1What happened
| When | Event | Response |
|---|---|---|
| 3 Oct, 14:20 | Vibration passed the limit you set. It had risen for nine weeks. | Maintenance manager notified at 14:21. |
| 19 Oct, 06:00 | Bearing replaced at the planned stop. Two hours. | Closed by the maintenance manager. |
For plant managers, production managers and energy managers.
Waste is found thirty days late, as one number on a bill.
The energy regulator asks a large facility to show that audit savings were achieved. That cannot be shown without measurement.
| When | What happens | Who is called |
|---|---|---|
| Demand comes near the limit on your tariff | The loads you chose are held back for ten minutes | Nobody. It is in the record |
| Vibration on a motor rises for three weeks | A repair is raised before the motor fails | Maintenance manager |
A rule never restarts a machine near people and never opens a gas valve again. A person on site does that. The equipment on site keeps protecting if the internet fails. Every rule has a manual override, every action is written into your record, and anything that switches power is fitted by a licensed electrician.
1What happened
| When | Event | Response |
|---|---|---|
| 3 Oct, 14:20 | Vibration passed the limit you set. It had risen for nine weeks. | Maintenance manager notified at 14:21. |
| 19 Oct, 06:00 | Bearing replaced at the planned stop. Two hours. | Closed by the maintenance manager. |
Reference devices on siliconwit.io. They are run by SiliconWit to show the service. They are not customer sites.
Production line drive motorPower draw · Load · Bearing temperature→ Injection moulding machinePower draw · Load · Bearing temperature→ CNC machine toolPower draw · Load · Bearing temperature→ Steam boiler feed pumpPower draw · Load · Bearing temperature→ UPS and power qualitySupply voltage · Minimum voltage · Frequency→One failure each: what happened, what it cost, and what would have shown it earlier.
The Bearing Told Us in May: Reading a Vibration Trend→The Machine Was Never Off, and Still Lost a Shift: CNC Utilisation and What It Does to Your Quoting→Counting the Wrong Events: 1,148 Sags and 63 Outages→