0
the line ran 412 hours
At risk
KSh800,000USD6,154
one motor failure and the stopped line
Vibration at its highest
5.5 mm/s
against a limit of 5.0
Vibration each day, mm/sLimit 5.0 mm/s
1 Oct: 4.1 mm/s2 Oct: 4.2 mm/s3 Oct: 5.1 mm/s4 Oct: 5.1 mm/s5 Oct: 5.2 mm/s6 Oct: 5.1 mm/s7 Oct: 5.2 mm/s8 Oct: 5.3 mm/s9 Oct: 5.2 mm/s10 Oct: 5.3 mm/s11 Oct: 5.3 mm/s12 Oct: 5.4 mm/s13 Oct: 5.3 mm/s14 Oct: 5.4 mm/s15 Oct: 5.4 mm/s16 Oct: 5.5 mm/s17 Oct: 5.4 mm/s18 Oct: 5.5 mm/s19 Oct: 3.2 mm/s20 Oct: 3.1 mm/s21 Oct: 3.2 mm/s22 Oct: 3.1 mm/s23 Oct: 3.2 mm/s24 Oct: 3.1 mm/s25 Oct: 3.2 mm/s26 Oct: 3.2 mm/s27 Oct: 3.1 mm/s28 Oct: 3.2 mm/s29 Oct: 3.1 mm/s30 Oct: 3.2 mm/s31 Oct: 3.2 mm/s 3 Oct: limit passed19 Oct: bearing replaced 1 Oct 15 31 Oct

1What happened

WhenEventResponse
3 Oct, 14:20Vibration passed the limit you set. It had risen for nine weeks.Maintenance manager notified at 14:21.
19 Oct, 06:00Bearing replaced at the planned stop. Two hours.Closed by the maintenance manager.
Figures are an example. Page 1 of 1
Is it worth it

Decide with your own numbers

Your numbers

Example figures. Replace them with yours. Nothing you type leaves this page. Amounts in

The cost of doing nothing
USD0
a year, on your own figures
Failures, averaged over three years
0
Steady loss, twelve months
0
Each year
0

Send on WhatsApp
Evidence

The evidence is open to you

Running now

Reference devices on siliconwit.io. They are run by SiliconWit to show the service. They are not customer sites.

Plant air compressorPower draw · Load · Bearing temperature

Worked cases

One failure each: what happened, what it cost, and what would have shown it earlier.

The Load That Runs When Nobody Is There

Start with one site.