A cold store has forty sensors and a screen full of numbers, and when a customer rejects a load of produce, none of the numbers can show that the room stayed cold. The energy bill rose by a tenth last quarter, and nobody can say which machine took it. The sensors were bought one at a time, because they were cheap or a supplier offered them, and no reading was ever tied to a decision. This lesson works the other way: from the questions the owner must answer to a one-page measurement plan, in which every instrument has a reason, a required uncertainty and a date for its next check. You will also put a defended ± on the two figures the owner quotes most. #MeasurementPlan #Instrumentation #EnergyMonitoring

Learning Objectives

By the end of this lesson, you will be able to:

  1. State the question and the decision that each measurement on a site supports
  2. Derive the required uncertainty of a measurement from the decision, and compare it with the uncertainty achieved
  3. Choose the measuring point, instrument, range and sample interval for each measurand
  4. Describe how a fault and a gap in the record will be recognised for each signal
  5. Calculate the expanded uncertainty of a daily energy figure and of a room temperature claim

Real-World System Problem: A cold store with four machines



A cold store keeps fresh produce at 4 °C. Two compressors cool the room. A borehole pump fills a tank that supplies the condensers and the wash area. A standby generator supplies the site when the mains fail. The owner pays for electricity, water treatment and diesel, and must show customers that their product was kept inside 2 to 8 °C.

CT + meterCT + meterPt100PLtype KmainsCompressor 1 (62 A)Compressor 2Coldroom4°CBorehole pumpTankGenerator (standby)exhaust+ load meter
The site and its measuring points

The instruments are the ones used throughout this course.

A list of instruments is not a plan. A plan says what each reading is for, how good it must be, how often it is taken, how a bad reading is recognised, and when the instrument is checked.

Fundamental Theory: From a decision to a measurement



Start from the question

Every measurement in a plan answers a question, and every question leads to a decision that someone will take. “Is compressor 1 using more energy than last month?” leads to “call the service company or not”. If nobody would act on the reading, the measurement does not belong in the plan.

The measurand must then be named exactly. “Temperature” is not a measurand. “Air temperature in the product zone of room 1” is. The terms in this lesson have the meanings of the international vocabulary (VIM, JCGM 200:2012).

Work the required uncertainty backwards

The decision fixes how good the measurement must be. Two working rules, rules of practice and not laws, cover most site decisions, and the plan must say which one was used.

Required expanded uncertainty

is the smallest change that must lead to action. is the margin between the normal value and the nearest limit, and is the swing of the indication in normal control. All are in the unit of the measurand, and is an expanded uncertainty for .

The first rule keeps a change of clearly outside the doubt: the bars of ± before and after it cannot touch. The second rule says that the indication, at the edge of its normal swing, must still be more than inside the limit.

Buying a better instrument than the decision needs wastes money. Buying a worse one wastes all of it, because the reading cannot support the decision.

Point, instrument and range

The measuring point decides what the instrument really sees. A probe in the wrong air and a pressure tapping after the wrong valve both give exact readings of the wrong measurand. Where the limit is a percent of span, choose the smallest standard range that still contains the highest value the process can reach (a pump against a closed valve, a pressure surge), so that normal operation sits as high in the range as that allows. State the range in the plan. On this site the pump line runs at 4.0 bar on a 0 to 10 bar transmitter, only 40 percent of span. That is acceptable because its budget still meets the requirement; if the pump cannot pass 6 bar against a closed valve, a 0 to 6 bar transmitter would do better.

Sample interval

The sample interval follows from how fast the measurand can change and from how quickly the decision must be taken. Sample slowly changing signals at a fraction of their response time, and for fast events keep the fast sampling in the local controller and record a minimum, mean and maximum for each interval. A quantity that is a total, such as energy, should be read from a register that counts in the instrument itself. The total then survives a gap in the record.

Faults and gaps

A plan must say how each signal shows that it cannot be trusted. Three states must stay apart in the record: a measurement, a fault, and no data.

SignalHow a fault shows
4 to 20 mA loopCurrent at or below 3.6 mA or at or above 21 mA (failure signalled, NAMUR NE 43); 0 mA (broken wire or no supply)
Pt100Resistance far outside the range: very high for an open circuit, near zero for a short
ThermocoupleOpen-circuit detection of the input; an indication that follows the enclosure and not the process
Current transformer and meterNegative power in one phase; one phase at zero while the others carry current
Any signalNo change at all for a long time; a step with no cause in the process; disagreement with a related signal

A gap is a period with no samples. Find it by counting: each sample carries the time it was taken, and the number received in a period is compared with the number expected. Never fill a gap with the last value: a record that shows 4.0 °C through an hour with no data is a false record.

Calibration schedule

Each instrument gets an interval for calibration and a quick field check between calibrations. The first interval comes from the maker’s drift figure, and later intervals come from the as-found history of the instrument.

The limit of a plan

A plan covers the questions that were asked when it was written, and a new question needs a new row. The required uncertainties rest on thresholds that the owner chose, such as “act on a 5 percent rise”. If the threshold changes, the row must be worked again.

Application 1: The measurement plan for the cold store



Step 1: Required uncertainty for each question

Click to reveal the five requirements
  1. Compressor energy. A change must be detected.

    ✅

  2. Room temperature. A limit must be proved. The nearest limit is 2 °C, which is 2.0 °C from the setpoint, and the swing is 0.5 °C.

    ✅

  3. Pump pressure. bar. ✅

  4. Tank level. m. ✅

  5. Exhaust temperature. . ✅

Step 2: Achieved against required

Click to reveal the comparison
  1. Exhaust. Two rectangular limits, 1.8 °C and 1.0 °C:

    ✅

  2. The comparison.

    MeasurandRequired Achieved Result
    Compressor energy1.67 %1.63 %Meets, with no room to spare
    Room temperature1.5 °C1.23 °CMeets
    Pump pressure0.10 bar0.08 barMeets
    Tank level0.10 m0.08 mMeets
    Exhaust temperature10 °C2.4 °CMeets, four times better than needed

    ✅

  3. What the comparison says about cost. The exhaust needs no better than 10 °C. A class 2 thermocouple (limit 3.4 °C at 450 °C) would give and still meet the requirement. The energy row has no margin: a transformer loaded at a small part of its rating would fail it. ✅

Step 3: Sample intervals, faults and gaps

Click to reveal the choices
  1. Room temperature: 1 minute. A sheathed probe in moving air has a time constant of some tens of seconds, so a faster interval adds no information. One minute gives 1440 samples in a day, which is the expected count for the test of gaps. ✅

  2. Energy: the register every 15 minutes, power every minute. The daily energy is the difference of two register readings, so a lost sample loses detail and not energy. ✅

  3. Pressure: 10 seconds while the pump runs. Protection that must act in a second stays in the pump controller. ✅

  4. Level: 1 minute. A tank level moves by centimetres in a minute. ✅

  5. Exhaust and load: 10 seconds while the generator runs. A load step moves the exhaust within tens of seconds, and the two must be compared at the same moment. ✅

  6. Cross-checks. Pairs of signals test each other: the pump runs and the tank level does not rise, or a compressor takes energy and the room does not cool. ✅

Step 4: The plan

Click to reveal the one-page plan
  1. The table. One row for each question. Scroll sideways on a small screen.

    QuestionMeasurandPointInstrument and rangeRequired () and its sourceSample intervalFault or gap recognised byCalibration
    Is a compressor using more energy than before?Electrical energy per day, each compressorCompressor feeder, all three phases100:5 A class 1 current transformers, class 1 energy meter1.67 %: one third of the 5 % rise that leads to a service callRegister 15 min, power 1 minNegative power in a phase; one phase at zero; register that does not rise while the room coolsCompared with a reference meter that has a current certificate, at fitting and every 2 years, by a licensed electrician
    Did the product zone stay inside 2 to 8 °C?Air temperature in the product zoneReturn air at product height, away from the door and the evaporator outletClass B Pt100, three-wire, input −50 to +50 °C1.5 °C: 2.0 °C from setpoint to the nearest limit, less 0.5 °C of swing1 minResistance outside the range; no change for an hour; fewer than 1440 samples in a dayIce point every 12 months; mapping of the room once and after any change of layout
    Has the pump or its line changed?Discharge pressurePump discharge, after the non-return valveTransmitter 0 to 10 bar, 4 to 20 mA0.10 bar: one third of the 0.3 bar change that leads to an inspection10 s while runningCurrent at or below 3.6 mA or at or above 21 mA; 0 mAFive points every 12 months; zero check at each visit
    Is there enough water, and does the tank fill when the pump runs?Water levelTank, transmitter at a recorded height above the floorHydrostatic transmitter 0 to 10 m, 4 to 20 mA0.10 m: one third of the 0.3 m between the low alarm and the outlet1 minSame current tests; level that does not rise while the pump runsEvery 12 months; compared with a dip tape at each visit
    Is the engine losing condition?Exhaust temperature, with electrical loadExhaust pocket; generator outputType K class 1, sheathed; class 1 meter with current transformers10 °C: one third of the 30 °C rise at equal load10 s while runningOpen-circuit detection; indication that follows the enclosureCompared with a reference thermocouple every 12 months; replaced, not adjusted

    ✅

  2. Check the plan against the questions. Read down the first column: each of the five questions of the owner appears once. Read down the fifth column: each requirement names its decision. Read down the last two columns: no cell is empty. The script repeats the comparison of Step 2 and prints “meets” for all five rows. ✅

Who does the work, and the check before the first record. A plan for a real site also says who may fit each instrument, and how each row is proved on the day it starts. No record counts until its row has passed its check, and the result is the first line of that instrument’s history.

  • Compressor energy. Fitted by a licensed electrician, with the feeder isolated or with shorting terminals. Check: positive power and a believable power factor in each phase; each current against a calibrated clamp meter; power against .
  • Room temperature. Fitted by a technician (low voltage wiring); the controller’s mains side is the electrician’s. Check: a precision 100 Ω resistor at the probe head reads 0.00 °C; then the ice point.
  • Pump pressure. Fitted by a technician, with the line isolated and vented. Check: a loop check with a calibrator at 4, 12 and 20 mA and at the fault currents; then a reference gauge at the test port.
  • Tank level. Fitted by a technician; in a borehole, only after the electrician has isolated and locked off the pump. Check: the level against a dip tape.
  • Generator exhaust. Fitted by the engine maintainer, with the engine stopped and cool. Check: cold and stopped, the indication equals the air temperature; then a reference in a spare pocket at steady load.

Each check is worked in the lesson on that instrument.

Application 2: The two headline figures



productair at30 mzoneprobePt100leadsreadoutplacementself-heatclass Bmismatch±0.05 Ω±1.0 °C0.02 °C±0.32 °C±0.05 Ω(estimate)(estimate)
Where doubt enters the temperature claim

Step 1: Daily energy of one compressor

Click to reveal the energy budget
  1. The budget. The energy is in proportion to the ratio of the transformer and to the reading of the meter, so both sensitivity coefficients are 1 in percent of reading.

    SourceValue (limit)DistributionDivisorStandard uncertaintySensitivity coefficientContribution (% of energy)
    Transformer, class 1±1.0 %Rectangular0.577 %10.577
    Meter, class 1±1.0 %Rectangular0.577 %10.577

    Both rows are Type B. ✅

  2. Combined and expanded uncertainty.

    ✅

  3. In kilowatt hours. kWh.

    ✅

  4. No term for sampling. The figure is the difference of two register readings. The meter did the summing, so the sample interval and any gap in the record add nothing. ✅

Step 2: The air at the probe

Click to reveal the four terms of the measuring chain
  1. Sensor. The class B limit at 4 °C is , so . ✅

  2. Readout. as a limit, so . ✅

  3. Leads. A three-wire connection removes the lead resistance if the two leads are equal. Their difference is what remains: 0.05 Ω is again a limit of 0.128 °C, so . A four-wire connection would make this row zero. ✅

  4. Self-heating. 0.02 °C as a limit gives . ✅

  5. Combined, for the air at the probe.

    The chain alone supports “the air at the probe was at 4.0 °C ± 0.4 °C”. ✅

Step 3: From the probe to the room

Click to reveal the placement term and the claim
  1. Why placement is a term. The claim is about the product zone, and the probe is in one place. The air leaves the evaporator several degrees colder than it returns, warm air enters at the door, and the stacks of product slow the flow. One point cannot represent the whole zone without a stated doubt. ✅

  2. The estimate. The probe is in the return air, which has passed the product and is near the warm end of the range. Positions in the product zone are taken to lie within ±1.0 °C of it. No measurement on this site supports that figure yet: it is an estimate, recorded as one, until a mapping of the room with several loggers for a day replaces it. As a rectangular limit: . ✅

  3. The full budget.

    SourceValue (limit)DistributionDivisorStandard uncertaintySensitivity coefficientContribution (°C)
    Pt100, class B at 4 °C±0.32 °CRectangular0.185 °C10.185
    Readout±0.05 ΩRectangular0.0289 Ω2.561 °C/Ω0.074
    Lead mismatch, three-wire±0.05 ΩRectangular0.0289 Ω2.561 °C/Ω0.074
    Self-heating±0.02 °CRectangular0.012 °C10.012
    Placement (estimate)±1.0 °CRectangular0.577 °C10.577

    All five rows are Type B. The sensitivity coefficient for the two rows in ohms is per ohm. ✅

  4. Combined and expanded.

    ✅

  5. The claim. The room was held at 4 °C ± 1.2 °C (). ✅

  6. The mean does not help. The mean of 1412 samples has almost no random part, but every row of this budget is a constant bias through the day. An average over time reduces none of them. ✅

  7. Against the limits. With the swing of 0.5 °C, the air in the product zone was between and . That is inside 2 to 8 °C. The alarm thresholds for the indication follow from the same figure: and . ✅

2.03.26.88.0 °CUindication allowedUlimitalarm3.54.04.5alarmlimitnormal swing
Limits, uncertainty and the alarm thresholds

Step 4: Shares, the gap, and a check

Click to reveal the shares and the check
  1. Shares of the variance. Placement 88.1 percent, sensor 9.0 percent, readout 1.4 percent, leads 1.4 percent, self-heating below 0.1 percent. ✅

  2. What an improvement is worth. A class A sensor, with a limit of , lowers from 1.23 to 1.19 °C. A mapping that reduces the placement limit to ±0.3 °C lowers to 0.55 °C with the same class B sensor. ✅

  3. The gap. The record holds 1412 of the 1440 samples expected, which is 98.1 percent. The claim covers those minutes. The 19 minutes without data are stated with the claim and are not filled. ✅

  4. Check a second way. The plain sum of the five limits is , above as it must be. The script draws 400 000 sets of errors at random inside the limits: the standard deviation is 0.615 °C, equal to , and 98.6 percent of the sums are inside ±. One rectangular term dominates, so covers more than 95 percent here. ✅

What the plan does not measure



A plan is honest only if it lists what it omits. This plan does not measure:

  • Product temperature. The Pt100 measures air. The centre of a pallet follows the air slowly: a short excursion of the air does not mean warm product, and a pallet loaded warm stays warm for hours while the air reads 4 °C. A probe in a product simulator would answer that question.
  • Door openings and humidity. A door switch would explain most short temperature peaks.
  • Refrigeration performance. The plan shows the electrical energy a compressor takes, not the cooling it delivers. It cannot tell a compressor that works harder because the day is hot from one that has lost efficiency. That needs outdoor temperature at the least, and refrigerant pressures for a real answer.
  • Water flow and the level in the borehole. Discharge pressure and tank level show that water arrives. They do not give the volume pumped, and they give no warning of a falling water table.
  • Fuel used by the generator. Exhaust temperature against load shows the condition of the engine, not the litres per kilowatt hour.

When one of these becomes a decision, it gets a row.

Verify It in Python



The script finds the five required uncertainties, builds the two budgets, checks the temperature budget by simulation, and compares achieved with required for every row of the plan. It saves two plots: the shares of the temperature claim, and the achieved uncertainty of each row as a percent of the requirement.

measurement_plan.py
"""Measurement plan for a cold store: required uncertainty worked back from
each decision, and the two headline uncertainties (daily energy of one
compressor, and the cold room temperature claim)."""
import numpy as np
import matplotlib.pyplot as plt
ROOT3 = np.sqrt(3.0)
def combine(limits):
"""Rectangular limits (already in the unit of the result) -> u_c."""
u = np.array(limits) / ROOT3
return np.sqrt(np.sum(u**2)), u
# ---------- Part 1: required uncertainty from each decision ----------
print("Required expanded uncertainty (k = 2), worked back from the decision")
need_energy = 5.0 / 3.0 # % : a 5 % rise must be seen
need_room = (4.0 - 2.0) - 0.5 # degC: margin to 2 degC less the swing
need_press = 0.3 / 3.0 # bar
need_level = 0.3 / 3.0 # m
need_exh = 30.0 / 3.0 # degC
print(f" compressor energy: {need_energy:.2f} % of the energy")
print(f" room temperature: {need_room:.2f} degC")
print(f" pump pressure: {need_press:.2f} bar")
print(f" tank level: {need_level:.2f} m")
print(f" exhaust: {need_exh:.1f} degC")
# ---------- Part 2: daily energy of one compressor ----------
E_DAY = 500.0 # kWh recorded in one day
uc_e, u_e = combine([1.0, 1.0]) # transformer and meter, % of reading
U_e = 2.0 * uc_e
print("Daily energy of one compressor")
print(f" transformer u = {u_e[0]:.3f} %, meter u = {u_e[1]:.3f} %")
print(f" u_c = {uc_e:.3f} %, U = {U_e:.2f} % = {E_DAY * U_e / 100:.1f} kWh")
print(f" result: {E_DAY:.0f} kWh +/- {E_DAY * U_e / 100:.0f} kWh (k = 2)")
print(f" smallest change that can be shown (3 U): {3 * U_e:.1f} % = "
f"{3 * E_DAY * U_e / 100:.0f} kWh per day")
# ---------- Part 3: the cold room temperature claim ----------
T_SET = 4.0
R0, A, B = 100.0, 3.9083e-3, -5.775e-7
sens = R0 * (A + 2.0 * B * T_SET) # ohm per degC at 4 degC
tol_b = 0.30 + 0.005 * abs(T_SET) # class B limit, degC
readout = 0.05 / sens # +/- 0.05 ohm readout, degC
lead = 0.05 / sens # +/- 0.05 ohm lead mismatch, degC
self_heat = 0.02 # degC
placement = 1.0 # degC, estimated limit
names = ["Pt100 class B", "readout", "lead mismatch", "self-heating", "placement"]
limits = [tol_b, readout, lead, self_heat, placement]
uc_t, u_t = combine(limits)
uc_probe, _ = combine(limits[:4])
print("Cold room temperature at 4 degC")
print(f" sensitivity {sens:.4f} ohm per degC")
print(" source limit (degC) u (degC) share")
for n, a, u in zip(names, limits, u_t):
print(f" {n:<14} {a:>9.3f} {u:>8.4f} {100 * u**2 / uc_t**2:>5.1f} %")
print(f" air at the probe: u_c = {uc_probe:.3f} degC, U = {2 * uc_probe:.2f} degC")
print(f" air in the room: u_c = {uc_t:.3f} degC, U = {2 * uc_t:.2f} degC")
U_t = round(2 * uc_t, 1)
print(f" claim: held at {T_SET:.0f} degC +/- {U_t:.1f} degC (k = 2)")
print(f" with the control swing of 0.5 degC: {T_SET - 0.5 - U_t:.1f} to "
f"{T_SET + 0.5 + U_t:.1f} degC, inside 2 to 8 degC")
print(f" alarm thresholds for the indication: {2.0 + U_t:.1f} and {8.0 - U_t:.1f} degC")
print(f" plain sum of the limits: {sum(limits):.2f} degC")
uc_map, _ = combine(limits[:4] + [0.3])
print(f" after a mapping that cuts placement to 0.3 degC: U = {2 * uc_map:.2f} degC")
uc_a, _ = combine([0.15 + 0.002 * T_SET] + limits[1:])
print(f" with a class A sensor and no mapping: U = {2 * uc_a:.2f} degC")
# check by simulation
rng = np.random.default_rng(10)
N = 400_000
err = sum(rng.uniform(-a, a, N) for a in limits)
print(f" simulation: standard deviation {err.std():.3f} degC, "
f"inside +/- U: {100 * np.mean(np.abs(err) <= 2 * uc_t):.1f} %")
# completeness of the day's record
got, expected, longest_gap = 1412, 1440, 19
print(f" record: {got} of {expected} samples = {100 * got / expected:.1f} %, "
f"longest gap {longest_gap} min")
# ---------- Part 4: the other rows of the plan ----------
uc_x, _ = combine([max(1.5, 0.004 * 450.0), 1.0])
uc_x2, _ = combine([max(2.5, 0.0075 * 450.0), 1.0])
print("Achieved against required (expanded, k = 2)")
rows = [("compressor energy (%)", U_e, need_energy),
("room temperature (degC)", 2 * uc_t, need_room),
("pump pressure (bar)", 0.08, need_press),
("tank level (m)", 0.08, need_level),
("exhaust, class 1 (degC)", 2 * uc_x, need_exh)]
for name, got_u, need in rows:
print(f" {name:<24} achieved {got_u:>5.2f} required {need:>5.2f} "
f"{'meets' if got_u <= need else 'DOES NOT MEET'}")
print(f" exhaust with a class 2 thermocouple: U = {2 * uc_x2:.1f} degC")
# ---------- Plot ----------
fig, ax = plt.subplots(1, 2, figsize=(10, 4.2))
share = 100 * u_t**2 / uc_t**2
order = np.argsort(share)
ax[0].barh([names[i] for i in order], share[order])
ax[0].set_xlabel("share of the variance (%)")
ax[0].set_title("Room temperature claim")
labels = [r[0] for r in rows]
ratio = [100 * r[1] / r[2] for r in rows]
ax[1].barh(labels, ratio)
ax[1].axvline(100.0, color="black", linestyle="--")
ax[1].set_xlabel("achieved U as a percent of required U")
ax[1].set_title("Every row must stay left of the line")
fig.tight_layout()
fig.savefig("measurement_plan.png", dpi=120)
print("Saved measurement_plan.png")

Expected output

Required expanded uncertainty (k = 2), worked back from the decision
compressor energy: 1.67 % of the energy
room temperature: 1.50 degC
pump pressure: 0.10 bar
tank level: 0.10 m
exhaust: 10.0 degC
Daily energy of one compressor
transformer u = 0.577 %, meter u = 0.577 %
u_c = 0.816 %, U = 1.63 % = 8.2 kWh
result: 500 kWh +/- 8 kWh (k = 2)
smallest change that can be shown (3 U): 4.9 % = 24 kWh per day
Cold room temperature at 4 degC
sensitivity 0.3904 ohm per degC
source limit (degC) u (degC) share
Pt100 class B 0.320 0.1848 9.0 %
readout 0.128 0.0739 1.4 %
lead mismatch 0.128 0.0739 1.4 %
self-heating 0.020 0.0115 0.0 %
placement 1.000 0.5774 88.1 %
air at the probe: u_c = 0.213 degC, U = 0.43 degC
air in the room: u_c = 0.615 degC, U = 1.23 degC
claim: held at 4 degC +/- 1.2 degC (k = 2)
with the control swing of 0.5 degC: 2.3 to 5.7 degC, inside 2 to 8 degC
alarm thresholds for the indication: 3.2 and 6.8 degC
plain sum of the limits: 1.60 degC
after a mapping that cuts placement to 0.3 degC: U = 0.55 degC
with a class A sensor and no mapping: U = 1.19 degC
simulation: standard deviation 0.615 degC, inside +/- U: 98.6 %
record: 1412 of 1440 samples = 98.1 %, longest gap 19 min
Achieved against required (expanded, k = 2)
compressor energy (%) achieved 1.63 required 1.67 meets
room temperature (degC) achieved 1.23 required 1.50 meets
pump pressure (bar) achieved 0.08 required 0.10 meets
tank level (m) achieved 0.08 required 0.10 meets
exhaust, class 1 (degC) achieved 2.38 required 10.00 meets
exhaust with a class 2 thermocouple: U = 4.1 degC
Saved measurement_plan.png

The pressure and level figures of 0.08 are entered as given data, because their budget is worked in full elsewhere in the course.

Common Mistakes



  • Starting from the catalogue and not from the question. An instrument with no decision behind it produces a number that nobody uses and that still needs calibration.
  • Quoting the uncertainty of the sensor as the uncertainty of the claim. The chain here was good to 0.4 °C and the room claim was good to 1.2 °C, because the probe is in one place.
  • Filling a gap with the last value, or drawing a line across it. A gap is reported as a gap, with its length.
  • Averaging many samples and expecting the ± to fall. An average reduces random scatter only. Tolerance, lead mismatch and placement are constant through the day.
  • Setting an alarm exactly at the limit. The alarm must be at least inside it, or the limit can be passed before the alarm sounds.

Summary



  • A measurement plan starts from a question and a decision, and works back to the required uncertainty: one third of the change that must be detected, or the margin to a limit less the normal swing.
  • For the cold store, all five measurements meet their requirement. The energy row has no margin and the exhaust row has more than it needs.
  • The daily energy of one compressor is 500 kWh ± 8 kWh (k = 2), from two equal class 1 terms.
  • The room was held at 4 °C ± 1.2 °C (k = 2). The measuring chain gives ±0.4 °C of that, and the placement of the probe gives the rest.
  • The plan lists what it does not measure, so that nobody assumes the record holds more than it does.

Exercises



1. A freezer room has a setpoint of −18 °C, and the product must stay at or below −15 °C. The controller keeps the indication within ±1.0 °C of the setpoint. Find the required expanded uncertainty of the room temperature.

Answer

The margin from the setpoint to the limit is 3.0 °C, and the swing is 1.0 °C. .

2. The freezer of exercise 1 has a class B Pt100 on a four-wire connection, a readout with a limit of ±0.05 Ω, and an estimated placement limit of ±1.5 °C. The sensitivity at −18 °C is 0.393 Ω per °C. Find the expanded uncertainty () of the room temperature. Does it meet the requirement?

Answer

Class B at −18 °C: . Readout: . The leads add nothing with four wires. , so . It meets the 2.0 °C, with little margin, and placement holds 93 percent of the variance.

3. A pressure is sampled every 10 seconds. How many samples are expected in a day? A day’s record holds 8210 samples. What is its completeness in percent?

Answer

samples. Completeness: percent. The 430 missing samples are 72 minutes without data, and the record must say where they fall.

4. Two compressors use 500 kWh and 430 kWh in a day, each measured with percent (). Find the total and its expanded uncertainty (a) if the errors of the two meterings are independent, and (b) if they are fully shared, as two sets of the same model may be.

Answer

The total is 930 kWh. The two values of are 8.15 and 7.01 kWh. (a) kWh. (b) Shared errors add directly: kWh. The honest statement is 930 kWh with an expanded uncertainty between 11 and 15 kWh, and the cautious choice is 15 kWh.

5. After the condensers are cleaned, the daily energy of compressor 1 falls from 500 kWh to 480 kWh under similar weather. The metering has percent (). Find the expanded uncertainty of the saving (a) if the errors on the two days were independent, and (b) if the error is a constant percentage that is the same on both days. Which case is closer to the truth, and what other doubt remains?

Answer

The saving is 20 kWh. (a) is 8.15 kWh and 7.82 kWh for the two days, so kWh: the saving would be 20 ± 11 kWh. (b) A constant percentage error acts on the difference only: percent of 20 kWh is 0.33 kWh. The same transformer and meter were used at almost the same current, so most of the error is shared and case (b) is closer. The larger doubt is not in the metering: it is whether the weather and the load were truly similar on the two days.

References



  • JCGM 100:2008, Evaluation of Measurement Data: Guide to the Expression of Uncertainty in Measurement (GUM), Joint Committee for Guides in Metrology, 2008.
  • J. P. Bentley, Principles of Measurement Systems, 4th edition, Pearson Education, 2005.
  • IEC 60751:2022, Industrial Platinum Resistance Thermometers and Platinum Temperature Sensors, International Electrotechnical Commission.
  • IEC 61869-2:2012, Instrument Transformers, Part 2: Additional Requirements for Current Transformers, International Electrotechnical Commission.


© 2021-2026 SiliconWit®. All rights reserved.
mains CT + meter Compressor 1 (62 A) CT + meter Compressor 2 Cold room 4 °C Pt100 Borehole pump P Tank L Generator (standby) exhaust type K + load meter measuring point
product zone placement ±1.0 °C (estimate) air at probe self-heat 0.02 °C Pt100 class B ±0.32 °C 30 m leads mismatch ±0.05 Ω (estimate) readout readout ±0.05 Ω
U U indication allowed normal swing limit limit alarm alarm 2.0 3.2 3.5 4.0 4.5 6.8 8.0 °C
Watch it build: one row of the plan
decisionmeasurandU neededrangesamplefault a 0.3 bar move normal 4.0 barinspect if it moves PT discharge pressure after the valve 0.10 bar, has 0.08 0 to 10 bar 4.0 bar = 40 % every 10 s 3.6, 21, 0 mA
  1. The question: has the pump or its line changed? The decision: inspect on a 0.3 bar move.
  2. The measurand, named exactly: the discharge pressure, after the non-return valve.
  3. To see 0.3 bar, U must be at most 0.10 bar; this chain gives 0.08 bar.
  4. Range 0 to 10 bar: the line runs at 4.0 bar, 40 % of span, and the budget still meets.
  5. One sample every 10 s while the pump runs; fast protection stays in the pump controller.
  6. Faults: at or below 3.6 mA, at or above 21 mA, or 0 mA for a broken wire.
Predict first

A room probe has an expanded uncertainty of ±1.2 °C. It records 1412 readings in a day, and their mean is 4.0 °C. What is the uncertainty of that daily mean?

480500512.5525545 kWh last monththis monthclear space D = 25 kWh, doubt ±8.3 each
filled: looks calm, is falsemarked: 19 min, no data ? Measurement, fault and no data stay apart.
See it: can the room claim be signed?

U achieved (k = 2)
U required
Share of the probe's place

The measuring chain of Application 2 (class B Pt100, readout, three-wire leads, self-heating) gives ±0.43 °C by itself; the placement limit is the doubt about how far the air at the probe is from the rest of the product zone. The gold band is the indication in normal control. The green band adds the expanded uncertainty on each side: the air was somewhere inside it. The claim can be signed only while that band stays inside 2 to 8 °C. The chain terms are held at their 4 °C values.

Check yourself

Three questions. Each wrong choice is a mistake people really make, so read the note after you answer.

1. A medicine fridge must stay inside 2 to 8 °C. Its setpoint is 5 °C, and the controller keeps the indication within ±1.0 °C of it. What expanded uncertainty must the temperature measurement have, to prove the limits are kept?

2. A cold room must stay at or below 8 °C, and its temperature claim has an expanded uncertainty of ±1.2 °C. At what indication should the high alarm sound?

3. A room is sampled every minute. One day the record holds 1410 of the 1440 samples: the network was down for 30 minutes. The software has filled those minutes with the last value, 4.0 °C. What should the record show?