Energy Economics and Measurement and Verification

Decide what an energy project is worth before you spend, and prove what it saved after, so that nobody can argue with the number. Ten lessons on four real projects.

Found this useful?
The first year of the pump drive, month by month: twelve bars of the saving for each running hour against the planned 0.883 kW. The first seven bars sit near the plan; from month 8 the bars fall below it. Beside them, the yearly saving as a dot with its range, and the plan still inside that range.

A supplier promises that a new drive will cut the pumping bill by thirty percent. A year later the bill is higher, the supplier says the weather was hot, and nobody can prove anything. On another site the contractor brings one power reading that shows a saving of 38 percent, and the owner brings twelve bills that show nothing. Both are honest, and there is no way to choose.

In this course you judge a project by its whole life, draw the line round what a claim covers, take the weather out with a baseline, and put a range on the saving. Then you write the plan before the work starts, and a one-page report that a finance manager and an auditor can both accept.

From a promise to a proved saving
  1. 1Judge the whole lifeThe purchase is under one percent of what a motor costs to own.
  2. 2Draw the boundaryEach flow that crosses it is measured, or estimated and said so.
  3. 3Take the weather outCompare with what the site would have used this month, not with last year's bill.
  4. 4State the range13,857 kWh avoided, and how far the true figure could be.
You will be able to
  1. Judge a project by NPV, IRR and life-cycle cost, not by payback alone
  2. Build a baseline that takes out the weather and production, and put a range on the saving
  3. Write a plan before the work, and a report that a finance manager and an auditor both accept

New to this? New to energy projects? Start with lesson 1: simple payback, and what it does not see.

You need A computer with Python, numpy, scipy and matplotlib. The data of all four projects are in the lessons.

The engineering behind it

What a project is worth before you spend, and how to prove what it saved after, so that nobody can argue with it.

Lessons
Lesson 1 · 21 minSimple Payback and Its LimitsCost divided by yearly saving: a quick first screen, and why two equal paybacks can earn 20,000 or 240,000.Simple paybackProject lifeContinuing costs Lesson 2 · 23 minThe Time Value of Money: NPV and IRRGive money a date: NPV, IRR and discounted payback for a pump drive and a capacitor bank.Present valueNPVIRRDiscounted payback Lesson 3 · 25 minLife-Cycle CostA motor 18,000 cheaper to buy costs 52,000 more in electricity every year. Put both in one number.Life-cycle costAnnual costBreak-even hours Lesson 4 · 25 minEnergy Audits and What to MeasureDivide a bill of 42,000 kWh among the loads that caused it, and label each figure measured, logged or estimated.Energy balanceLoad factorLogging periodAudit levels Lesson 5 · 23 minThe Measurement Boundary and the Four OptionsDraw the line round what a claim covers, and choose a method that can see the saving.BoundaryInteractive effectsIPMVP optionsMeter choice Lesson 6 · 24 minBaselines and Routine AdjustmentsA model of what the site would have used, adjusted to the weather it really met.RegressionDegree daysAvoided energyNormalised savings Lesson 7 · 23 minNon-Routine AdjustmentsA new 9 kW load cut a saving from 11.46 to 4.61 percent. Find the change and correct it in a way both sides accept.Static factorsResidualsSub-meteringAdjustments Lesson 8 · 23 minHow Sure Is the Saving?Put a range on a saving, find the term that decides it, and know when the range is too wide to report.Standard uncertaintyRMSEExpanded rangeVariance share Lesson 9 · 24 minWriting a Measurement and Verification PlanThe document agreed before the work, so the result cannot be argued afterwards.Plan itemsMetersPrecisionM&V cost Lesson 10 · 25 minReporting Verified SavingsA one-page report: what was measured, what was estimated, and the saving with its range.Measured and estimatedAdjustmentsRangeEvents
More about this course

Every number has a reason

A saving is the difference between what was used and what would have been used. Only the first can be measured, so each number says how far the estimate can be trusted.

  • 4 and 15 yearstwo projects with the same 3-year payback, and net benefits of 20,000 against 240,000Payback
  • 12 percentthe cost of money: the drive keeps an NPV of 73,377 and an IRR of 28.9 percent over 10 yearsTime value
  • 0.53 percentthe pump saving as a share of the site meter; on the pump's own meter it is 37.7 percentBoundary
  • ± 828 kWhthe expanded range of 13,857 kWh avoided: 11.46 percent means 10.8 to 12.1Uncertainty
  • 11.9 percentwhat measurement costs against the expected saving, a little above the usual guide of about 10 percentPlan

Agree the method before the work, not after it.

Compare the bills
Argued afterwards
  • Hours, price and method left open
  • Weather and new loads hidden in the total
  • A saving of 0.53 percent of the site is too small to see

The test: who wins the argument?

An agreed plan
Fixed before the work
  • Boundary, option and baseline written down
  • Meters fitted before the project starts
  • The saving stated with its range

The test: can an auditor follow every number?

The tools

PythonEach lesson works the numbers by hand, then checks them in Python.
Four projectsA pump drive, a capacitor bank, cold room measures and a lighting change.
IPMVP optionsA to D. The current edition of the protocol decides the detail.
ASHRAE Guideline 14The uncertainty formula to use when a contract depends on it.
A one-page reportMeasured apart from estimated, energy apart from money.
Currency unitsMoney in plain units, so every example works in any country.

Honest limits. The course explains the method; it is not the text of any protocol. A report is only as good as the record under it. Where owner and contractor see the same record all year, the final report holds nothing new to either.

Before you start

The full course notes

A supplier promises that a new drive will cut the pumping bill by thirty percent. A year later the bill is higher, the supplier says the weather was hot, and nobody can prove anything. The argument was lost before the project began, on the day nobody wrote down how the saving would be measured. This course is about deciding what a project is worth, and then proving what it delivered. #EnergySavings #MeasurementAndVerification #Payback

It follows four real kinds of project through every lesson: a variable speed drive on a pump, a power factor correction bank, a cold room door curtain and condenser cleaning, and a lighting change. Each lesson works real numbers by hand and checks them in Python.

What you need

A computer with Python, and three libraries.

Terminal window
pip install numpy scipy matplotlib

Lessons

Lesson 1: Simple Payback and Its Limits

The quickest test of a project, and the three ways it misleads.

Open

Lesson 2: The Time Value of Money: NPV and IRR

Compare a cost today with savings spread over years.

Open

Lesson 3: Life-Cycle Cost

Why the cheapest pump to buy is often the dearest to own.

Open

Lesson 4: Energy Audits and What to Measure

From a walk-through to an investment-grade audit, and the measurements each needs.

Open

Lesson 5: The Measurement Boundary and the Four Options

Decide what is inside the claim before a single reading is taken.

Open

Lesson 6: Baselines and Routine Adjustments

Say what the site would have used, in the conditions it really met.

Open

Lesson 7: Non-Routine Adjustments

What to do when the site itself changes during the project.

Open

Lesson 8: How Sure Is the Saving?

Put a range on a saving, and know when the range swallows it.

Open

Lesson 9: Writing a Measurement and Verification Plan

The document that is agreed before the project, so the result cannot be argued afterwards.

Open

Lesson 10: Reporting Verified Savings

A savings report that a finance manager and an auditor can both accept.

Open

What this course does not cover

This course explains the method. It is not the text of any protocol or standard, and it does not prepare you for anyone’s certificate. Where a contract names a protocol, the current edition of that protocol decides.



© 2021-2026 SiliconWit®. All rights reserved.

10 lessons, in order.

SiliconWit makes these courses. We also run siliconwit.io, a monitoring service.