A site can hold two years of weekly vibration readings and still lose a motor without warning, because nobody decided which number means “look” and which means “stop”. The opposite failure is as common: limits set so tight that the alarm sounds every month, until the staff stop listening to it. A reading has meaning only beside the machine’s own history, taken at the same speed and load. This lesson shows how to set a baseline and limits from that history, how to read the rise when it comes, and how far ahead the trend lets you see. #ConditionMonitoring #VibrationTrending #AlarmLimits

Learning Objectives

By the end of this lesson, you will be able to:

  1. Set a baseline and alert and danger limits from a machine’s own readings by two methods
  2. Find the week each limit is crossed and count the false alarms a limit would raise
  3. Fit an exponential rise to estimate the growth rate and the time left, with a range
  4. Explain why readings at different speeds or loads must not share one baseline
  5. Calculate how little a growing bearing line changes the overall level, and set band alarms to catch it

Real-World System Problem: A weekly reading on a compressor motor



A 22 kW motor drives a compressor at 1465 rev/min. Each week a technician measures the overall velocity at point A2H, horizontal on the drive-end bearing housing, and writes it in a book: 0.84, 0.81, 0.87, 0.90 and so on, all far below any limit in a published table.

After 26 weeks the reading is 2.12 mm/s RMS: still inside the range example tables call acceptable for long service, but more than twice what this machine gave for its first four months, and rising faster each week.

The technician needs four things from the book: the normal level of this point, a line that means “look closer”, a line that means “act”, and an estimate of the weeks between the two.

New readingBaseline(first 12)Above a limit?Rising? How fast?Alert and dangerlimitsweekly reading at A2H (same speed, same load)inspectplan
From a column of readings to a decision

Fundamental Theory: Limits from the machine’s own history



The baseline

A baseline is the level of one measurement point, in one direction, when the machine is known to be in good condition, at a stated speed and load. Points A2H and A2V on the same bearing have different baselines.

One reading is a poor baseline: every reading carries scatter from the sensor placing, the load and the moment of the record. Take the mean of several readings, and keep their standard deviation as the measure of the scatter.

Baseline and scatter from the first readings

Here is reading number , is the number of readings used, is the baseline and is the sample standard deviation.

Take a new baseline after any repair, alignment or balancing, and after any change to the sensor, its mounting or the settings.

Three kinds of limit

Absolute limits come from a standard or the machine’s maker. The standard sorts the overall velocity into zones A to D, with boundaries that depend on the machine group, power and foundation. As an example only, the boundaries commonly quoted for group 2 machines (15 to 300 kW) on rigid foundations, from ISO 10816-3:2009, are about 1.4, 2.8 and 4.5 mm/s RMS: check the standard for your machine class, because the standard decides. An absolute limit is the right tool with no history, and it stays as a ceiling, but it cannot see a machine that has doubled its vibration below the boundary.

Multiples of the baseline are common practice in industry: typically an alert at 1.6 times the baseline and a danger limit at 2.5 times (common practice figures, not from a standard; a site may choose others). They are simple and follow the machine, but ignore the scatter: a very steady point could be watched more closely.

Statistical limits use the scatter itself. The alert is placed at the mean plus three standard deviations.

The standard for industrial machines joins the two ideas. ISO 10816-3:2009, as commonly quoted, suggests an alarm at the baseline plus 25 percent of the zone B/C boundary, normally not above 1.25 times that boundary, and a trip normally not above 1.25 times the zone C/D boundary. On the example boundaries that is an alarm at mm/s for the motor below, and a trip of at most mm/s. Check the current edition (ISO 20816-3:2022) for your machine before you use these factors.

Alert and danger limits used in this lesson

The factors 1.6 and 2.5 are common practice figures. The danger limit is never set above the absolute limit for the machine class.

mm/so2.5xdangerooo1.6xalert (a)oo+3salert (b)o1.0xooooooooooobaselineweeks
A trend against its own limits

False alarms and their cost

A false alarm is a reading above a limit on a machine that has not changed. With normally distributed readings, about 0.13 percent of healthy readings cross a limit at three standard deviations. When the mean and the scatter come from only 12 readings, the true chance is higher, about 0.75 percent. A limit at two standard deviations would be crossed by about 4 percent of healthy readings, which is two false alarms a year at one point read weekly.

Each false alarm costs a visit and some confidence, and a site with an alarm every week learns to ignore alarms, as people do with a smoke alarm that rings for the toast. Two habits help: repeat a reading that crosses the alert before acting, or ask for two readings in a row above the limit; a real fault stays above it, a chance value does not. A missed alarm usually costs far more, so the limit is a choice between the two.

Rate of change

A trend plot is the reading against time, with the baseline and the limits drawn across it. A level of 1.3 mm/s that has been steady for a year is a different machine from one that was 0.9 mm/s a month ago.

One week-to-week difference is a poor measure of the slope: if each reading has a standard deviation , the difference of two has , here , while a rise of 9 percent in a week is only 0.079 mm/s. So the slope is taken from a line fitted through several readings.

Estimating the time left

Many kinds of damage grow faster as they grow. A simple model is exponential growth: the level is multiplied by the same factor each week.

Exponential growth and the week a limit is reached

Here is the week number, is the growth rate per week, , is the limit, and and are the means of the weeks and of the logarithms used in the fit. The growth in percent per week is .

A straight line fitted to gives and its standard error. A range for the crossing week follows from plus and minus two standard errors.

Compare like with like

Vibration depends on the operating state. An unbalance force grows with the square of the speed, load changes the forces in bearings, gears and couplings, and temperature moves the alignment.

The rule is simple: same point, same direction, same speed, same load. Where the machine has several normal states, keep a baseline and limits for each state, and write the state beside every reading.

Band alarms

The overall level is dominated by its largest component, so a fault that begins as a small line elsewhere hardly moves it. A band alarm divides the spectrum into bands, each with its own baseline and limits.

mm/s1x2xbearing bandsBPFOBPFIhigh band▪▪Hz222746.5 51.5 72.7 75.6 118.8 123.6 2001000
Bands on the spectrum of the compressor motor

For this motor the bands are placed round 1× (24.42 Hz), round 2× (48.84 Hz), round the calculated outer-race frequency BPFO (74.15 Hz) and inner-race frequency BPFI (121.19 Hz), and over the high-frequency region. The bearing bands are 2 percent wide on each side, because a real bearing line may sit 1 to 2 percent from the calculated value.

A band is not a diagnosis. The BPFO band of this motor also holds 3× running speed at 73.26 Hz, so a rise in it is consistent with an outer-race defect and also with a growing third harmonic. The alarm says where to look, and a person then reads the spectrum. Fix the band edges in orders of running speed, so that they follow the speed.

Application 1: Limits and time left for the compressor motor



Step 1: Baseline and limits from the first 12 readings

Click to reveal the baseline and the limits
  1. Baseline. The first 12 readings add to 10.53.

    The baseline is 0.877 mm/s RMS. ✅

  2. Scatter. The sample standard deviation of the same 12 readings is , which is 5.3 percent of the baseline. ✅

  3. Method (a): multiples of the baseline.

    The alert is at 1.404 mm/s and the danger limit at 2.194 mm/s. ✅

  4. Method (b): statistical alert.

    The statistical alert is at 1.018 mm/s, which is 1.16 times the baseline. ✅

Step 2: When each limit is crossed

Click to reveal the crossings and the false alarms
  1. Statistical alert (b). Week 18 reads 0.99, below 1.018. Week 19 reads 1.11. The first crossing is in week 19. ✅

  2. Multiple alert (a). Week 21 reads 1.32, below 1.404. Week 22 reads 1.50. The first crossing is in week 22, three weeks later than method (b). ✅

  3. Danger limit. Week 26 reads 2.12, below 2.194. The danger limit has not yet been crossed. ✅

  4. False alarms in weeks 1 to 16. The highest reading in those weeks is 0.96 (weeks 10 and 14). It is below both alerts, so neither method raised a false alarm in this record. ✅

  5. Over a longer time. At 0.75 percent for each reading, method (b) is expected to raise 0.39 false alarms in 52 weekly readings, about one in two and a half years. Method (a) sits 11 standard deviations above the baseline and would raise almost none. ✅

Step 3: Fit the rise and estimate the time left

Click to reveal the fit
  1. Take logarithms from the first alert onward. For weeks 19 to 26, is 0.104, 0.199, 0.278, 0.405, 0.476, 0.542, 0.658 and 0.751. The mean week is and the mean logarithm is . ✅

  2. Fit the straight line. The least-squares fit in the script gives

    The second figure is the standard error of the slope. ✅

  3. Growth rate.

    The level doubles every weeks. ✅

  4. Week the danger limit is reached. With :

    The fitted curve reaches the danger limit between the readings of week 26 and week 27. ✅

  5. Range. With the crossing is at week 26.2, and with it is at week 26.6. The range is week 26.2 to week 26.6. ✅

  6. Warning given by each method. From the first alert to week 26.4, method (b) gave weeks and method (a) gave weeks. ✅

Step 4: Check the estimate, and see how it changed

Click to reveal the checks
  1. A second method: two points. Use only weeks 19 and 26.

    The two-point estimate agrees with the fit. ✅

  2. The estimate as it stood earlier. With the readings of weeks 19 to 22 only, the fit gives 10.5 percent a week and week 25.9, with a range of 25.2 to 26.9. With weeks 19 to 24 it gives 9.5 percent a week and week 26.5, with a range of 26.1 to 27.0. The range narrowed from 1.7 weeks to 0.4 weeks as readings were added. ✅

  3. The hidden truth of the generator. The data were made as a steady 0.88 mm/s to week 16 with a scatter of 0.05 mm/s, then a rise of exactly 9 percent a week from week 17. The true curve reaches 2.194 mm/s at week 26.6. The fit found 9.6 percent and week 26.4, and the truth lies at the edge of the range. ✅

Application 2: The same bearing at two loads, and a band alarm



Step 1: A reading judged against the wrong baseline

Click to reveal the false fall and the false rise
  1. Read at 60 percent, judged at full load.

    A healthy machine appears to have improved by a fifth. ✅

  2. Read at full load, judged at 60 percent.

    A healthy machine appears to have become a quarter worse. This reading is above the statistical alert for the 60 percent state, . ✅

  3. A real fault that disappears. Suppose that a fault raises the level by 25 percent, and the reading is taken at 60 percent load: . Against the full load baseline this is percent. The fault is invisible. ✅

  4. Speed moves with load too. If the slip is taken as proportional to load, this motor turns at about 1479 rev/min at 60 percent load, which is 24.65 Hz. BPFO moves from 74.15 Hz to 74.85 Hz. Bands fixed in orders follow this change, and bands fixed in hertz do not. ✅

Step 2: One mixed baseline against a baseline for each state

Click to reveal the two baselines
  1. Mix the states. The script generates 12 readings, 6 at each load, with the stated scatter. Their mean is 0.810 mm/s and their standard deviation is 0.117 mm/s. ✅

  2. Limit from the mixed set.

    The load changes have entered the scatter and more than doubled it. ✅

  3. Limits for each state. With a scatter of 0.05 mm/s, the alert is at for 60 percent load and at for full load. ✅

  4. Compare the sensitivity. At 60 percent load the level must rise by 66 percent to cross the mixed limit of 1.159 mm/s. It must rise by only 21 percent to cross its own limit of 0.85 mm/s. ✅

Step 3: A bearing line that the overall level hides

Click to reveal the band levels
  1. Overall level before. The parts of the default signal have a mean square of 0.7675 (1× gives 0.720, 2× gives 0.045 and the noise 0.0025). Add the bearing line.

    The healthy overall level is 0.8763 mm/s. ✅

  2. Overall level after.

    The overall level has risen by 0.62 percent. ✅

  3. Compare with the scatter. The weekly readings scatter by 5.7 percent of the level. A rise of 0.62 percent is nine times smaller than one standard deviation, so no trend of the overall level can show it. ✅

  4. The band. The level in the band of 72.7 to 75.6 Hz goes from 0.020 to 0.100 mm/s, a factor of 5. With limits of 1.6 and 2.5 times the band’s own baseline, it crosses the alert at 0.032 mm/s and the danger limit at 0.050 mm/s. ✅

  5. Check with the generator. The script builds both signals and measures every band. The BPFO band reads 0.0203 and then 0.1002 mm/s, a ratio of 4.93. The overall level from the samples goes from 0.8756 to 0.8810 mm/s, a rise of 0.62 percent. All other bands are unchanged. ✅

BandBefore (mm/s RMS)After (mm/s RMS)Ratio
1×, 22.0 to 27.0 Hz0.84910.84911.00
2×, 46.5 to 51.5 Hz0.21270.21271.00
BPFO, 72.7 to 75.6 Hz0.02030.10024.93
BPFI, 118.8 to 123.6 Hz0.00270.00271.00
High, 200 to 1000 Hz0.02790.02791.00
Overall, 10 to 1000 Hz0.87610.88161.01

Verify It in Python



The script reproduces both applications. Its plot shows the trend with its limits and the band levels.

trend_baseline_alarm_limits.py
"""Baseline, alert and danger limits from a machine's own history, the time left
from a fitted trend, the effect of load, and band alarms."""
import numpy as np
from scipy import stats
import matplotlib.pyplot as plt
def machine_signal(fs=5120, seconds=4.0, fr=24.42, amp_1x=1.2, amp_2x=0.3,
others=(), noise=0.05, seed=5):
"""Vibration velocity in mm/s. amp_* are PEAK amplitudes in mm/s.
others: sequence of (frequency_hz, peak_amplitude_mm_s, phase_rad)."""
rng = np.random.default_rng(seed)
n = int(fs * seconds); t = np.arange(n) / fs
v = amp_1x * np.sin(2 * np.pi * fr * t) + amp_2x * np.sin(2 * np.pi * 2 * fr * t + 0.7)
for f, a, ph in others:
v = v + a * np.sin(2 * np.pi * f * t + ph)
return t, v + rng.normal(0.0, noise, n)
def first_week_above(weeks, values, limit):
above = weeks[values > limit]
return int(above[0]) if len(above) else None
# ---------- Application 1: 26 weekly readings at point A2H ----------
rng = np.random.default_rng(5)
weeks = np.arange(1, 27)
SCATTER = 0.05 # mm/s, standard deviation
hidden = np.where(weeks <= 16, 0.88, 0.88 * 1.09 ** (weeks - 16.0))
v = hidden + rng.normal(0.0, SCATTER, len(weeks))
print("Application 1: weekly overall velocity at A2H, mm/s RMS")
for start in (0, 13):
print(" weeks %2d to %2d: " % (start + 1, start + 13)
+ " ".join(f"{x:.2f}" for x in v[start:start + 13]))
base = v[:12].mean()
sd = v[:12].std(ddof=1)
alert_a, danger = 1.6 * base, 2.5 * base # common practice figures
alert_b = base + 3 * sd
print(f" baseline (mean of weeks 1 to 12): {base:.3f} mm/s, standard deviation {sd:.4f} mm/s")
print(f" (a) alert 1.6 x baseline: {alert_a:.3f} danger 2.5 x baseline: {danger:.3f} mm/s")
print(f" (b) alert mean + 3 sd: {alert_b:.3f} mm/s ({alert_b / base:.2f} x baseline)")
wk_a = first_week_above(weeks, v, alert_a)
wk_b = first_week_above(weeks, v, alert_b)
wk_d = first_week_above(weeks, v, danger)
print(f" first week above: alert (a) {wk_a}, alert (b) {wk_b}, danger {wk_d}")
print(f" false alarms in weeks 1 to 16: (a) {int(np.sum(v[:16] > alert_a))}, "
f"(b) {int(np.sum(v[:16] > alert_b))}, mean + 2 sd would give "
f"{int(np.sum(v[:16] > base + 2 * sd))}")
p3 = stats.t.sf(3 / np.sqrt(1 + 1 / 12), 11) # limit built from only 12 readings
p2 = stats.t.sf(2 / np.sqrt(1 + 1 / 12), 11)
print(f" chance that one healthy reading crosses: 3 sd {100 * p3:.2f} percent, "
f"2 sd {100 * p2:.2f} percent")
print(f" expected false alarms in 52 readings: 3 sd {52 * p3:.2f}, 2 sd {52 * p2:.2f}")
def fit_and_project(first, last):
"""Straight line through ln(v) for weeks first..last; week the danger limit is reached."""
sel = (weeks >= first) & (weeks <= last)
w, y = weeks[sel].astype(float), np.log(v[sel])
r = stats.linregress(w, y)
wbar, ybar = w.mean(), y.mean()
cross = lambda slope: wbar + (np.log(danger) - ybar) / slope
lo, hi = cross(r.slope + 2 * r.stderr), cross(r.slope - 2 * r.stderr)
return r, cross(r.slope), lo, hi, wbar, ybar
print(" fit of ln(v) = c + b x week, from the first alert (b) onward:")
for last in (22, 24, 26):
r, mid, lo, hi, wbar, ybar = fit_and_project(wk_b, last)
print(f" weeks {wk_b} to {last}: b = {r.slope:.4f} +/- {r.stderr:.4f} per week "
f"(growth {100 * (np.exp(r.slope) - 1):.1f} percent a week), "
f"danger at week {mid:.1f}, range {lo:.1f} to {hi:.1f}")
r, mid, lo, hi, wbar, ybar = fit_and_project(wk_b, 26)
print(f" mean week {wbar:.1f}, mean ln(v) {ybar:.4f}, ln(danger) {np.log(danger):.4f}")
print(f" doubling time {np.log(2) / r.slope:.1f} weeks")
print(f" warning before the projected danger week {mid:.1f}: "
f"(a) {mid - wk_a:.1f} weeks, (b) {mid - wk_b:.1f} weeks")
print(f" example zone boundary 2.8 mm/s would be reached at week "
f"{wbar + (np.log(2.8) - ybar) / r.slope:.1f}")
true_week = 16 + np.log(danger / 0.88) / np.log(1.09)
print(f" hidden truth: 9 percent a week from week 17; danger limit at week {true_week:.1f}")
print(f" two readings differ by chance with sd {SCATTER * np.sqrt(2):.3f} mm/s; "
f"a 9 percent step at {base:.2f} is {0.09 * base:.3f} mm/s")
# ---------- Application 2: the same bearing at two loads ----------
V60, V100 = 0.70, 0.88 # mm/s RMS, given
print("Application 2: one bearing, two loads")
print(f" read at 60 percent, judged on the full load baseline: "
f"{100 * (V60 / V100 - 1):+.1f} percent")
print(f" read at full load, judged on the 60 percent baseline: "
f"{100 * (V100 / V60 - 1):+.1f} percent")
fault60 = 1.25 * V60
print(f" a 25 percent rise at 60 percent load reads {fault60:.3f} mm/s: "
f"{100 * (fault60 / V100 - 1):+.1f} percent on the full load baseline")
slope = (V100 - V60) / 40.0
for load in (60, 80, 100):
print(f" baseline by straight line at {load} percent load: {V60 + slope * (load - 60):.3f} mm/s")
rng2 = np.random.default_rng(6)
state = rng2.integers(0, 2, 12) # 0 = 60 percent, 1 = full load
mixed = np.where(state == 1, V100, V60) + rng2.normal(0.0, SCATTER, 12)
m_mean, m_sd = mixed.mean(), mixed.std(ddof=1)
print(f" 12 mixed readings ({int(state.sum())} at full load): mean {m_mean:.3f}, "
f"sd {m_sd:.4f}, mean + 3 sd {m_mean + 3 * m_sd:.3f} mm/s")
print(f" separate baselines with sd {SCATTER}: alert at {V60 + 3 * SCATTER:.2f} (60 percent) "
f"and {V100 + 3 * SCATTER:.2f} mm/s (full load)")
print(f" rise needed at 60 percent load to cross: mixed limit "
f"{100 * ((m_mean + 3 * m_sd) / V60 - 1):.0f} percent, own limit "
f"{100 * ((V60 + 3 * SCATTER) / V60 - 1):.0f} percent")
# ---------- Band alarms ----------
FS, FR, BPFO = 5120, 24.42, 74.15
BANDS = (("1x", 22.0, 27.0), ("2x", 46.5, 51.5), ("BPFO", 72.7, 75.6),
("BPFI", 118.8, 123.6), ("high", 200.0, 1000.0), ("overall", 10.0, 1000.0))
def band_levels(x):
"""RMS in each band from a Hann-windowed spectrum. Dividing the power by the
mean of the squared window (0.375 for Hann) keeps the RMS of each band correct."""
n = len(x)
wdw = np.hanning(n)
f = np.fft.rfftfreq(n, 1.0 / FS)
power = 2.0 * np.abs(np.fft.rfft(x * wdw)) ** 2 / n ** 2 / np.mean(wdw ** 2)
return [np.sqrt(np.sum(power[(f >= lo) & (f <= hi)])) for _, lo, hi in BANDS]
print("Band alarms: a line at BPFO grows from 0.02 to 0.10 mm/s RMS")
ROOT2 = np.sqrt(2.0)
_, healthy = machine_signal(others=((BPFO, 0.02 * ROOT2, 0.0),))
_, faulty = machine_signal(others=((BPFO, 0.10 * ROOT2, 0.0),))
lv_h, lv_f = band_levels(healthy), band_levels(faulty)
print(" band Hz before after ratio")
for (name, lo, hi), a, b in zip(BANDS, lv_h, lv_f):
print(f" {name:<8} {lo:6.1f} to {hi:6.1f} {a:.4f} {b:.4f} {b / a:.2f}")
rms = lambda x: np.sqrt(np.mean(x ** 2))
print(f" overall from the samples: {rms(healthy):.4f} to {rms(faulty):.4f} mm/s, "
f"a rise of {100 * (rms(faulty) / rms(healthy) - 1):.2f} percent")
hand_h, hand_f = np.sqrt(0.7675 + 0.02 ** 2), np.sqrt(0.7675 + 0.10 ** 2)
print(f" overall by root sum of squares: {hand_h:.4f} to {hand_f:.4f} mm/s, "
f"a rise of {100 * (hand_f / hand_h - 1):.2f} percent")
print(f" scatter of the weekly readings: {100 * SCATTER / 0.88:.1f} percent of the level")
need = np.sqrt((1.6 * hand_h) ** 2 - 0.7675)
print(f" line needed to lift the overall level to 1.6 x: {need:.2f} mm/s RMS "
f"({need / 0.02:.0f} times its first value)")
# ---------- Plot ----------
fig, ax = plt.subplots(2, 1, figsize=(8, 8))
ax[0].plot(weeks, v, "o-", label="weekly reading")
ww = np.linspace(wk_b, 30, 50)
ax[0].plot(ww, np.exp(ybar + r.slope * (ww - wbar)), "--", label="fitted trend")
for level, text in ((base, "baseline"), (alert_b, "alert (b)"), (alert_a, "alert (a)"),
(danger, "danger")):
ax[0].axhline(level, linewidth=0.8, color="grey")
ax[0].text(0.6, level + 0.02, text, fontsize=8)
ax[0].set_xlabel("week"); ax[0].set_ylabel("overall velocity (mm/s RMS)")
ax[0].set_title("Point A2H: trend against its own limits"); ax[0].legend(loc="center left")
names = [b[0] for b in BANDS]
pos = np.arange(len(names))
ax[1].bar(pos - 0.2, lv_h, 0.4, label="before")
ax[1].bar(pos + 0.2, lv_f, 0.4, label="after")
ax[1].set_yscale("log"); ax[1].set_xticks(pos); ax[1].set_xticklabels(names)
ax[1].set_ylabel("band level (mm/s RMS)"); ax[1].set_title("Band levels"); ax[1].legend()
fig.tight_layout()
fig.savefig("trend_baseline_alarm_limits.png", dpi=120)
print("Saved trend_baseline_alarm_limits.png")

Expected output

Application 1: weekly overall velocity at A2H, mm/s RMS
weeks 1 to 13: 0.84 0.81 0.87 0.90 0.94 0.89 0.85 0.84 0.92 0.96 0.89 0.82 0.83
weeks 14 to 26: 0.96 0.89 0.79 0.96 0.99 1.11 1.22 1.32 1.50 1.61 1.72 1.93 2.12
baseline (mean of weeks 1 to 12): 0.877 mm/s, standard deviation 0.0468 mm/s
(a) alert 1.6 x baseline: 1.404 danger 2.5 x baseline: 2.194 mm/s
(b) alert mean + 3 sd: 1.018 mm/s (1.16 x baseline)
first week above: alert (a) 22, alert (b) 19, danger None
false alarms in weeks 1 to 16: (a) 0, (b) 0, mean + 2 sd would give 0
chance that one healthy reading crosses: 3 sd 0.75 percent, 2 sd 4.05 percent
expected false alarms in 52 readings: 3 sd 0.39, 2 sd 2.10
fit of ln(v) = c + b x week, from the first alert (b) onward:
weeks 19 to 22: b = 0.0995 +/- 0.0075 per week (growth 10.5 percent a week), danger at week 25.9, range 25.2 to 26.9
weeks 19 to 24: b = 0.0906 +/- 0.0042 per week (growth 9.5 percent a week), danger at week 26.5, range 26.1 to 27.0
weeks 19 to 26: b = 0.0921 +/- 0.0023 per week (growth 9.6 percent a week), danger at week 26.4, range 26.2 to 26.6
mean week 22.5, mean ln(v) 0.4268, ln(danger) 0.7855
doubling time 7.5 weeks
warning before the projected danger week 26.4: (a) 4.4 weeks, (b) 7.4 weeks
example zone boundary 2.8 mm/s would be reached at week 29.0
hidden truth: 9 percent a week from week 17; danger limit at week 26.6
two readings differ by chance with sd 0.071 mm/s; a 9 percent step at 0.88 is 0.079 mm/s
Application 2: one bearing, two loads
read at 60 percent, judged on the full load baseline: -20.5 percent
read at full load, judged on the 60 percent baseline: +25.7 percent
a 25 percent rise at 60 percent load reads 0.875 mm/s: -0.6 percent on the full load baseline
baseline by straight line at 60 percent load: 0.700 mm/s
baseline by straight line at 80 percent load: 0.790 mm/s
baseline by straight line at 100 percent load: 0.880 mm/s
12 mixed readings (6 at full load): mean 0.810, sd 0.1166, mean + 3 sd 1.159 mm/s
separate baselines with sd 0.05: alert at 0.85 (60 percent) and 1.03 mm/s (full load)
rise needed at 60 percent load to cross: mixed limit 66 percent, own limit 21 percent
Band alarms: a line at BPFO grows from 0.02 to 0.10 mm/s RMS
band Hz before after ratio
1x 22.0 to 27.0 0.8491 0.8491 1.00
2x 46.5 to 51.5 0.2127 0.2127 1.00
BPFO 72.7 to 75.6 0.0203 0.1002 4.93
BPFI 118.8 to 123.6 0.0027 0.0027 1.00
high 200.0 to 1000.0 0.0279 0.0279 1.00
overall 10.0 to 1000.0 0.8761 0.8816 1.01
overall from the samples: 0.8756 to 0.8810 mm/s, a rise of 0.62 percent
overall by root sum of squares: 0.8763 to 0.8818 mm/s, a rise of 0.62 percent
scatter of the weekly readings: 5.7 percent of the level
line needed to lift the overall level to 1.6 x: 1.09 mm/s RMS (55 times its first value)
Saved trend_baseline_alarm_limits.png

Common Mistakes



  • Setting limits from a table alone when the machine has a history. The table is the ceiling. The machine’s own baseline finds the change earlier, here at 1.02 or 1.40 mm/s against an example boundary of 2.8 mm/s.
  • Taking one reading as the baseline. Use the mean of about ten or more readings in a known good condition, and keep their standard deviation.
  • Putting readings from different loads or speeds on one trend. A healthy machine then shows false falls and rises of 20 percent or more, and a mixed baseline has limits too wide to catch a real fault.
  • Reading the fitted date as the date of failure. It is the date the fitted curve reaches a limit, and its range covers only the scatter of the readings.
  • Watching only the overall level. A bearing line that grows five times moved the overall level of this motor by 0.62 percent.

Summary



  • A baseline is the mean of several readings at one point, in good condition, at a stated speed and load. For the compressor motor it is 0.877 mm/s RMS with a standard deviation of 0.047 mm/s.
  • Limits from the machine’s own history act before absolute limits do. The statistical alert at 1.018 mm/s was crossed in week 19 and the 1.6 times alert at 1.404 mm/s in week 22, which gave 7.4 and 4.4 weeks of warning before the danger limit of 2.194 mm/s.
  • A straight line fitted to the logarithm of the readings gave a growth of 9.6 percent a week and a crossing at week 26.4 (range 26.2 to 26.6). The estimate assumes smooth growth, which real damage does not always follow.
  • Readings are compared only at the same speed and load, or each operating state has its own baseline.
  • Band alarms give each part of the spectrum its own limits, and catch a small line that the overall level hides.

Exercises



1. Eight baseline readings at one point are 1.42, 1.50, 1.38, 1.47, 1.55, 1.44, 1.40 and 1.52 mm/s RMS. Find the baseline, the sample standard deviation, the statistical alert, and the alert and danger limits by the common practice multiples of 1.6 and 2.5.

Answer

The mean is 1.46 mm/s and the sample standard deviation is 0.0602 mm/s. The statistical alert is mm/s. The multiples give an alert at 2.34 mm/s and a danger limit at 3.65 mm/s. The danger limit must then be checked against the absolute limit for the machine class.

2. At one point the reading was 1.50 mm/s in week 10 and 2.10 mm/s in week 14. Assume exponential growth. Find the growth rate per week, the doubling time, and the week in which a danger limit of 3.00 mm/s is reached.

Answer

per week, which is 8.8 percent a week. The doubling time is weeks. The limit is reached at , so during week 19. Two readings give no range, and the estimate must be repeated with each new reading.

3. A pump has an overall velocity of 2.00 mm/s RMS, which includes a line of 0.05 mm/s RMS at a bearing frequency. The line grows to 0.40 mm/s RMS and nothing else changes. Find the new overall level, its rise in percent, and the rise of the band that holds the line.

Answer

mm/s, a rise of 1.9 percent. The band level rises 8 times. A band alarm at 1.6 or 2.5 times its own baseline acts long before the overall level moves.

4. A gearbox point reads 1.10 mm/s RMS at 50 percent load and 1.50 mm/s at 100 percent load when healthy, and the level is taken to rise in a straight line with load. The scatter is 0.06 mm/s. A reading of 1.45 mm/s is taken at 70 percent load. Judge it against the full load baseline and against the correct baseline.

Answer

Against the full load baseline of 1.50 mm/s the reading is 3.3 percent low and appears healthy. The baseline at 70 percent load is mm/s. The reading is 15 percent above it, and above the statistical alert of mm/s. It is below the 1.6 times alert of 2.02 mm/s. Repeat the reading at the same load.

5. A route has 18 points, each read weekly, and each healthy reading crosses its alert by chance with a probability of 0.75 percent. Find the expected number of false alarms in a year. Then find it under the rule that two readings in a row must cross, assuming that the readings are independent. Each false alarm costs 40 currency units of a technician’s time.

Answer

There are readings a year. One reading alone: false alarms, costing 281 currency units. Two in a row: false alarms, costing about 2 currency units. The price of the rule is one interval of delay on a real alarm, which is a reason to repeat a high reading at once and not wait a week.

References



  • R. B. Randall, Vibration-based Condition Monitoring: Industrial, Automotive and Aerospace Applications, 2nd edition, Wiley, 2021.
  • C. Scheffer and P. Girdhar, Practical Machinery Vibration Analysis and Predictive Maintenance, Newnes (Elsevier), 2004.
  • ISO 20816-1:2016, Mechanical vibration. Measurement and evaluation of machine vibration. Part 1: General guidelines.
  • ISO 13373-1:2002, Condition monitoring and diagnostics of machines. Vibration condition monitoring. Part 1: General procedures.


© 2021-2026 SiliconWit®. All rights reserved.
weekly reading at A2H (same speed, same load) Baseline (first 12) Alert and danger limits New reading Above a limit? Rising? How fast? inspect plan
From a weekly reading to a decision
1× 2× BPFO BPFI bearing bands high band mm/s Hz 22 27 46.5 51.5 72.7 75.6 118.8 123.6 200 1000 logarithmic frequency axis; line heights are an example
Bands on the spectrum of the compressor motor
Predict first

A motor's weekly reading has been very steady: 0.88 mm/s, varying by only about 0.05 mm/s. Which alert will warn earlier when a fault starts to grow?

Watch it build: three kinds of limit
0 weeks 1 to 12 baseline 0.877 2.8 zone C twice the baseline, 1.75, is below 2.8 ×2.5 = 2.19 ×1.6 = 1.40 +3s = 1.02 ISO 1.58
  1. Twelve healthy weeks give the baseline, 0.877 mm/s. The absolute boundary, 2.8, sits far above it.
  2. Multiples of the baseline: alert at 1.6 × 0.877 = 1.40, danger at 2.5 × 0.877 = 2.19 mm/s.
  3. The scatter gives a closer alert, 0.877 + 3 × 0.047 = 1.02. The standard's alarm: 0.877 + 0.25 × 2.8 = 1.58.
baseline+2 s+3 s +2 s: 4 % of healthy readings2 false alarms a year+3 s: 0.75 %1 in 2.5 years One weekly reading. Limits set from 12 readings.
healthy, full load25 % rise, 60 % load 0.700.880.880.875 60 % baselinereadingfull load baselinereading +26 %: false alarm−0.6 %: fault missed
See it: the trend arrives one week at a time

Latest reading
Growth, fitted
Danger expected at week

The 26 weekly readings of Application 1, as printed in the lesson (so the limits differ from the lesson's in the third figure). Baseline and limits come from weeks 1 to 12. Grey dashes: baseline. Gold: the statistical alert, mean plus three standard deviations. Gold dashes: 1.6 times the baseline. Coral: danger, 2.5 times the baseline. From the first crossing of the statistical alert (week 19), a straight line is fitted to the logarithm of the readings and carried forward; the bracket on the danger line is the range from the slope plus and minus two standard errors.

Check yourself

Three questions. Each wrong choice is a mistake people really make, so read the note after you answer.

1. A fan's first 12 weekly readings give a baseline of 1.20 mm/s with a standard deviation of 0.04 mm/s. Where is the statistical alert used in this lesson?

2. A reading rose from 2.0 to 2.4 mm/s over the last 4 weeks, and the rise looks exponential (the same percentage each week). The danger limit is 3.0 mm/s. About how many more weeks until it is reached, if the growth stays smooth?

3. A pump runs at full load on weekdays and at half load at weekends. Its baseline was set from weekday readings. A weekend reading is 15 percent below the baseline. What do you conclude?

Found this useful?

Discussion

    Comments show your name. Be kind, stay on the topic.